835 resultados para Project portfolio management (ppm)
Resumo:
This project concept and assessment of impacts includes information on future four-lane construction of U.S. 151 from the existing four-lane section near Cedar Rapids to Dubuque.
Resumo:
Access management involves balancing the dual roles that roadways must play - through travel and access to property and economic activity. When these roles are not in proper balance, the result is a roadway system that functions sub-optimally. Arterial routes that have a too high driveway density and provide overly extensive access to property have high crash rates and begin to suffer in terms of traffic operations. Such routes become congested, delays increase, and mean travel speeds decline. The Iowa access management research and awareness project has had four distinct phases. Phase I involved a detailed review of the extensive national access management literature so lessons learned elsewhere could be applied in Iowa. In Phase II original case study research was conducted in Iowa. Phase III of the project concentrated on outreach and education about access management. Phase IV of the Iowa access management project extended the work conducted during Phases II and III. The main work products for Phase IV were as follows: 1) three additional before and after case studies, illustrating the impacts of various access management treatments on traffic safety, traffic operations, and business vitality; 2) an access management handbook aimed primarily at local governments in Iowa; 3) a modular access management toolkit with brief descriptions of various access management treatments and considerations; and 4) an extensive outreach plan aimed at getting the results of Phases I through IV of the project out to diverse audiences in Iowa and elsewhere.
Resumo:
The Iowa Department of Transportation, like many other state transportation agencies, is experiencing growing congestion and traffic delays in work zones on rural interstate highways. The congestion results in unproductive and wasteful delays for both motorists and commercial vehicles. It also results in hazardous conditions where vehicle stopped in queues on rural interstate highways are being approached by vehicles upstream at very high speeds. The delays also result in driver frustration, making some drivers willing to take unsafe risks in an effort to bypass delays. To reduce the safety hazards and unproductive delays of congested rural interstate work zones, the Iowa Department of Transportation would like to improve its traffic management strategies at these locations. Applying better management practices requires knowledge of the traffic flow properties and driver behavior in and around work zones, and knowledge of possible management strategies. The project reported here and in a companion report documents research which seeks to better understand traffic flow behavior at rural interstate highway work zones and to estimate the traffic carrying capacity of work zone lane closures. In addition, this document also reports on technology available to better manage traffic in and around work zones.
Resumo:
Creating and using FLOSS in R+D projects raises several legal issues, which need to be managed as soon as possible - preferably during the project planning stage. Challenges in the areas of project structure and policy, licenses and licensing, exploitation strategies, community management, and FLOSS-friendliness in general all have their legal aspects, which are commented here. Some recommendations are made for assisting in the use of FLOSS in R+D projects, especially in multiple party consortiums.
Resumo:
Diplomityössä on tutkittu reaaliaikaisen toimintolaskennan toteuttamista suomalaisen lasersiruja valmistavan PK-yrityksen tietojärjestelmään. Lisäksi on tarkasteltu toimintolaskennan vaikutuksia operatiiviseen toimintaan sekä toimintojen johtamiseen. Työn kirjallisuusosassa on käsitelty kirjallisuuslähteiden perusteella toimintolaskennan teorioita, laskentamenetelmiä sekä teknisessä toteutuksessa käytettyjä teknologioita. Työn toteutusosassa suunniteltiin ja toteutettiin WWW-pohjainen toimintolaskentajärjestelmä case-yrityksen kustannuslaskennan sekä taloushallinnon avuksi. Työkalu integroitiin osaksi yrityksen toiminnanohjaus- sekä valmistuksenohjausjärjestelmää. Perinteisiin toimintolaskentamallien tiedonkeruujärjestelmiin verrattuna case-yrityksessä syötteet toimintolaskentajärjestelmälle tulevat reaaliaikaisesti osana suurempaa tietojärjestelmäintegraatiota.Diplomityö pyrkii luomaan suhteen toimintolaskennan vaatimusten ja tietokantajärjestelmien välille. Toimintolaskentajärjestelmää yritys voi hyödyntää esimerkiksi tuotteiden hinnoittelussa ja kustannuslaskennassa näkemällä tuotteisiin liittyviä kustannuksia eri näkökulmista. Päätelmiä voidaan tehdä tarkkaan kustannusinformaatioon perustuen sekä määrittää järjestelmän tuottaman datan perusteella, onko tietyn projektin, asiakkuuden tai tuotteen kehittäminen taloudellisesti kannattavaa.
