921 resultados para test process improvement
Resumo:
The aim of the thesis was to study quality management with process approach and to find out how to utilize process management to improve quality. The operating environment of organizations has changed. Organizations are focusing on their core competences and networking with suppliers and customers to ensure more effective and efficient value creation for the end customer. Quality management is moving from inspection of the output to prevention of problems from occurring in the first place and management thinking is changing from functional approach to process approach. In the theoretical part of the thesis, it is studied how to define quality, how to achieve good quality, how to improve quality, and how to make sure the improvement goes on as never ending cycle. A selection of quality tools is introduced. Process approach to quality management is described and compared to functional approach, which is the traditional way to manage operations and quality. The customer focus is also studied, and it is presented, that to ensure long term customer commitment, organization needs to react to changing customer requirements and wishes by constantly improving the processes. In the experimental part the theories are tested in a process improvement business case. It is shown how to execute a process improvement project starting from defining the customer requirements, continuing to defining the process ownership, roles and responsibilities, boundaries, interfaces and the actual process activities. The control points and measures are determined for the process, as well as the feedback and corrective action process, to ensure continual improvement can be achieved and to enable verification that customer requirements are fulfilled.
Resumo:
The aim of this Master’s Thesis is to find applicable methods from process management literature for improving reporting and internal control in a multinational corporation. The method of analysis is qualitative and the research is conducted as a case study. Empirical data collection is carried out through interviews and participating observation. The theoretical framework is built around reporting and guidance between parent company and subsidiary, searching for means to improve them from process thinking and applicable frameworks. In the thesis, the process of intercompany reporting in the case company is modelled, and its weak points, risks, and development targets are identified. The framework of critical success factors in process improvement is utilized in assessing the development targets. Also internal control is analyzed with the tools of process thinking. As a result of this thesis, suggestions for actions improving the reporting process and internal control are made to the case company, the most essential of which are ensuring top management’s awareness and commitment to improvement, creating guidelines and tools for internal control and creating and implementing improved intercompany reporting process.
Resumo:
This master’s thesis studies the case company’s current purchase invoice process and the challenges that are related to it. Like most of other master’s thesis this study consists of both theoretical- and empirical parts. The purpose of this work is to combine theoretical and empirical parts together so that the theoretical part brings value to the empirical case study. The case company’s main business is frequency converters for both low voltage AC & DC drives and medium voltage AC Drives which are used across all industries and applications. The main focus of this study is on the current invoice process modelling. When modelling the existing process with discipline and care, current challenges can be understood better. Empirical study relays heavily on interviews and existing, yet fragmented, data. This, along with own calculations and analysis, creates the foundation for the empirical part of this master’s thesis.
Resumo:
The aim of this work was to calibrate the material properties including strength and strain values for different material zones of ultra-high strength steel (UHSS) welded joints under monotonic static loading. The UHSS is heat sensitive and softens by heat due to welding, the affected zone is heat affected zone (HAZ). In this regard, cylindrical specimens were cut out from welded joints of Strenx® 960 MC and Strenx® Tube 960 MH, were examined by tensile test. The hardness values of specimens’ cross section were measured. Using correlations between hardness and strength, initial material properties were obtained. The same size specimen with different zones of material same as real specimen were created and defined in finite element method (FEM) software with commercial brand Abaqus 6.14-1. The loading and boundary conditions were defined considering tensile test values. Using initial material properties made of hardness-strength correlations (true stress-strain values) as Abaqus main input, FEM is utilized to simulate the tensile test process. By comparing FEM Abaqus results with measured results of tensile test, initial material properties will be revised and reused as software input to be fully calibrated in such a way that FEM results and tensile test results deviate minimum. Two type of different S960 were used including 960 MC plates, and structural hollow section 960 MH X-joint. The joint is welded by BöhlerTM X96 filler material. In welded joints, typically the following zones appear: Weld (WEL), Heat affected zone (HAZ) coarse grained (HCG) and fine grained (HFG), annealed zone, and base material (BaM). Results showed that: The HAZ zone is softened due to heat input while welding. For all the specimens, the softened zone’s strength is decreased and makes it a weakest zone where fracture happens while loading. Stress concentration of a notched specimen can represent the properties of notched zone. The load-displacement diagram from FEM modeling matches with the experiments by the calibrated material properties by compromising two correlations of hardness and strength.
Resumo:
The purpose of this research was to examine the most optimal way to arrange meetings and events management and source to pay –process in a global company. The research is a qualitative multi-method case study and is a commission from a global company. The theoretical framework of this research structures around two approaches. First approach focus on a purchasing strategy and management that shows the current role of procure-ment and introduce different ways to organize purchasing functions. Second approach focus on purchasing process management and improvement methods. Annual spend analyze, external and internal interviews and internal survey were done to gain compre-hensive knowledge about the current state of operations and possible solutions. Gathered data were then combined to theoretical framework in order to create optimal solution for the case company. Based on the research a source to pay –process and global policy for meeting and event category was created. The solution includes all relevant matters that are needed in order to secure efficient and profitable operations. The results show that optimal way to arrange meetings and events structures around standardized source to pay –processes, central-ized procurement, preferred supplier and clearly defined roles and responsibilities be-tween different stakeholders.
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
This paper identifies characteristics of knowledge intensive processes and a method to improve their performance based on analysis of investment banking front office processes. The inability to improve these processes using standard process improvement techniques confirmed that much of the process was not codified and depended on tacit knowledge and skills. This led to the use of a semi-structured analysis of the characteristics of the processes via a questionnaire to identify knowledge intensive processes characteristics that adds to existing theory. Further work identified innovative process analysis and change techniques that could generate improvements based on an analysis of their properties and the issue drivers. An improvement methodology was developed to harness a number of techniques that were found to effective in resolving the issue drivers and improving these knowledge intensive processes.
