878 resultados para project based organisation
Resumo:
Dramatic improvements in DNA sequencing technologies have led to amore than 1,000-fold reduction in sequencing costs over the past five years.Genome-wide research approaches can thus now be applied beyond medicallyrelevant questions to examine the molecular-genetic basis of behavior,development and unique life histories in almost any organism. A first step foran emerging model organism is usually establishing a reference genomesequence. I offer insight gained from the fire ant genome project. First, I detailhow the project came to be and how sequencing, assembly and annotationstrategies were chosen. Subsequently, I describe some of the issues linked toworking with data from recently sequenced genomes. Finally, I discuss anapproach undertaken in a follow-up project based on the fire ant genomesequence.
Resumo:
The Institute of Public Health in Ireland were asked to submit a paper on 'Cross-border cooperation on healthcare' for a joint meeting between the Oireachtas Joint Committee on Health and Children and the Northern Ireland Assembly Health Committee which took place in Leinster House on 1 March 2012. Key points from the submission included: o The Institute of Public Health in Ireland (IPH) is an all-island organisation which promotes cooperation between the Republic of Ireland and Northern Ireland with the aim of improving population health on the island and tackling health inequalities. IPH work is focused on addressing the causes of ill health rather than the design and delivery of treatment services. o North/South cooperation on health was mandated under the Belfast Agreement in 1998 in five domains, including health promotion. IPH has supported the North South Ministerial Council (NSMC) in respect of the health promotion strand since inception. o The Department of Health and Department of Health, Social Services and Public Safety North-South Feasibility Study (December 2011) states that mutual benefits are most evident from cooperation in the areas of (i) anticipating trends and illnesses in a collective manner (ii) public health issues (iii) specialised services where the population or activity required to sustain the service cannot be met by either jurisdiction alone and (iv) in relation to those areas adjacent to the border. o The European Directive on Cross-Border Healthcare will be implemented in the next few years which will have implications in relation to patients travelling for healthcare across the Republic of Ireland/Northern Ireland border. o IPH is supporting the development of new public health strategies in the Republic of Ireland and Northern Ireland which are both due for publication this year. o There are tangible benefits from cross-border cooperation in the health sector, both in public health and in health service planning and delivery and there are many examples of successful initiatives. However, developments are not occurring in the context of an agreed plan or overall strategic context and tend to be project-based and concentrated in border counties. o Successful cross-border cooperation requires high level support and integration into departmental policy cycles. The provision of data on an all-island basis supports cross-border cooperation as does the operation of sustainable all-island organisations which can support research, evaluations and programmes. o In the future, cross-border cooperation in health will be more effective if developed with a strategic planning process intrinsically linked to Departmental priorities. o North-South cooperation in the areas of alcohol, obesity, tobacco health surveys and rare diseases will be particularly beneficial.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.
Resumo:
Snow and ice removal on public streets is a critical part of the work of departments of transportation in northern U.S. states, including Iowa. Iowa is also a state rich in agricultural resources, some of which undergo industrial processes that generate a number of byproducts, e.g., in converting corn to ethanol or soy to biodiesel. It would be desirable to find those that, with a minimum of additional processing, can be used as a deicing compound, either alone or in combination with products currently in use. The focus of this work is therefore to investigate by-products from agricultural processes that may be suitable for use as deicing applications. This topic has been investigated in the past by others, with many patented products described in the literature. An initial screening was carried out to assess the potential acceptability of selected commercial products, as well as a glycerol developed for this project. Based on the variety of parameters tested, the product combination that shows the greatest promise for future application consists of 80% glycerol with 20% NaCl.
Resumo:
The objective of this case study is to provide a Finnish solution provider company an objective, in-depth analysis of their project based business and especially of project estimation accuracy. A project and customer profitability analysis is conducted as a complementary addition to describe profitability of the Case Company’s core division. The theoretical framework is constructed on project profitability and customer profitability analysis. Project profitability is approached starting from managing projects, continuing to project pricing process and concluding to project success. The empirical part of this study describes the Case Company’s project portfolio, and by means of quantitative analysis, the study describes how the characteristics of a project impact the project’s profitability. The findings indicate that it really makes a difference in project portfolio’s estimated and actual profitability when methods of installation and technical specifications are scrutinized. Implications on profitability are gathered into a risk assessment tool proposal.
