889 resultados para Lease Contract
Resumo:
The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.
Locally oriented crime prevention and the “partnership approach” : politics, practices and prospects
Resumo:
Why have multi-agency or "partnership" approaches to crime prevention and community safety been reported internationally with unfavorable results? Can groups and individuals from disparate government and non-government sectors work together to reduce or prevent crime? This article will address these and other questions by using developments in Belgium as its case study. In 1992, Belgium launched its "safety and crime prevention contracts", a series of locally based crime prevention initiatives which have attempted to contract federal, regional and local governments to a range of social and police oriented crime prevention endeavors. Traces the development of the Belgian crime prevention contracts and examines the difficulties experienced with "multi-agency crime prevention" and suggests that much of the political rhetoric in Belgium calling for local, community and intersectorial "partnerships" has, like several other countries including England and Wales, Canada, Australia and New Zealand, lacked clear practical expression. However, some promising initiatives indicate that this prevention approach may be capable of producing effective crime prevention and community safety outcomes. Further research is needed to describe these initiatives and analyze the conditions under which they are developed.
Resumo:
This article presents a critical analysis of the current and proposed CCS legal frameworks across a number of jurisdictions in Australia in order to examine the legal treatment of the risks of carbon leakage from CCS operations. It does so through an analysis of the statutory obligations and liability rules established under the offshore Commonwealth and Victorian regimes, and onshore Queensland and Victorian legislative frameworks. Exposure draft legislation for CCS laws in Western Australia is also examined. In considering where the losses will fall in the event of leakage, the potential tortious and statutory liabilities of private operators and the State are addressed alongside the operation of statutory protections from liability. The current legal treatment of CCS under the new Australian Carbon Pricing Mechanism is also critiqued.
Resumo:
The Australian Federal Commissioner of Taxation recently released Draft Taxation Ruling TR 2008/D3 with the stated purpose of clarifying ‘what profits derived from the leasing of ships or aircraft fall within the ship and aircraft articles of each of Australia’s tax treaties’. In particular, TR 2008/D3 explains the taxing rights over different types of leasing profits, such as a full basis lease in respect of any transport by a ship operated in international traffic and bareboat leases which are ancillary to the lessor transport operations of ships in international traffic. This article outlines the Commissioner’s views on the application of the standard ships and aircraft articles in the tax treaties to which it is a party as well as considering the major variations on the standard adoption. In doing so, guidance is provided as to the allocation of taxing rights of ship and aircraft leasing profits under Australia’s tax treaties.
Resumo:
Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.
Resumo:
The decision of Dalton J in Lai v Soineva [2011] QSC 247 has resulted in a change in the latest versions of the Real Estate Institute of Queensland (REIQ) contracts.
Resumo:
The principles relating to the passing of risk under a contract for the sale of real property would seem to have been long settled. The rule under the general law is that the risk of loss of the subject matter under a contract for the sale of real property passes to the buyer upon the creation of a valid and binding contract. This article considers the origin of that rule, how it developed with the growth of equity, and advances the view that it is anomalous in a modern context of property dealings. In doing so, the article adverts to the variety of statutory mechanisms used to subvert the rule, few of which are of practical value. It concludes that the rule is outmoded in many respects and suggests a number of reforms which might be implemented nationally to bring consistency and simplicity to the issue of damage or destruction of improvements which are the subject of a land contract.
Resumo:
The prohibition on unfair contract terms in standard form consumer contracts has the potential to significantly impact on the terms of contracts for the sale of land. The definition of ‘consumer contract’ includes contracts for the sale or grant of an interest in land to an individual wholly or predominantly for personal or domestic use. Therefore, a contract for the purchase of a residence for personal occupation by the buyer, as opposed to a purchase for investment purposes, will be a consumer contract potentially attracting the application of the unfair terms provisions. Significant consumer protection mechanisms already exist in most state jurisdictions requiring disclosure of relevant matters to the buyer and providing remedies for the provision of misleading conduct. Minimal evidence of unfair terms in land contract was presented to the Productivity Commission Inquiry into the Australian Consumer Policy Framework raising the question as to whether there is an identified problem of unfair terms in real estate contracts and if so, whether the same economic and ethical rationales justify regulatory intervention. This article examines what effect if any the introduction of the unfair contract provisions will have on the enforcement of residential land contracts and the viability of previously accepted conditions if challenged as being “unfair terms”. The article concludes that despite the existence of several potentially unfair terms in some land contracts, the intervention of the rules of equity to overcome perceived hardship or unfairness to buyers from strict enforcement of terms means the unfair terms provisions are only likely to operate on terms untouched by those principles. In the authors’ view the scope for operation of the unfair terms provisions will be limited to terms untouched by the principles of equity and consumer protection legislation making it unlikely that there will be any significant realignment of the contractual obligations and rights of buyers and sellers of land.
Resumo:
Only a few years ago there were only a handful of buildings in Australia, mainly leased by or from the Commonwealth Government to which a green lease might have application. Now with the passing of the Building Energy Efficiency Disclosure Act 2010 (Cth) all commercial office premises in excess of 2000 square metres have 12 months from 1 November 2010 to obtain a Building Energy Efficiency Certificate as part of Stage 1 of the Federal Government’s National Framework for Energy Efficiency This significant change has focused attention on changes required to the conditions of leases where the building has a NABERS rating. This article considers material from the United Kingdom, the United States and Canada where there are similar policy changes in play and makes suggestions as to how certain clauses of a standard lease of a commercial office block may be altered to meet this new regime.
Resumo:
Cross-nationally, the introduction of New Public Management coincides with a significant growth phase of the nonprofit or third sector. This growth has disproportionately been an expansion of the economic dimensions (employment, turnover) and basically involved the greater use of third sector organisations as service providers. Such provision uses complex contract regimes, and typically takes place in some form of public-private partnership with either public or private funding agencies. Other parts of the third sector such as membership, volunteering and giving have generally grown less. The paper suggests that the sector is becoming qualitatively different, although the nature and strength of this change depends on the nonprofit regime type in a given country. Generally, however, third sector growth has led to differentiation processes that involve new organisational forms, and changes in activities and overall composition. The paper explores the measurement aspects of the quantitative-qualitative jump in third sector development by trying to "map" changes in core facts or dimensions over time. In closing, the paper suggests to examine recombination and refunctionality processes in the third sector.
Resumo:
In this paper we use a sequence-based visual localization algorithm to reveal surprising answers to the question, how much visual information is actually needed to conduct effective navigation? The algorithm actively searches for the best local image matches within a sliding window of short route segments or 'sub-routes', and matches sub-routes by searching for coherent sequences of local image matches. In contract to many existing techniques, the technique requires no pre-training or camera parameter calibration. We compare the algorithm's performance to the state-of-the-art FAB-MAP 2.0 algorithm on a 70 km benchmark dataset. Performance matches or exceeds the state of the art feature-based localization technique using images as small as 4 pixels, fields of view reduced by a factor of 250, and pixel bit depths reduced to 2 bits. We present further results demonstrating the system localizing in an office environment with near 100% precision using two 7 bit Lego light sensors, as well as using 16 and 32 pixel images from a motorbike race and a mountain rally car stage. By demonstrating how little image information is required to achieve localization along a route, we hope to stimulate future 'low fidelity' approaches to visual navigation that complement probabilistic feature-based techniques.
Resumo:
Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.
Resumo:
Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.