Resumo:
In this project, two broad facets in the design of a methodology for performance optimization of indexable carbide inserts were examined. They were physical destructive testing and software simulation.For the physical testing, statistical research techniques were used for the design of the methodology. A five step method which began with Problem definition, through System identification, Statistical model formation, Data collection and Statistical analyses and results was indepthly elaborated upon. Set-up and execution of an experiment with a compression machine together with roadblocks and possible solution to curb road blocks to quality data collection were examined. 2k factorial design was illustrated and recommended for process improvement. Instances of first-order and second-order response surface analyses were encountered. In the case of curvature, test for curvature significance with center point analysis was recommended. Process optimization with method of steepest ascent and central composite design or process robustness studies of response surface analyses were also recommended.For the simulation test, AdvantEdge program was identified as the most used software for tool development. Challenges to the efficient application of this software were identified and possible solutions proposed. In conclusion, software simulation and physical testing were recommended to meet the objective of the project.
Resumo:
In the search for productivity increase, industry has invested on the development of intelligent, flexible and self-adjusting method, capable of controlling processes through the assistance of autonomous systems, independently whether they are hardware or software. Notwithstanding, simulating conventional computational techniques is rather challenging, regarding the complexity and non-linearity of the production systems. Compared to traditional models, the approach with Artificial Neural Networks (ANN) performs well as noise suppression and treatment of non-linear data. Therefore, the challenges in the wood industry justify the use of ANN as a tool for process improvement and, consequently, add value to the final product. Furthermore, Artificial Intelligence techniques such as Neuro-Fuzzy Networks (NFNs) have proven effective, since NFNs combine the ability to learn from previous examples and generalize the acquired information from the ANNs with the capacity of Fuzzy Logic to transform linguistic variables in rules.
Resumo:
The focus of this paper is to outline the practical experiences and the lessons learned derived from the assessment of the requirements management process in two industrial case studies. Furthermore this paper explains the main structure of an alternative assessment approach that has been used in the appraisal of the two case studies. The assessment approach helped us to know the current state of the organizational requirement management process. We have to point out that these practical experiences and the lessons learned can be helpful to reduce risks and costs of the on-site assessment process.
Resumo:
This paper aims to obtain a baseline snapshot of the requirement management process using a two-stage questionnaire to identify both performed and non-performed CMMI practices. The questionnaire proposed in this paper may help with the assessment of the requirement management process, provide useful information related to the current state of the process, and indicate those practices that require immediate attention with the aim of begin a Software Process Improvement program.
Resumo:
This article shows how a very small company has tailored Scrum according to its own needs. The main additions made were the “sprint design” phase and the “sprint test” phase. Before the sprint 0, the requirements elicitation and the functional specification were made in order to meet deadlines and costs agreed with clients. Besides, the introduction of an agile project management tool has supported all the process and it is considered the main success factor for the institutionalization of the Scrum process.
Resumo:
This article introduces a small setting case study about the benefits of using TSPi in a software project. An adapted process from the current process based on the TSPi was defined. The pilot project had schedule and budget constraints. The process began by gathering historical data from previous projects in order to get a measurement repository. The project was launched with the following goals: increase the productivity, reduce the test time and improve the product quality. Finally, the results were analysed and the goals were verified.
Resumo:
The implementation of advanced manufacturing systems with high process capability is an essential requirement for the high value manufacturing industries. To ensure high process capability, industry needs to deal with the requirement for tight tolerances and the unavoidable variations in materials, and manufacturing and inspection processes. In the case of machining superalloys, such variations result in the need to change the machine parameters for producing different batches of materials from different suppliers. This is required in order to get the process under control and reduce waste and defects, leading to better competitiveness. This papers discuss the variability in materials and the corresponding process requirements when machining superalloys, and highlights the impact of metrology in achieving manufacturing process improvement.
Resumo:
This dissertation develops a process improvement method for service operations based on the Theory of Constraints (TOC), a management philosophy that has been shown to be effective in manufacturing for decreasing WIP and improving throughput. While TOC has enjoyed much attention and success in the manufacturing arena, its application to services in general has been limited. The contribution to industry and knowledge is a method for improving global performance measures based on TOC principles. The method proposed in this dissertation will be tested using discrete event simulation based on the scenario of the service factory of airline turnaround operations. To evaluate the method, a simulation model of aircraft turn operations of a U.S. based carrier was made and validated using actual data from airline operations. The model was then adjusted to reflect an application of the Theory of Constraints for determining how to deploy the scarce resource of ramp workers. The results indicate that, given slight modifications to TOC terminology and the development of a method for constraint identification, the Theory of Constraints can be applied with success to services. Bottlenecks in services must be defined as those processes for which the process rates and amount of work remaining are such that completing the process will not be possible without an increase in the process rate. The bottleneck ratio is used to determine to what degree a process is a constraint. Simulation results also suggest that redefining performance measures to reflect a global business perspective of reducing costs related to specific flights versus the operational local optimum approach of turning all aircraft quickly results in significant savings to the company. Savings to the annual operating costs of the airline were simulated to equal 30% of possible current expenses for misconnecting passengers with a modest increase in utilization of the workers through a more efficient heuristic of deploying them to the highest priority tasks. This dissertation contributes to the literature on service operations by describing a dynamic, adaptive dispatch approach to manage service factory operations similar to airline turnaround operations using the management philosophy of the Theory of Constraints.