926 resultados para System management
Resumo:
Transportation Systems Center, Cambridge, Mass.
Resumo:
Transportation Department, Washington, D.C.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
The paper describes cluster management software and hardware of SCIT supercomputer clusters built in Glushkov Institute of Cybernetics NAS of Ukraine. The paper shows the performance results received on systems that were built and the specific means used to fulfil the goal of performance increase. It should be useful for those scientists and engineers that are practically engaged in a cluster supercomputer systems design, integration and services.
Resumo:
Matrix factorization (MF) has evolved as one of the better practice to handle sparse data in field of recommender systems. Funk singular value decomposition (SVD) is a variant of MF that exists as state-of-the-art method that enabled winning the Netflix prize competition. The method is widely used with modifications in present day research in field of recommender systems. With the potential of data points to grow at very high velocity, it is prudent to devise newer methods that can handle such data accurately as well as efficiently than Funk-SVD in the context of recommender system. In view of the growing data points, I propose a latent factor model that caters to both accuracy and efficiency by reducing the number of latent features of either users or items making it less complex than Funk-SVD, where latent features of both users and items are equal and often larger. A comprehensive empirical evaluation of accuracy on two publicly available, amazon and ml-100 k datasets reveals the comparable accuracy and lesser complexity of proposed methods than Funk-SVD.
Resumo:
Improvement of the environmental performance of processes and products is a common objective in industry, and has been receiving increased attention in recent years. The main objective of this work is to evaluate the potential environmental impact of two bedding products, a polyurethane foam mattress (PFM) and a pocket spring mattress (PSM). These two types are the most common mattresses used in Europe. A Life Cycle Assessment (LCA) shows that the PFM has a higher environmental impact than the PSM. For both products the main cause of environmental impact is the manufacturing process, respectively the polyurethane foam block moulding process for the PFM, and the pocket spring nucleus process for the PSM. A scenario analysis shows the possibility of reducing the environmental impact of the products’ life cycle using an alternative End-of-Life scenario, resorting to incineration rather than landfill. Two strategies were also studied in order to reduce the environmental impact of the PFM: (1) reutilization of foam that was sent to the waste system management, and (2) a 20% weight reduction of the polyurethane foam. The second strategy has proven to be the most effective.
Resumo:
Smart Grids (SGs) appeared as the new paradigm for power system management and operation, being designed to integrate large amounts of distributed energy resources. This new paradigm requires a more efficient Energy Resource Management (ERM) and, simultaneously, makes this a more complex problem, due to the intensive use of distributed energy resources (DER), such as distributed generation, active consumers with demand response contracts, and storage units. This paper presents a methodology to address the energy resource scheduling, considering an intensive use of distributed generation and demand response contracts. A case study of a 30 kV real distribution network, including a substation with 6 feeders and 937 buses, is used to demonstrate the effectiveness of the proposed methodology. This network is managed by six virtual power players (VPP) with capability to manage the DER and the distribution network.
Resumo:
Dissertação de Mestrado em Ambiente, Saúde e Segurança.
Resumo:
Se a implementação de Sistemas de Gestão dentro dos padrões recomendados pelas normas individuais de referência, já é prática comum nas empresas nacionais, a implementação de Sistemas Integrados de Gestão (SIG), verdadeiramente contidos uns nos outros como um só, é ainda invulgar. Constitui actualmente emblema de modernidade, enquanto aplicado à construção. Estudar todos os meandros e práticas associadas aos SIG, neste pequeno‐grande mundo, que é o das obras concessionadas, é de facto um grande desafio, não tanto pela novidade do conceito que representa, mas pela possibilidade de idealizar uma proposta de uma sistemática exequível, que me proponho apresentar. Assim, este trabalho baseia‐se numa pesquisa de informação teórica, bem como na prática da implementação de um Sistema Integrado numa empresa de referência no sector – a Empresa de Construções Amândio Carvalho, S.A. e neste caso, concretamente na obra ‐ “VRI: Aeroporto/IP4 – Lote 3”. O objectivo geral baseia‐se em diagnosticar as principais dificuldades e limitações enfrentadas por um sector de actividade, na adopção de um modelo específico de gestão da qualidade, ambiente e segurança no trabalho, baseando‐se nas normas de referência, ISO 9001: 2000, ISO 14001:2004 e OHSAS 18001: 2001. Normas estas, que embora agora tenham sido revistas a primeira e a última, na altura em que a obra decorreu, encontravam‐se em vigor. No caso especifico de estudo, comprova‐se a necessidade de implementação de um Sistema único, que atinja o nível de comprometimento dos recursos financeiros e humanos necessários para a execução de obra, respeitando os princípios apresentados pelo cliente. Pretende‐se ainda demonstrar que a adopção de Sistemas “desintegrados”, poderá conduzir ao colapso da estrutura montada para corresponder aos requisitos propostos.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.
