911 resultados para managerial power approach.


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The water time constant and mechanical time constant greatly influences the power and speed oscillations of hydro-turbine-generator unit. This paper discusses the turbine power transients in response to different nature and changes in the gate position. The work presented here analyses the characteristics of hydraulic system with an emphasis on changes in the above time constants. The simulation study is based on mathematical first-, second-, third- and fourth-order transfer function models. The study is further extended to identify discrete time-domain models and their characteristic representation without noise and with noise content of 10 & 20 dB signal-to-noise ratio (SNR). The use of self-tuned control approach in minimising the speed deviation under plant parameter changes and disturbances is also discussed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper addresses an uplink power control dynamic game where we assume that each user battery represents the system state that changes with time following a discrete-time version of a differential game. To overcome the complexity of the analysis of a dynamic game approach we focus on the concept of Dynamic Potential Games showing that the game can be solved as an equivalent Multivariate Optimum Control Problem. The solution of this problem is quite interesting because different users split the activity in time, avoiding higher interferences and providing a long term fairness.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

El sector energético, en España en particular, y de forma similar en los principales países de Europa, cuenta con una significativa sobrecapacidad de generación, debido al rápido y significativo crecimiento de las energías renovables en los últimos diez años y la reducción de la demanda energética, como consecuencia de la crisis económica. Esta situación ha hecho que las centrales térmicas de generación de electricidad, y en concreto los ciclos combinados de gas, operen con un factor de utilización extremadamente bajo, del orden del 10%. Además de la reducción de ingresos, esto supone para las plantas trabajar continuamente fuera del punto de diseño, provocando una significativa pérdida de rendimiento y mayores costes de explotación. En este escenario, cualquier contribución que ayude a mejorar la eficiencia y la condición de los equipos, es positivamente considerada. La gestión de activos está ganando relevancia como un proceso multidisciplinar e integrado, tal y como refleja la reciente publicación de las normas ISO 55000:2014. Como proceso global e integrado, la gestión de activos requiere el manejo de diversos procesos y grandes volúmenes de información, incluso en tiempo real. Para ello es necesario utilizar tecnologías de la información y aplicaciones de software. Esta tesis desarrolla un concepto integrado de gestión de activos (Integrated Plant Management – IPM) aplicado a centrales de ciclo combinado y una metodología para estimar el beneficio aportado por el mismo. Debido a las incertidumbres asociadas a la estimación del beneficio, se ha optado por un análisis probabilístico coste-beneficio. Así mismo, el análisis cuantitativo se ha completado con una validación cualitativa del beneficio aportado por las tecnologías incorporadas al concepto de gestión integrada de activos, mediante una entrevista realizada a expertos del sector de generación de energía. Los resultados del análisis coste-beneficio son positivos, incluso en el desfavorable escenario con un factor de utilización de sólo el 10% y muy prometedores para factores de utilización por encima del 30%. ABSTRACT The energy sector particularly in Spain, and in a similar way in Europe, has a significant overcapacity due to the big growth of the renewable energies in the last ten years, and it is seriously affected by the demand decrease due to the economic crisis. That situation has forced the thermal plants and in particular, the combined cycles to operate with extremely low annual average capacity factors, very close to 10%. Apart from the incomes reduction, working in out-of-design conditions, means getting a worse performance and higher costs than expected. In this scenario, anything that can be done to improve the efficiency and the equipment condition is positively received. Asset Management, as a multidisciplinary and integrated process, is gaining prominence, reflected in the recent publication of the ISO 55000 series in 2014. Dealing Asset Management as a global, integrated process needs to manage several processes and significant volumes of information, also in real time, that requires information technologies and software applications to support it. This thesis proposes an integrated asset management concept (Integrated Plant Management-IPM) applied to combined cycle power plants and develops a methodology to assess the benefit that it can provide. Due to the difficulties in getting deterministic benefit estimation, a statistical approach has been adopted for the cot-benefit analysis. As well, the quantitative analysis has been completed with a qualitative validation of the technologies included in the IPM and their contribution to key power plant challenges by power generation sector experts. The cost- benefit analysis provides positive results even in the negative scenario of annual average capacity factor close to 10% and is promising for capacity factors over 30%.