950 resultados para Lead-time reduction


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mestrado em Engenharia Mecânica. Gestão de Processos e Operações.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Química

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Objective: Summarize all relevant findings in published literature regarding the potential dose reduction related to image quality using Sinogram-Affirmed Iterative Reconstruction (SAFIRE) compared to Filtered Back Projection (FBP). Background: Computed Tomography (CT) is one of the most used radiographic modalities in clinical practice providing high spatial and contrast resolution. However it also delivers a relatively high radiation dose to the patient. Reconstructing raw-data using Iterative Reconstruction (IR) algorithms has the potential to iteratively reduce image noise while maintaining or improving image quality of low dose standard FBP reconstructions. Nevertheless, long reconstruction times made IR unpractical for clinical use until recently. Siemens Medical developed a new IR algorithm called SAFIRE, which uses up to 5 different strength levels, and poses an alternative to the conventional IR with a significant reconstruction time reduction. Methods: MEDLINE, ScienceDirect and CINAHL databases were used for gathering literature. Eleven articles were included in this review (from 2012 to July 2014). Discussion: This narrative review summarizes the results of eleven articles (using studies on both patients and phantoms) and describes SAFIRE strengths for noise reduction in low dose acquisitions while providing acceptable image quality. Conclusion: Even though the results differ slightly, the literature gathered for this review suggests that the dose in current CT protocols can be reduced at least 50% while maintaining or improving image quality. There is however a lack of literature concerning paediatric population (with increased radiation sensitivity). Further studies should also assess the impact of SAFIRE on diagnostic accuracy.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O presente trabalho foi elaborado no âmbito da Dissertação Final de Mestrado do curso de Engenharia Mecânica – Gestão Industrial do Instituto Superior de Engenharia do Porto. Este foi realizado numa empresa da indústria de pneus, a Continental Mabor S.A.. Nos dias atuais, a indústria esta cada vez mais competitiva, os custos e os prazos da entrega são cada vez mais reduzidos e a qualidade cada vez mais exigente, assim sendo, é imprescindível uma constante melhoria do sistema produtivo. Este fato fez com que o presente trabalho tivesse como principal objetivo determinar o estado atual e delinear um plano de melhoria para um equipamento (Extrusora de pisos nº6), recentemente instalado na fábrica mas oriundo de outra fábrica do grupo, recorrendo para tal ao Lean Manufacturing e a ferramentas que lhe estão associadas. Inicialmente realizou-se uma análise e diagnóstico ao processo de extrusão de pisos na Extrusora nº6, com o intuito de avaliar todas as suas ineficiências e ainda formular um plano de melhorias para a ineficiência de maior impacto no sistema produtivo. Esta análise foi realizada em diferentes turnos e diferentes equipas de trabalho de forma a se obter uma amostra mais representativa da realidade global. Após esta análise verificou-se que as principais ineficiências eram Setup, conformidade do material, dimensões e encravamentos, entre outros. Sendo que os Setup provocam um tempo de paragem de 101 minutos por turno, escolheu-se esta perturbação como o foco do plano de melhorias a realizar posteriormente. De forma a reduzir os tempos de mudança (Setup), o autor no presente trabalho utilizou ferramentas Lean Manufacturing, principalmente o SMED. Conjuntamente com o SMED ainda foram utilizadas outras ferramentas Lean Manufacturing tais como: 5S, Gestão Visual, Problem Solving e Normalização do Método de Trabalho. Após a implementação de todas estas ferramentas obteve-se uma redução de tempos de mudança de 43% com 1 operador e 71% com 2 operadores, ou seja, reduziu-se de 40,5 minutos gastos por turno para a mudança de fieira para 23,13 min e 11,79 min respetivamente, o que corresponde a um ganho monetário anual de 63.621€ ou 105.045€, respetivamente. Com este trabalho conclui-se que a utilização de ferramentas Lean Manufacturing contribuem para a redução dos desperdícios do processo produtivo. Por isso, espera-se que este estudo seja aplicado na Extrusora nº6 e nas restantes Extrusoras de pisos existentes na fábrica, e num futuro próximo que se realize estudos semelhantes em máquinas com diferentes funções.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Cada vez mais é necessário inovar e optimizar, sendo todos os processos susceptíveis a melhorias contínuas. A inovação e empenho no desenvolvimento destas novas soluções resultam do “know-how” já existente e da necessidade permanente de incrementar a produtividade com vista a uma maior competitividade, a flexibilidade e assegurar simultaneamente a qualidade dos produtos manufacturados. Com vista a incrementar a flexibilidade, torna-se necessário reduzir significativamente os tempos de “set-up” e o ”lead-time”, com vista a assegurar a entrega dos produtos de forma cada vez mais rápida. Este objectivo pode ser conseguido através de uma normalização dos elementos que constituem a linha de pultrusão. Implicitamente, observa-se um aumento de produtividade com esta medida. Neste trabalho pretende-se optimizar e flexibilizar todo o processo de pultrusão de perfis estruturais. Foram considerados todos os elementos do sistema, desde o armazém das fibras (“rack”) até à fieira de pultrusão. Foi dedicada particular atenção ao sistema de guiamento das fibras e mantas, à tina onde as fibras são impregnadas em resina, normalizadas as placas de posicionamento das fibras em direcção à entrada da fieira e revisto todo o processo de montagem e fixação da fieira, assim como o sistema de aquecimento da mesma. Com a implementação destes novos sistemas foi conseguida uma poupança significativa de tempo de “set-up” e foram claramente reduzidos os custos unitários de produção. A garantia de qualidade foi também incrementada.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Manufacturing processes need permanently to innovate and optimize because any can be susceptible to continuous improvement. Innovation and commitment to the development of these new solutions resulting from existing expertise and the continuing need to increase productivity, flexibility and ensuring the necessary quality of the manufactured products. To increase flexibility, it is necessary to significantly reduce set-up times and lead time in order to ensure the delivery of products ever faster. This objective can be achieved through a normalization of the pultrusion line elements. Implicitly, there is an increase of productivity by this way. This work is intended to optimize the pultrusion process of structural profiles. We consider all elements of the system from the storehouse of the fibers (rack) to the pultrusion die. Particular attention was devoted to (a) the guidance system of the fibers and webs, (b) the resin container where the fibers are impregnated, (c) standard plates positioning of the fibers towards the entrance to the spinneret and also (d) reviewed the whole process of assembling and fixing the die as well as its the heating system. With the implementation of these new systems was achieved a significant saving of time set-up and were clearly reduced the unit costs of production. Quality assurance was also increased.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O presente trabalho visa a redução do tempo de mudança de produção e consequente aumento de produtividade de uma linha de envernizamento/pintura integrada na empresa Amorim Revestimentos SA, unidade S. Paio de Oleiros, que se dedica à produção de pisos flutuantes. Esta necessidade surgiu pelo facto desta linha de produção ser um ponto de estrangulamento do processo produtivo no departamento em que está inserida, devido principalmente à diminuição do tamanho de lotes e aumento da variedade de artigos a produzir. O trabalho envolveu as várias etapas da ferramenta SMED às quais está inerente a aplicação da técnica 5S às máquinas e ferramentas garantindo, assim, o posto de trabalho arrumado, limpo, seguro e com tudo pronto a ser utilizado. Aplicou-se a ferramenta SMED a dois tipos de mudança de acabamento e à mudança de rolo de pintura. Após a implementação desta ferramenta verificou-se uma redução de tempos de 37% (48 para 30 minutos) na mudança de pintura e acabamento de verniz, reduziu-se 25% (32 para 24 minutos) na mudança só de pintura e 13% (46 para 40 minutos) na mudança de rolo de pintura. Estes resultados foram alcançados através da redução do tempo das tarefas externas e internas e transformação das tarefas internas em externas consequentes da aplicação de um conjunto de ações de melhorias. Também foi fundamental a alteração do método de trabalho e a organização geral do posto de trabalho, no que diz respeito à repartição equilibrada das tarefas pelos dois operadores, alteração do sequenciamento das tarefas e aplicação da técnica 5S. As soluções encontradas estão sendo monitorizadas através do registo efectuado pelos operadores e realização de auditorias internas para garantir a perpetuação dos resultados.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Cell Sheets of hASCs (hASCs-CS) have been previously proposed for wound healing applications(1, 2) and despite the concern for production time reduction, the possibility of having these hASCs-CS off-the-shelf is appealing. The goal of this work was to define a cryopreservation methodology allowing to preserve cells viability and the properties CS matrix. hASCs-CS obtained from three different donors were created in UP-cell thermoresponsive dishes(Nunc, Germany) as previously reported(1,2). Different cryopreservation conditions were considered: i)FBS plus DMSO(5% and10%); ii)0.4M of Trehalose plus DMSO (5% and 10%); iii)cryosolution PLL (Akron Biotech, USA); and iv)vitrification. The cryopreservation effect was first assessed for cellular viability by flow cytometry using 7-AAD, and after dissociating the hASCs-CS with collagenase and trypsin-EDTA 0.25%. The expression (RT-PCR) and deposition (western blot and immunocytochemistry) of collagen type I, laminin and fibronectin, and the organization (TEM) of the extracellular matrix was further assessed before and after hASCs-CS cryopreservation to determine a potential effect of the method over matrix composition and integrity. The obtained results confirmed that cell viability is affected by the cryopreservation methodology, as shown before for different CS(3). Interestingly, the matrix properties were not significantly altered and the typical cell sheetâ s easiness of manipulation for transplantation was not lost.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação de mestrado em Engenharia e Gestão da Qualidade

