990 resultados para construction productivity


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Understanding the motion characteristics of on-site objects is desirable for the analysis of construction work zones, especially in problems related to safety and productivity studies. This article presents a methodology for rapid object identification and tracking. The proposed methodology contains algorithms for spatial modeling and image matching. A high-frame-rate range sensor was utilized for spatial data acquisition. The experimental results indicated that an occupancy grid spatial modeling algorithm could quickly build a suitable work zone model from the acquired data. The results also showed that an image matching algorithm is able to find the most similar object from a model database and from spatial models obtained from previous scans. It is then possible to use the matched information to successfully identify and track objects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As research has become an important indicator of TEFL academics’ overall performance in Chinese higher education institutions, it is critical that TEFL academics are able to meet the expectation of conducting research. This mixedmethod study investigated research productivity of Chinese TEFL academics and associated influences, with the ultimate objective of constructing a framework to help build their research capacity in the future. Using an initial survey, the study provided a snapshot of research productivity of 182 TEFL academics from three Chinese higher education institutions, and individual and institutional characteristics that influenced their research productivity. Using interviews and documents as the data sources, the subsequent qualitative case study of two purposively-sampled Chinese TEFL departments provided insights into Chinese TEFL academics’ perceptions about research, and individual, institutional and departmental efforts in meeting the research expectation. The findings from this study revealed that the 182 Chinese TEFL academics’ research productivity during 2004-2008 was relatively low as a whole as was the quality of their research. This study identified four influences that impacted on Chinese TEFL academics’ research productivity: TEFL disciplinary influences, institutional and departmental research environments, individual characteristics desirable for research, and TEFL academics’ perceptions about research. Drawing upon the above findings from this study, a Framework towards Enhancing Chinese TEFL Academics’ Research Productivity (FECTARP) was constructed. The FECTARP synthesised the findings from the study, and presented a framework for Chinese institutions and TEFL departments to enhance their TEFL academics’ research capacity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Visual recording devices such as video cameras, CCTVs, or webcams have been broadly used to facilitate work progress or safety monitoring on construction sites. Without human intervention, however, both real-time reasoning about captured scenes and interpretation of recorded images are challenging tasks. This article presents an exploratory method for automated object identification using standard video cameras on construction sites. The proposed method supports real-time detection and classification of mobile heavy equipment and workers. The background subtraction algorithm extracts motion pixels from an image sequence, the pixels are then grouped into regions to represent moving objects, and finally the regions are identified as a certain object using classifiers. For evaluating the method, the formulated computer-aided process was implemented on actual construction sites, and promising results were obtained. This article is expected to contribute to future applications of automated monitoring systems of work zone safety or productivity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The uncertain and dynamic nature of International Construction Joint Venture (ICJV) performance is evolved with many critical factors which lead to make partner relationships more complex in respect of making decisions to maintain a cohesive environment. Addressing to the fact, a generic system dynamics performance model for ICJV is developed by integrating a number variables as to get an overall impact on performance of ICJV and to make effective decisions based on that. In order to formulate and validate the model both structurally and behaviourally, both qualitative and quantitative data are gathered by conducting intensive interviews from two ICJVs in Thailand. After conducting intensive simulations of model, three major problems are identified related to negative value gap, low productivity in construction and high rate of ineffective information sharing of both ICJVs. Several policies are suggested and integrated application of these policies provides a maximum improvement to performance of the ICJV.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The productivity of the construction industry worldwide has been declining over the past forty years. One approach to improving the situation is by the introduction of lean construction. The IKEA model has also been shown to be beneficial when used in the construction context. A framework is developed in which the lean construction concept is embodied within the IKEA model by integrating Virtual Prototyping (VP) technology and its implementation is described and evaluated through a real-life case implementing the lean production philosophy. The operational flows of the IKEA model and lean construction are then compared to analyze the feasibility of IKEA-based lean construction. It is concluded that the successful application of the IKEA model in this context will promote the implementation of lean construction and improve the efficiency of the industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction practitioners often experience unexpected results of their scheduling-related decisions. This is mainly due to lack of understanding of the dynamic nature of construction system. However, very little attention has been given to its significant importance and few empirical studies have been undertaken on this issue. This paper, therefore, analyzes the effect of aggressive scheduling, overtime, resource adding, and schedule slippage on construction performance, focusing on workers’ reactions to those scheduling decisions. Survey data from 102 construction practitioners in 38 construction sites are used for the analysis. The results indicate that efforts to increase work rate by working overtime, resource adding, and aggressive scheduling can be offset due to losses in productivity and quality. Based on the research findings, practical guidelines are then discussed to help site managers to effectively deal with the dynamics of scheduling and improve construction performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Identifying the design features that impact construction is essential to developing cost effective and constructible designs. The similarity of building components is a critical design feature that affects method selection, productivity, and ultimately construction cost and schedule performance. However, there is limited understanding of what constitutes similarity in the design of building components and limited computer-based support to identify this feature in a building product model. This paper contributes a feature-based framework for representing and reasoning about component similarity that builds on ontological modelling, model-based reasoning and cluster analysis techniques. It describes the ontology we developed to characterize component similarity in terms of the component attributes, the direction, and the degree of variation. It also describes the generic reasoning process we formalized to identify component similarity in a standard product model based on practitioners' varied preferences. The generic reasoning process evaluates the geometric, topological, and symbolic similarities between components, creates groupings of similar components, and quantifies the degree of similarity. We implemented this reasoning process in a prototype cost estimating application, which creates and maintains cost estimates based on a building product model. Validation studies of the prototype system provide evidence that the framework is general and enables a more accurate and efficient cost estimating process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The built environment has a profound impact on our natural environment, economy, health and productivity. As the majority of the people spent most of their time inside buildings, the environment in which they perform their daily activities will have an impact on their health and productivity. Studies have been conducted about the negative impacts of presence of non-favorable conditions to human health and well being. The term "Sick Building Syndrome" (SBS) is used to describe situations in which building occupants experience acute health and comfort problems that appear to be linked to their time spent in a building. Sustainable infrastructure rating systems have requirements intended to improve occupant productivity and health.While the impact of Sustainable Infrastructure in energy consumption and waste/water reduction can be measured using available tools, the impact on productivity remained as an assumption that is not clearly measured. The purpose of this research is to develop a framework to assess whether the impacts of the incorporation of features intended to improve occupants’ performance and health such as: increased ventilation, lightning and thermal comfort serve their intended purpose.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This book will be of particular interest to academics, researchers, and graduate students at universities and industrial practitioners seeking to apply mobile and pervasive computing systems to improve construction industry productivity.