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this study was to obtain the exact value of the keratometric index (nkexact) and to clinically validate a variable keratometric index (nkadj) that minimizes this error. Methods: The nkexact value was determined by obtaining differences (DPc) between keratometric corneal power (Pk) and Gaussian corneal power (PGauss c ) equal to 0. The nkexact was defined as the value associated with an equivalent difference in the magnitude of DPc for extreme values of posterior corneal radius (r2c) for each anterior corneal radius value (r1c). This nkadj was considered for the calculation of the adjusted corneal power (Pkadj). Values of r1c ∈ (4.2, 8.5) mm and r2c ∈ (3.1, 8.2) mm were considered. Differences of True Net Power with PGauss c , Pkadj, and Pk(1.3375) were calculated in a clinical sample of 44 eyes with keratoconus. Results: nkexact ranged from 1.3153 to 1.3396 and nkadj from 1.3190 to 1.3339 depending on the eye model analyzed. All the nkadj values adjusted perfectly to 8 linear algorithms. Differences between Pkadj and PGauss c did not exceed 60.7 D (Diopter). Clinically, nk = 1.3375 was not valid in any case. Pkadj and True Net Power and Pk(1.3375) and Pkadj were statistically different (P , 0.01), whereas no differences were found between PGauss c and Pkadj (P . 0.01). Conclusions: The use of a single value of nk for the calculation of the total corneal power in keratoconus has been shown to be imprecise, leading to inaccuracies in the detection and classification of this corneal condition. Furthermore, our study shows the relevance of corneal thickness in corneal power calculations in keratoconus.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose: The aim of this study was to analyze theoretically the errors in the central corneal power calculation in eyes with keratoconus when a keratometric index (nk) is used and to clinically confirm the errors induced by this approach. Methods: Differences (DPc) between central corneal power estimation with the classical nk (Pk) and with the Gaussian equation (PGauss c ) in eyes with keratoconus were simulated and evaluated theoretically, considering the potential range of variation of the central radius of curvature of the anterior (r1c) and posterior (r2c) corneal surfaces. Further, these differences were also studied in a clinical sample including 44 keratoconic eyes (27 patients, age range: 14–73 years). The clinical agreement between Pk and PGauss c (true net power) obtained with a Scheimpflug photography–based topographer was evaluated in such eyes. Results: For nk = 1.3375, an overestimation was observed in most cases in the theoretical simulations, with DPc ranging from an underestimation of 20.1 diopters (D) (r1c = 7.9 mm and r2c = 8.2 mm) to an overestimation of 4.3 D (r1c = 4.7 mm and r2c = 3.1 mm). Clinically, Pk always overestimated the PGauss c given by the topography system in a range between 0.5 and 2.5 D (P , 0.01). The mean clinical DPc was 1.48 D, with limits of agreement of 0.71 and 2.25 D. A very strong statistically significant correlation was found between DPc and r2c (r = 20.93, P , 0.01). Conclusions: The use of a single value for nk for the calculation of corneal power is imprecise in keratoconus and can lead to significant clinical errors.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The European Union (EU) has increasingly become a comprehensive security actor. With the development of the Common Foreign and Security Policy (CFSP), including the Common Security and Defence Policy (CSDP) as a reaction to the failure of the EU to act during the wars in Yugoslavia/Western Balkans in the 1990s, the EU has a wide range of instruments for crisis prevention, crisis management as well as post-crisis intervention at its disposal. Observers typically agree that “hard power” is no longer sufficient to address the complex security challenges of today’s world while the EU, often criticised for only utilising “soft power”, is now able to exercise “smart power”. Through a comprehensive approach, facilitated by the Lisbon Treaty, the EU can now use the various instruments at its disposal, such as diplomacy, development aid, humanitarian assistance, trade, sanctions, international cooperation and crisis management capabilities in a joined-up manner. This mix of tools and instruments is helping the EU to achieve the aim set out in its European Security Strategy: “a secure Europe in a better world”.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A deregulated electricity market is characterized with uncertainties, with both long and short terms. As one of the major long term planning issues, the transmission expansion planning (TEP) is aiming at implementing reliable and secure network support to the market participants. The TEP covers two major issues: technical assessment and financial evaluations. Traditionally, the net present value (NPV) method is the most accepted for financial evaluations, it is simple to conduct and easy to understand. Nevertheless, TEP in a deregulated market needs a more dynamic approach to incorporate a project's management flexibility, or the managerial ability to adapt in response to unpredictable market developments. The real options approach (ROA) is introduced here, which has clear advantage on counting the future course of actions that investors may take, with understandable results in monetary terms. In the case study, a Nordic test system has been testified and several scenarios are given for network expansion planning. Both the technical assessment and financial evaluation have been conducted in the case study.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