Resumo:
Globalisation has prompted increasing numbers of construction profes-sional services (CPS) firms to internationalise and export their services. The driver has been twofold; firstly to increase turnover/profits and sec-ondly, to minimise the risk of a reliance on working in a single domestic market which has a fluctuating demand. Secondly, where firms have out-grown their domestic market, and in order to expand, they must export overseas. There has been little research into the way CPS firms operate overseas, yet construction represents approximately 10% of global GDP; this means that understanding CPS firms is important. This paper investigates how CPS firms internationalise and the drivers that impact their decisions and operations overseas. A survey was undertaken and interviews conducted that showed CPS firms are project driven, in-vesting heavily in the process of seeking work/bidding for projects, and are very focused on delivering projects with minimum risk. Increasing foreign ownership, changing procurement approaches and more consolidation of CPS firms in the global marketplace present a changing business land-scape. The research develops a framework of tangible and intangible factors, such as competencies, business organisation culture, leadership and reputation in order to better understand how CPS firms export their ser-vices. Whilst all CPS firms share the same framework of factors, the re-sulting synergies are different not only for each firm but also for each pro-ject. The knowledge-intensive and project-based nature of CPS firms presents a challenge in understanding the way they operate in the global service economy.
Resumo:
In the winter of 2007, Doug Aitken’s moving image installation, sleepwalkers, was projected onto the exterior walls of the Museum of Modern Art in New York. The project was a collaboration between Aitken, the museum and Creative Time, a New York-based organisation that commissions public art projects. A site-specific version of the installation has been commissioned by the Miami Art Museum for the opening of its new facility, designed by Swiss architects Herzog and de Meuron, in 2013: “sleepwalkers (Miami) will expand the work’s landscape and characters in a manner that reflects the diverse social fabric of Miami.” This essay examines sleepwalkers as an example of the emerging form of film as public art. There are three strands to my argument: first, an examination of the role of film in the redefinition of public art, shifting away from spatial practices concerned with fixed and permanent notions of space, community and art and towards transient and experimental spatial and artistic practices; second,a discussion of the relationship between projection and the built environment and the ways that the qualities of luminescence, transparency, movement and connectivity are transferred from projected images to the surfaces on which they are projected and the spaces around them; and third, an examination of the ways that sleepwalkers uses only certain aspects of narrativity, those concerned with movement and change, and avoids hermeneutic absorption in order to keep the spectators moving (transposing the idea of sleepwalking from characters to spectators). Transience and transparency are key ideas in the conceptualisation of the work, and these are deployed with significant differences in relation to the distinctive characteristics of each city and each museum.
Resumo:
Reductions in the division of labour are a significant feature of modern developments in work organisation. It has been recognised that a reduced division of labour can have the advantages of job enrichment and lower coordination costs. In this paper it is shown how advantages from a lesser division of labour can stem from the flow of work between different sets of resources where the work rates of individual production stages are subject to uncertainties. Both process and project-based work are considered. Implications for the boundaries of the firm and for innovation processes are noted.