Resumo:
Työn päätavoitteena oli tuoda esiin tärkeimmät julkistamisprosessin tehokkuuteen vaikuttavat tekijät. Tutkimuksessa tarkasteltiin aihetta julkistamisprojektien vetäjän näkökulmasta. Kirjallinen selvitys kattaa keskeisimmät ohjelmistoprosessin, palvelun laadun sekä projektihallinnan teoriat. Kokeellisena aineistona käytettiin asiakkailta ja myynnin sekä käyttöönoton organisaatioilta tullutta palautetta ja asiantuntijahaastatteluita. Case-tuotteena tarkasteltiin suuren kansainvälisen yrityksen jälleenmyymää leikkaussalihallinnan ohjelmistoa. Tärkeimpiä julkistamisprosessin tehokkuuteen vaikuttavia tekijöitä ovat tiekartan ja julkistamispakettien sisällön hallinta, projektin aikataulujen pitäminen, rehellinen ja nopea kommunikaatio myyntikanavaan ja asiakkaille, sekä hyvin toteutettu testaus. Työssä käydään läpi esimerkkistrategioita kehittymiseen näillä alueilla.
Resumo:
Elektroniikan alihankintapalveluiden (EMS) liiketoimintaympäristössä yritykset toimivat pääasiassa asiakkaiden projektien ja ulkoistamispäätösten keskellä. Tämän tyyppisessä liiketoimintaympäristössä on asiakas keskeisessä roolissa, kuten liiketoiminnassa yleensäkin. Termi EMS sisältää koko tuotteen elinkaaren aina suunnittelusta myynnin jälkeisiin palveluihin. Asiakkaan olessa erittäin tärkeä yritykselle, on myös selvitettävä mitkä asiakkaat ovat yrityksen kannalta arvokkaimmat. Tämän tutkimuksen tavoitteena oli selvittää myyntijohdon tietotarpeet sekä löytää selkeä ja helppokäyttöinen tapa tuoda tarvittava informaatio heidän käyttöönsä. Tietotarpeet selvitettiin haastatteluilla ja kyselytutkimuksella ja sopivan järjestelmän löytämisessä käytettiin prototyyppi-lähestymistä, jotta saataisiin selville täyttääkö valittu järjestelmä myyntijohdon tarpeet. Nk. dashboard-mittaristot ovat hyvä tapa tuoda asiakasinformaatiota päätöksenteontueksi. Tälläisillä mittaristoilla voidaan myös yhdistellä eri lähteistä olevaa tietoa ja tuoda se ymmärrettävässä muodossa esiin. Tässä tutkimuksessa kuvataan mittariston suunnittelu myyntijohdon tarpeisiin. Ensimmäisenä tutkitaan kyselyn avulla myyntijohtajien tiedon tarpeet ja tämän jälkeen etsitään sopiva tekninen sovellus ja ratkaistaan tiedon siirtoihin liittyvät ongelmat. Kun ensimmäinen versio on valmis, esitellään se myyntijohdolle, jotta saadaan kerättyä kommentit seuraavaan versioon.
Resumo:
Tämän diplomityön tavoitteena on kuvata tiedonkulkua projektiliiketoimintaa harjoittavassa yrityksessä sekä analysoida kuvausta määrittäen mahdolliset kehityskohdat. Työssätuotetut kuvaukset ja kehityskohtien määrittäminen toimivat pohjana yrityksen kehittäessä projektien hallintaansa tulevaisuudessa. Työssä valitaan tietojohtamisen näkökulma sopivaksi lähestymistavaksi yrityksen toiminnananalysointiin. Haastatteluin kerätyn tutkimusmateriaalin perusteella luodaan prosessikuvaukset jotka mallintavat tietovirtoja yrityksen projektien aikana tapahtuvien prosessien välillä. Kuvausta peilataan tietämyksen luomisen sekä projektien tietojohtamisen teoriaan ja määritetään kehityskohteita. Kehityskohteiden määrittämisen lisäksi ehdotetaan mahdollisia toimenpiteitä tiedon ja tietämyksen hallinnan kehittämiseksi. Kokemusten ja opittujen asioiden sekäpalautteen kerääminen projektien aikana sekä niiden jälkeen havaittiin tärkeimmäksi kehityskohdaksi. Näiden keräämisen voidaan todeta vaativan järjestelmällisyyttä jotta projektien onnistumiset sekä niissä saavutetut parannukset voidaan toistaa jatkossa ja virheet sekä epäonnistumiset sitä vastoin välttää.