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia Mecânica

Relevância:

80.00% 80.00%

Publicador:

Resumo:

OBJECTIVE: A double-blind, placebo-controlled multicenter study involving 34 centers from different Brazilian regions was performed to evaluate the antihypertensive efficacy and tolerability of trandolapril, an angiotensin I converting enzyme inhibitor, in the treatment of mild-to-moderate systemic arterial hypertension. METHODS: Of 262 patients enrolled in this study, 127 were treated with trandolapril 2 mg/day for 8 consecutive weeks, and the remaining 135 patients received placebo for the same period of time. Reduction in blood pressure (BP) and the occurrence of adverse events during this period were evaluated in both groups. RESULTS: Significant reductions in both systolic and diastolic pressures were observed in patients treated with trandolapril when compared with those on placebo. Antihypertensive efficacy was achieved in 57.5% of the patients on trandolapril and in 42% of these normal values of BP were obtained. The efficacy of trandolapril was similar in all centers, regardless of the area of the country. In a subset of 30 patients who underwent ABPM, responders showed a significant hypotensive effect to trandolapril throughout the 24 hour day. The adverse event profile was similar in both trandolapril and placebo groups. CONCLUSION: Our results demonstrate, for the first time in a large group of hypertensive patients from different regions in Brazil, good efficacy and tolerability of trandolapril during treatment of mild-to-moderate essential systemic hypertension.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We give the first systematic study of strong isomorphism reductions, a notion of reduction more appropriate than polynomial time reduction when, for example, comparing the computational complexity of the isomorphim problem for different classes of structures. We show that the partial ordering of its degrees is quite rich. We analyze its relationship to a further type of reduction between classes of structures based on purely comparing for every n the number of nonisomorphic structures of cardinality at most n in both classes. Furthermore, in a more general setting we address the question of the existence of a maximal element in the partial ordering of the degrees.