Resumo:
Loaded with 16% of the world’s population, India is a challenged country. More than a third of its citizens live below the poverty line - on less than a dollar a day. These people have no proper electricity, no proper drinking water supply, no proper sanitary facilities and well over 40% are illiterates. More than 65% live in rural areas and 60% earn their livelihood from agriculture. Only a meagre 3.63% have access to telephone and less than 1% have access to a computer. Therefore, providing access to timely information on agriculture, weather, social, health care, employment, fishing, is of utmost importance to improve the conditions of rural poor. After some introductive chapters, whose function is to provide a comprehensive framework – both theoretical and practical – of the current rural development policies and of the media situation in India and Uttar Pradesh, my dissertation presents the findings of the pilot project entitled “Enhancing development support to rural masses through community media activity”, launched in 2005 by the Department of Mass Communication and Journalism of the Faculty of Arts of the University of Lucknow (U.P.) and by the local NGO Bharosa. The project scope was to involve rural people and farmers from two villages of the district of Lucknow (namely Kumhrava and Barhi Gaghi) in a three-year participatory community media project, based on the creation, implementation and use of a rural community newspaper and a rural community internet centre. Community media projects like this one have been rarely carried out in India because the country has no proper community media tradition: therefore the development of the project has been a challenge for the all stakeholders involved.
Resumo:
This work presents an educational formal initiative aimed to monitor the acquisition and strengthening of competences by students that are being taught in project management subject. Groups of students belonging to three universities, embracing different knowledge areas such as engineering, biology, etc., were selected to run the experience. All of them had nevertheless a common and basic starting point: inexperience in project management field. In this scenario, we propose a new theoretical and practical approach oriented to reinforce problem-solving and related competences in a project management subject context. For this purpose, a Project-Based Learning (PjBL) initiative has been specifically designed and developed. The main idea is to bring a real world engineering project management case into the classroom, where students must face up to a completely new learning approach –groups in different locations, collaborative mode and unspecific solution, supported by a powerful internet platform:.project.net (http://www.Project.net). Other relevant aspects such as project climate, knowledge increasing, have also been monitored during the course. Results show and overall improvement in key competences. The obtained information will be used in two ways: to feed the students back about personal opportunities for improvement in specific competences, and to fine-tune the experience for further initiatives.
Resumo:
Experiences relating to the InternationalMasters in Rural Development from the Technical University of Madrid (Universidad Politécnica de Madrid, UPM), the first Spanish programme to receive a mention as a Registered Education Programme by InternationalProject Management Association (IPMA) are considered. Backed by an educational strategy based on Project-Based Learning dating back twenty years, this programme has managed to adapt to the competence evaluation requirements proposed by the European Space for Higher Education (ESHE). In order to do this the training is linked to the professional qualification using competences as a reference leading to the qualification in project management as established by the IPMA.
Resumo:
The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of “learning strategy”. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper
Resumo:
The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of ―learning strategy‖. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper.
Resumo:
This document presents an innovative, formal educational initiative that is aimed at enhancing the development of engineering students' specific competences. The subject of project management is the common theoretical and practical framework that articulates an experience that is carried out by multidisciplinary groups. Full utilization of Web 2.0 platforms and Project Based Learning constitutes the applied methodology. More specifically, this study focuses on monitoring communication competence when working in virtual environments, providing an ad-hoc rubric as a final result.
Resumo:
The Bologna Declaration and the implementation of the European Higher Education Area are promoting the use of active learning methodologies such as cooperative learning and project based learning. This study was motivated by the comparison of the results obtained after applying Cooperative Learning (CL) and Project Based Learning (PBL) to a subject of Computer Engineering. The fundamental hypothesis tested was whether the academic success achieved by the students of the first years was higher when CL was applied than in those cases to which PBL was applied. A practical case, by means of which the effectiveness of CL and PBL are compared, is presented in this work. This study has been carried out at the Universidad Politécnica de Madrid, where these mechanisms have been applied to the Operating Systems I subject from the Technical Engineering in Computer Systems degree (OSIS) and to the same subject from the Technical Engineering in Computer Management degree (OSIM). Both subjects have the same syllabus, are taught in the same year and semester and share also formative objectives. From this study we can conclude that students¿ academic performance (regarding the grades given) is greater with PBL than with CL. To be more specific, the difference is between 0.5 and 1 point for the individual tests. For the group tests, this difference is between 2.5 and 3 points. Therefore, this study refutes the fundamental hypothesis formulated at the beginning. Some of the possible interpretations of these results are referred to in this study.