Resumo:
Printed electronics is an emerging concept in electronics manufacturing and it is in very early development stage. The technology is not stable, design kits are not developed, and flows and Computer Aided Design (CAD) tools are not fixed yet. The European project TDK4PE addresses all this issues and this PFC has been realized on this context. The goal is to develop an XML-based information system for the collection and management of information from the technology and cell libraries developed in TDK4PE. This system will ease the treatment of that information for a later generation of specific Design Kits (DK) and the corresponding documentation. This work proposes a web application to generate technology files and design kits in a formatted way; it also proposes a structure for them and a database implementation for storing the needed information. The application will allow its users to redefine the structure of those files, as well as export and import XML files, between other formats.
Resumo:
Työ tutkii yritysportaalin roolia organisaation tietojohtamisessa. Tutkimusongelman ratkaisemiseksi luodaan viitekehys, jossa yritysportaalin ja tietojohtamisen teoriat linkittyvät. Työn empiirisessä osassa viitekehys on pohjana case-yritykselle rakennettavalle yritysportaalille. Laadullinen tutkimus käsittää teoriaosuuden sekä osallistuvaan case-tutkimukseen perustuvan empiriaosuuden. Työn runko muodostuu kahden vastakkaisen tietojohtamisajattelun vuoropuhelusta, jotka ovat informaatioteknologiaan- ja strategiseen johtamiseen perustuvat näkökulmat. Toimivan tietojohtamismallin täytyy sisältää molemmat aspektit. Jokainen organisaatio tarvitsee informaation hallintaan liittyviä toiminnallisuuksia ja täten eksplisiittisen tiedon hallinta tietojärjestelmien avulla on onnistuneen tietojohtamisen kulmakiviä. Tätä perusinfrastruktuuria on mahdollista laajentaa hiljaisen tiedon hallintaan perustuvilla tietojohtamismenetelmillä. Työn ratkaisu näiden kahden näkemyksen, 'kovan' informaatioteknogiaan painottuvan sekä 'pehmeän' ihmisnäkökulman integrointiin, on yritysportaali. Työssä käytettävä yritysportaalin viitekehys rakentuu kolmeen päätoiminnallisuuteen; sisällönhallintaan, yhteistyöominaisuuksiin ja liiketoimintatiedon hallintaan. Työ todistaa yhteyden viitekehyksen sekä tietojohtamisen perusmallien, kuten tietojohtamisen prosessimallin sekä tietoympäristöjen välillä. Yritysportaali voi täten toimia, ei ainoastaan yksittäisten tietojohtamistyökalujen implementoinnissa, vaan tietojohtamisstrategian luomisen apuna tarjoten alustan tai 'katalyytin' kokonaisvaltaiselle tietojohtamiselle.
Resumo:
Lobbying by companies and the management techniques of lobbying have been fairly unknown territory. This study explains different theories related to lobbying including major political, economic and mathematical theories and their connections to lobbying. Existing lobbying networks in the European Union, especially at the European Union level, are explained. Lobbying organisations in the European Union are interconnected. Networks start at a local level, and have connections to national, European Union, international and sometimes to the global level. Relationships between business strategy and lobbying are studied with emphasis on issues management. Business strategy is often seen stemming from business environment analysis and stakeholder management. The issues management concept bridges aspects of business environment analysis and stakeholder management into a project type of management approach. The study includes two different empirical parts. A sample of public policy managers representing the European chemical industry was interviewed, and a chemical industry specific lobbying framework was built. This framework was then tested using a questionnaire sent to European public issues managers representing some of the largest European companies. Based on the results of the questionnaire, a generic framework on how large, European companies manage lobbying in general terms was developed.
