910 resultados para Nonprofit organisations


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides the findings of a national review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different sate road authorities. The investment objectives of Australian road authorities are based on triple-bottom line considerations (social, environmental, economic and political). In some cases, comparing with some social considerations, such as regional economic development, equity, and access to pubic service etc., Benefit-Cost Ratio has limited influence on the decision-making. Australian road authorities have developed various decision support tools. Although Multi-Criteria Analysis has been preliminarily used in case by case study, pavement management systems, which are primarily based on Benefit Cost Analysis, are still the main decision support tool. This situation is not compatible with the triple-bottom line objectives. There is need to fill the gap between decision support tools and decision-making itself. Different decision criteria should be adopted based on the contents of the work. Additional decision criteria, which are able to address social, environmental and political impacts, are needed to develop or identify. Environmental issue plays a more and more important role in decision-making. However, the criteria and respective weights in decision-making process are yet to be clearly identified. Social and political impacts resulted from road infrastructure investment can be identified through Community Perceptions Survey. With accumulative data, prediction models, which are similar as pavement performance models, can be established. Using these models, the decision-makers are able to foresee the social and political consequences of investment alternatives.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The National survey was the third phase in an ongoing initiative to identify critical success factors in ICT mediated supply chains. This study has been designed to harness the tacit and explicit knowledge to be found on the subject from the widest range of appropriate sources. At its core is the assumption that, provided with the fullest list of candidate success factors, a representative sample of experienced industry-based practitioners will (with the aid of statistical analysis) reveal a set of critical success factors. A postal survey has been judged to be the most appropriate mechanism for achieving this outcome.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate ― Now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption impediments peculiar to the nature of construction. This chapter examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of impediments (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this chapter. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major impediments were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 impediments were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that impediments to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs. The large-scale industry survey and 12 innovation case studies on which this guide are based were carried out by The BRITE (Building Research, Innovation, Technology and Environment) Project as part of research for the Cooperative Research Centre for Construction Innovation. The stakeholders volunteering to take part in BRITE research included over 400 businesses, 14 government organisations, 8 industry associations and 4 universities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Policy instruments of education, regulation, fines and inspection have all been utilised by Australian jurisdictions as they attempt to improve the poor performance of occupational health and safety (OH&S) in the construction industry. However, such policy frameworks have been largely uncoordinated across Australia, resulting in differing policy systems, with differing requirements and compliance systems. Such complexity, particularly for construction firms operating across jurisdictional borders, led to various attempts to improve the consistency of OH&S regulation across Australia, four of which will be reviewed in this report. 1. The first is the Occupational Health and Safety Act 1991 (Commonwealth) which enabled certain organisations to opt out of state based regulatory regimes. 2. The second is the development of national standards, codes of practice and guidance documents by the National Occupational Health and Safety Council (NOHSC). The intent was that the OHS requirements, principles and practices contained in these documents would be adopted by state and territory governments into their legislation and policy, thereby promoting regulatory consistency across Australia. 3. The third is the attachment of conditions to special purpose payments from the Commonwealth to the States, in the form of OH&S accreditation with the Office of the Federal Safety Commissioner. 4. The fourth is the development of national voluntary codes of OHS practice for the construction industry. It is interesting to note that the tempo of change has increased significantly since 2003, with the release of the findings of the Cole Royal Commission. This paper examines and evaluates each of these attempts to promote consistency across Australia. It concludes that while there is a high level of information sharing between jurisdictions, particularly from the NOSHC standards, a fragmented OH&S policy framework still remains in place across Australia. The utility of emergent industry initiatives such as voluntary codes and guidelines for safer construction practices to enhance consistency are discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sexual harassment can be conceptualised as an interaction between harassers and targets. Utilising 23 detailed legal transcripts, this study explored evidence of a range of perpetrator tactics and target counter-tactics. These tactics can be readily fitted into the backfire framework, which proposes that powerful perpetrators of perceived unjust acts are likely to cover up the actions, devalue the target, reinterpret the events, use official channels to give an appearance of justice, and intimidate or bribe people involved. Targets can respond using counter-tactics of exposure, validation, reframing, mobilisation of support, and resistance. The findings have implications for raising awareness of harassing tactics and recommendations for effective informal responses in organisations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Establishing a framework for measuring the performance of public sector programs is fraught with dangers. Many public sector organisations are satisfied with measuring activity in programs and fail to see the need for establishing a framework that will meet the needs of participants and measure outcomes as well as activities. This paper explores how a government department in Queensland went about establishing a performance management framework to measure the outcomes and activities in a program that was a public private partnership. Findings indicate that using an iterative consultative approach performance measure can be put in place that are meaningful and assist the participants to review the program.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper examines the extent to which women movement into management positions. Like many other countries, this progress in Australia is slow. The paper includes discussion of the theoretical explanations for this and the extent to which these are borne out in Australia. We are aware this group represents only a minority of Australian women workers, and there are many other groups of women workers for whom constraints to women’s access to senior management may not be the most pressing issue. We have, however, chosen to focus on women in management in this paper, as while there was considerable research and public policy attention directed towards this group in the 1980s and early 1990s, over the past decade there seems to have been a reluctance to continue to address this group, despite the numerical evidence that women continue to be disproportionately represented in senior management positions. We believe it’s timely to refocus on women in management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this research is to capture and interpret the stories of “outsider” managers who make the transition to the public sector. These experiences are considered in the context of efforts to shift public management culture in a direction consistent with meeting contemporary demands placed on public sector organisations. It is often noted that an important strategy for changing culture is the infusion of outsiders. Outsiders are thought to bring new perspectives that, through a dialectical process (Van de Ven 1995), create the potential for change. While there have been cross-sector comparisons (Broussine 1990; Silfvast 1994; Redman 1997), little attention has been given to the experience of those who make the transition in the context of efforts to reform public sector management culture. Not only is the infusion of private sector managers into the public sector a potential culture change strategy, it is also a personal experience for those who make the transition. Boundary crossing is typically an anxiety provoking experience (Van Maanen & Schein 1979) and the quality of this experience influences decisions to commit, engage, disengage or exit. The quality of the experience is likely to be affected by how the public organisation responds to people making this transition, that is, their investment in people processing (Saks 2007). The cost of recruitment and selection processes at middle and senior management levels warrants a greater research focus on this transition. In this paper we argue that the experiences of those who make the transition from private to public sectors has much to tell us about the traps that transition managers experience in making this change, the implications for injecting outsider managers as a strategy for achieving public management culture change, and how reform-oriented public organisations can manage the transitions of outsider managers into the public sector in order that best value might be achieved for both the individual and organisational change goals.