866 resultados para Project 2007-001-EP : Interoperable Standards Development
Resumo:
Mode of access: Internet.
Resumo:
Cover title.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Cover title.
Resumo:
The following activities are specifically identified as ineligible. 1. Construction of buildings, or portions thereof, used predominantly for the general conduct of government (e.g., city halls, courthouses, jails, police stations). 2. General government expenses. 3. Costs of operating and maintaining public facilities and services (e.g., mowing parks, replacing street light bulbs). 4. Servicing or refinancing of existing debt.
Resumo:
Funding agreement no.: R-31-20-X-0141-166.
Resumo:
Cover title.
Resumo:
This executive summary report summarizes the results of an alternative evaluation and preliminary design study for improvements to, or removal of, the Glen D. Palmer Dam in Yorkville, Illinois. This study was conducted to recommend the best method of improving the hydraulic conditions at the downstream face of the dam, reconnect the river with respect to fish movement, and provide safe canoe passage through the dam site. The recommended alternative was developed by working with a Citizen Advisory Committee to involve the public throughout the study.
Resumo:
"ETA Occasional Paper 2008-03."
Resumo:
"Serial no. 110-21."
Resumo:
"Serial no. 110-6."
Resumo:
"June 22, 2006."
Resumo:
[Conceptual Sketch of Site Plan], untitled. Ink sketch on graph paper with marker coloring, 8 1/2 x 11 inches [from photographic copy by Lance Burgharrdt]
Resumo:
[Conceptual Sketch of Site Plan] with 30 Cabins. Ink sketch on graph paper, with marker coloring, initialed, 8 1/2 x 11 inches [from photographic copy by Lance Burgharrdt]