974 resultados para Construction Project Delivery


Relevância:

100.00% 100.00%

Publicador:

Resumo:

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite its huge potential in risk analysis, the Dempster–Shafer Theory of Evidence (DST) has not received enough attention in construction management. This paper presents a DST-based approach for structuring personal experience and professional judgment when assessing construction project risk. DST was innovatively used to tackle the problem of lacking sufficient information through enabling analysts to provide incomplete assessments. Risk cost is used as a common scale for measuring risk impact on the various project objectives, and the Evidential Reasoning algorithm is suggested as a novel alternative for aggregating individual assessments. A spreadsheet-based decision support system (DSS) was devised to facilitate the proposed approach. Four case studies were conducted to examine the approach's viability. Senior managers in four British construction companies tried the DSS and gave very promising feedback. The paper concludes that the proposed methodology may contribute to bridging the gap between theory and practice of construction risk assessment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Part 13: Virtual Reality and Simulation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Previous studies have proved the application of Building InformationModelling (BIM) can lead to greater efficiencies. Slowly adopting newtechnologies and limited technological innovation are criticised for theconstruction industry. In this paper, we present research that examinesthe practices of BIM technologies for the clash detection and coordination among building structure, equipment and pipelines, quantity statistics and construction simulation in a construction project in China. The BIM application significantly promotes the abilities to achieve construction schedule, quality, budget, and scope objectives in the project. The technological capabilities of BIM, the illegal issues of BIM outputs and developing cooperative project management culture are needed in order to promote BIM application in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction project teams are increasingly operating in dispersed arrangements in which communications predominantly take place via information communication technology (ICT) with a dose of face-to-face interactions. However, a review of literature reflects a scarcity of research on how shifting to dispersed teams affects the perceived quality of communications in construction project teams. The present study attempts to address such a gap in the body of knowledge. To this end, 12 major indicators of quality of communications were identified through a review of literature. This was followed by conducting 17 semi-structured interviews with experts in the industry to customize the indicators for the construction context. Based on the identified indicators, a questionnaire survey was designed for elucidating the perceptions of construction practitioners about changes in quality of communications in dispersed teams in comparison to fully collocated ones. Drawing upon the data collated from 285 duly completed questionnaires, confirmatory factor analysis (CFA) was deployed to define the major areas of change in quality of communications in dispersed teams as perceived by the respondents. The findings showed that shifting towards dispersed working results in a change in perceived quality of communications in ten areas mainly reduction in completeness and reliability of communications. The present study contributes to the field by providing a list of indicators for assessing the quality of communications for construction project teams. Additionally, the findings provide an illuminating insight into the primary changes in perceived quality of communications in disperse team arrangements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conflict is intrinsic to individuals, teams and organisations. Due to the unique and complex nature with various parties, conflict is inevitable in most construction projects. According to the general management literature, three distinct types of intragroup conflicts can be identified: task, process and relationship conflicts. However, very little consideration has been given in the literature addressing the three types individually in a construction project team setting. Therefore, this study has explored the existence of types of intragroup conflicts and their management in this context. This research was approached through case studies of six construction projects, which were operating under the traditional procurement method in Sri Lanka. Semi-structured interviews were conducted with three distinct participants from each team. The findings revealed that both process and relationship conflicts offer disruptive effects to construction projects and teams, while task conflicts offer positive effects when they exist at low levels. Based on the most critical sources identified within the cases, suggestions are offered here to construction project team managers on how to manage intergroup conflicts proactively. Since the research is based on six case studies on traditional procurement arrangement in Sri Lanka, further research is required to generalise the findings across different contexts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose-Deploying hybrid construction project teams (HCPTs) in which the common pattern of interactions is a blend of face-to-face and virtual communications has been increasingly gaining momentum in the construction context. Evidence has demonstrated that effectiveness of HCPTs is affected by a perceived level of virtuality, i.e. the perception of distance and boundaries between members where teams shift towards working virtually as opposed to purely collocated teams. This study aims to provide an integrated model of the factors affecting perceived virtuality in HCPTs, to address the conspicuous absence of studies on virtuality in the construction context. Design/methodology/approach-An a priori list of factors extracted from existing literature on virtuality was subjected to the scrutiny of 17 experts with experiences of working in HCPTs through semi-structured interviews. Nvivo 10 was deployed for analysing the interview transcripts. Findings-The fndings outline the factors affecting virtuality in HCPTs and map the patterns of their associations as an integrated model. This leads to discovering a number of novel factors, which exert moderating impacts upon perceived virtuality in HCPTs. Practical implications-The fndings assist managers and practitioners dealing with any form of HCPTs (including building information modelling-based networks and distributed design teams) in identifying the variables manipulating the effectiveness of their teams. This enables them of designing more effective team arrangements. Originality/value-As the frst empirical study on virtuality in the construction context, this paper contributes to the sphere by conceptualising and contextualising the concept of virtuality in the construction industry. The study presents a new typology for the factors affecting perceived virtuality by categorising them into predictors and moderators.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

History has shown that projects move in and out of poor status through the life of the project. Predicting the success or failure of a project to complete on time because of its recent history on the contract status report could provide our project managers another tool for monitoring contract progress. In many instances, poor contract progress results in the loss of contract time and late completion of projects. This research evaluates the combinations of work type, point in time physical work begins, recent poor status, and contract bid amount as indicators of late project completion.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public road authorities have a key responsibility in driving initiatives for reducing greenhouse gas (GHG) emissions in the road construction project lifecycle. A coherent and efficient chain of procurement processes and methods is needed to convert green policies into tangible actions that capture the potential for GHG reduction. Yet, many infrastructure clients lack developed methodologies regarding green procurement practices. Designing more efficient solutions for green procurement requires an evaluation of the current initiatives and stages of development. A mapping of the current GHG reduction initiatives in Australian public road procurement is presented in this paper. The study includes the five largest Australian state road authorities, which cover 94% of the total 817,089 km of Australian main roads (not local) and account for 96% of the total A$13 billion annual major road construction and maintenance expenditure. The state road authorities’ green procurement processes and tools are evaluated based on interviews and a review of documents. Altogether 12 people, comprising 1-3 people of each organisation, participated in the interviews and provided documents. An evaluation matrix was developed for mapping the findings across the lifecycle of road construction project delivery. The results show how Australian state road authorities drive decisions with an impact on GHG emissions on the strategic planning phase, project development phase, and project implementation phase. The road authorities demonstrate varying levels of advancement in their green procurement methodologies. Six major gaps in the current green procurement processes are identified and, respectively, six recommendations for future research and development are suggested. The greatest gaps remain in the project development phase, which has a critical role in fixing the project (GHG reduction) goals, identifying risks and opportunities, and selecting the contractor to deliver the project. Specifically, the role of mass-haul optimisation as a part of GHG minimisation was reviewed, and mass-haul management was found to be an underutilised element with GHG reduction potential.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.