To evaluate an investment project in the competitive electricity market, there are several key factors that affects the project's value: the present value that the project could bring to investor, the possible future course of actions that investor has and the project's management flexibility. The traditional net present value (NPV) criteria has the ability to capture the present value of the project's future cash flow, but it fails to assess the value brought by market uncertainty and management flexibility. By contrast with NPV, the real options approach (ROA) method has the advantage to combining the uncertainty and flexibility in evaluation process. In this paper, a framework for using ROA to evaluate the generation investment opportunity has been proposed. By given a detailed case study, the proposed framework is compared with NPV and showing a different results

Relevância:

40.00% 40.00%

Publicador:

Resumo:

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis challenges the consensual scholarly expectation of low EU impact in Central Asia. In particular, it claims that by focusing predominantly on narrow, micro-level factors, the prevailing theoretical perspectives risk overlooking less obvious aspects of the EU?s power, including structural aspects, and thus tend to underestimate the EU?s leverage in the region. Therefore, the thesis argues that a more structurally integrative and holistic approach is needed to understand the EU?s power in the region. In responding to this need, the thesis introduces a conceptual tool, which it terms „transnational power over? (TNPO). Inspired by debates in IPE, in particular new realist and critical IPE perspectives, and combining these views with insights from neorealist, neo-institutionalist and constructivist approaches to EU external relations, the concept of TNPO is an analytically eclectic notion, which helps to assess the degree to which, in today?s globalised and interdependent world, the EU?s power over third countries derives from its control over a combination of material, institutional and ideational structures, making it difficult for the EU?s partners to resist the EU?s initiatives or to reject its offers. In order to trace and assess the mechanisms of EU impact across these three structures, the thesis constructs a toolbox, which centres on four analytical distinctions: (i) EU-driven versus domestically driven mechanisms, (ii) mechanisms based on rationalist logics of action versus mechanisms following constructivist logics of action, (iii) agent-based versus purely structural mechanisms of TNPO, and (iv) transnational and intergovernmental mechanisms of EU impact. Using qualitative research methodology, the thesis then applies the conceptual model to the case of EU-Central Asia. It finds that the EU?s power over Central Asia effectively derives from its control over a combination of material, institutional and ideational structures, including its position as a leader in trade and investment in the region, its (geo)strategic and security-related capabilities vis-à-vis Central Asia, as well as the relatively dense level of institutionalisation of its relations with the five countries and the positive image of the EU in Central Asia as a more neutral actor.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose: Energy security is a major concern for India and many rural areas remain un-electrified. Thus, innovations in sustainable technologies to provide energy services are required. Biomass and solar energy in particular are resources that are widely available and underutilised in India. This paper aims to provide an overview of a methodology that was developed for designing and assessing the feasibility of a hybrid solar-biomass power plant in Gujarat. Design/methodology/approach: The methodology described is a combination of engineering and business management studies used to evaluate and design solar thermal collectors for specific applications and locations. For the scenario of a hybrid plant, the methodology involved: the analytical hierarchy process, for solar thermal technology selection; a cost-exergy approach, for design optimisation; quality function deployment, for designing and evaluating a novel collector - termed the elevation linear Fresnel reflector (ELFR); and case study simulations, for analysing alternative hybrid plant configurations. Findings: The paper recommended that for a hybrid plant in Gujarat, a linear Fresnel reflector of 14,000 m2 aperture is integrated with a 3 tonne per hour biomass boiler, generating 815 MWh per annum of electricity for nearby villages and 12,450 tonnes of ice per annum for local fisheries and food industries. However, at the expense of a 0.3 ¢/kWh increase in levelised energy costs, the ELFR can increase savings of biomass (100 t/a) and land (9 ha/a). Research limitations/implications: The research reviewed in this paper is primarily theoretical and further work will need to be undertaken to specify plant details such as piping layout, pump sizing and structure, and assess plant performance during real operational conditions. Originality/value: The paper considers the methodology adopted proved to be a powerful tool for integrating technology selection, optimisation, design and evaluation and promotes interdisciplinary methods for improving sustainable engineering design and energy management. © Emerald Group Publishing Limited.