Continuous improvement logidtics project: A study on the increase of the finished goods warehouse of Unilever at Sta. Iria
Contribuinte(s) |
Soeiro, Filipe Castro |
---|---|
Data(s) |
08/05/2015
08/05/2015
01/05/2014
|
Resumo |
This project is called Improvement Logistics Project and aims to study an opportunity of expansion of the output in 80% of the Unilever warehouse at Sta. Iria via an increase in exportations for the next two years. This has been done using the Distibuidora Luís Simões tariff rates as basis of comparison for the as-is and to-be situations. For this matter, an allocation of all the costs of the warehouse is prepared and described with the goal of comparing the differences with and without expansion. The results show that a better outcome is achieved with the investment, but the warehouse is yet to prove its efficiency against the distribution company. NSBE - UNL |
Identificador |
http://hdl.handle.net/10362/14900 201530619 |
Idioma(s) |
eng |
Direitos |
openAccess |
Tipo |
masterThesis |