Resumo:
Tutkimus keskittyy hankintatoimen kehittämiseen osana laitosprojektien toteutusta. Työ pohjautuu empiiriseltä taustaltaan Pöyry Oyj:n projektiliiketoimintaan ja työn tarkastelunäkökulmaksi onvalittu projektihallinnosta vastaavan yrityksen näkökulma. Tutkimus on hyvin käytännönläheinen ¿ se lähtee hankinnan ja sen seurannan ongelmista ja pyrkii tarjoamaan niihin uudenlaisia ratkaisuja. Pohjimmiltaan tutkimus kuuluu teollisuustalouden piiriin, vaikka tietojärjestelmätieteellä on vahva tukirooli. Työn tavoitteet ja tulokset liittyvät teollisuustaloudelle ominaisesti yrityksen toiminnan kehittämiseen, käytetyt välineet ja ratkaisut puolestaan hyödyntävät tietojärjestelmätieteen antamia mahdollisuuksia. Tutkimuksessa on käytetty konstruktiivista tutkimusotetta, jonka mukaisesti on luotu innovatiivisia konstruktioita ratkaisemaan aitoja reaalimaailman ongelmia ja tätä kautta tuotettu kontribuutioita teollisuustaloudelle. Tavoitteena oli järjestää hankintatoimi ja sen seuranta suurissa laitosprojekteissa tehokkaammin. Tätä varten uudistettiin ensin projektihallinnon ja hankintatoimen toimintaohjeet vastaamaan paremmin nykyajan vaatimuksia. Toimintaohjeiden perusteella ryhdyttiin toteuttamaan hankintaohjelmistoa, joka pystyisi kattamaan kaikki toimintaohjeissa kuvatut piirteet. Lopulta hankintaohjelmisto toi mukanaan uusia piirteitä projektihallintoon ja hankintatoimeen ja nämä sisällytettiin toimintaohjeisiin. Tähän kehitystyöhön ryhdyttiin, jotta laitosprojektien projektihallinto ja hankintatoimi toimisivat paremmin, eli pienemmin kustannuksin tuottaen projekteissa tarvittavat tulokset nopeammin, tarkemmin ja laadukkaammin. Tutkimuksella on kolmenlaisia tuloksia: hankintatoimen parannetut metodit, hankintaohjelmiston pohjana olevat toiminta- ja laskentamallit sekä implementaationa hankintasovellus. Uudistetut projekti- ja hankintaohjeet kuvaavat hankintatoiminnan parannettuja metodeja. Hankintaohjelmistoasuunnitellessa ja kehitettäessä tehdyt kuvaukset sisältävät uusia malleja niin hankintaprosessille kuin hankinnan seuraamiseksi suurissa laitosprojekteissa. Itse ohjelmisto on tuloksena implementaatio, joka perustuu parannettuihin hankintametodeihin ja uusiin toiminta- ja laskentamalleihin. Uudistetut projekti- ja hankintaohjeet ovat olleet käytössä Pöyry Oyj:ssä vuodesta 1991. Vuosien varrella nämä toimintaohjeet ovat auttaneet ja tukeneet satojen laitosprojektientoteutusta ja ylläpitäneet Pöyry Oyj:n kilpailukykyä kansainvälisenä projektitalona. Hankintasovellus puolestaan on ollut käytössä useissa projekteissa ja sen on havaittu pienentävän hankintatoimen suoria työkustannuksia laitosprojekteissa. Sovelluksen katsotaan myös tuovan epäsuoria kustannussäästöjä parempien hankintapäätösten muodossa, mutta näiden säästöjen suuruutta ei pystytä luotettavasti arvioimaan.
Resumo:
The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.
Resumo:
The aim of this study is to provide an instrument for measuring service quality in sports enterprises from the point of view of the customers. For this purpose we intend to elaborate an enquiry starting out from a more general scale called SERVIQUAL. We have limited our research project to sports enterprises where the customer participates actively, i.e., we have excluded sports clubs and other organizations which offer sport as entertainment. Our choice is mainly due to the fact that few studies have been carried out in this area and that sports has been earning an increasing amount of adepts during the last decades in Spain. The DELPHI method has been applied with the collaboration of a panel of experts in order to evaluate the viability and adequacy of the modified SERVQUAL scale.
Resumo:
Quality management has become a strategic issue for organisations and is very valuable to produce quality software. However, quality management systems (QMS) are not easy to implement and maintain. The authors' experience shows the benefits of developing a QMS by first formalising it using semantic web ontologies and then putting them into practice through a semantic wiki. The QMS ontology that has been developed captures the core concepts of a traditional QMS and combines them with concepts coming from the MPIu'a development process model, which is geared towards obtaining usable and accessible software products. Then, the ontology semantics is directly put into play by a semantics-aware tool, the Semantic MediaWiki. The developed QMS tool is being used for 2 years by the GRIHO research group, where it has manages almost 50 software development projects taking into account the quality management issues. It has also been externally audited by a quality certification organisation. Its users are very satisfied with their daily work with the tool, which manages all the documents created during project development and also allows them to collaborate, thanks to the wiki features.