Resumo:
Load forecasting has gradually becoming a major field of research in electricity industry. Therefore, Load forecasting is extremely important for the electric sector under deregulated environment as it provides a useful support to the power system management. Accurate power load forecasting models are required to the operation and planning of a utility company, and they have received increasing attention from researches of this field study. Many mathematical methods have been developed for load forecasting. This work aims to develop and implement a load forecasting method for short-term load forecasting (STLF), based on Holt-Winters exponential smoothing and an artificial neural network (ANN). One of the main contributions of this paper is the application of Holt-Winters exponential smoothing approach to the forecasting problem and, as an evaluation of the past forecasting work, data mining techniques are also applied to short-term Load forecasting. Both ANN and Holt-Winters exponential smoothing approaches are compared and evaluated.
Resumo:
A cidade do Porto é uma das regiões do país onde é importante uma gestão sustentável e integrada dos recursos hídricos. A (re) utilização de água surge neste contexto como uma possível resposta na sua utilização como um recurso hídrico passível de ser usado beneficamente, permitindo a poupança de fontes de água convencionais e aumentando a disponibilidade dos recursos hídricos existentes para finalidades que requerem padrões de qualidade mais exigentes. O potencial desta prática no nosso país é enorme, considerando que o volume de água tratada descarregada no ano 2000 era suficiente para suprir 10% das necessidades em água para rega num ano seco, sem necessidade de armazenamento sazonal. Por outro lado, um sistema de rega, quando devidamente projetado e funcionando adequadamente, permite que a água seja aplicada com um caudal, duração e frequência que maximizam o consumo da água e nutrientes pela planta. Este projeto consiste no desenvolvimento de um Sistema de Gestão Técnica para o controlo do sistema de rega dos jardins do ISEP – Instituto Politécnico de Engenharia do Porto com recurso a um autómato programável (PLC). Pretende-se otimizar os consumos energéticos do sistema de rega tendo em conta os parâmetros de humidade, temperatura e velocidade do vento característicos do local a regar. Outros dos objetivos é controlar o processo de enchimento e de rega. Esta operação consiste no controlo das bombas e respetivos débitos e conhecimento dos caudais necessários. Pretende-se, igualmente, definir e colocar em marcha todo o equipamento necessário para a realização do projeto. Os dados coletados devem ser tratados de tal modo que possam ser realizadas análises diárias, mensais e/ou anuais. Neste trabalho foram efetuados os cálculos de dimensionamentos relativamente às necessidades hídricas da planta e necessidades de rega, entre outros.
Resumo:
No âmbito da unidade curricular Dissertação/Estágio/Projeto, foi desenvolvido, durante um estágio na Câmara Municipal do Porto, o estudo da eficiência do sistema inteligente de controlo de tráfego implementado na cidade. Este sistema é designado como Sistema Inteligente de Gestão Autónoma - SIGA e tem como base de funcionamento o software de gestão de tráfego GERTRUDE da empresa GERTRUDE SAEM. O sistema de controlo de tráfego encontra-se repartido em 10 zonas interligadas, focadas essencialmente no centro da cidade do Porto. O estudo foi aplicado apenas a uma parte da zona da Constituição, nomeadamente a rua da Constituição, desde a Praça Marquês até à rua Antero de Quental. A eficiência mediu-se pela comparação de duas situações, a circulação e comportamento das correntes de tráfego com o sistema em funcionamento normal e com o sistema desativado. Por sua vez, o indicador utilizado que permitiu avaliar o sistema, foi o nível de serviço obtido pelo atraso médio por veículo em cada ramo de cada interseção. Para determinação do atraso, foram testados diferentes métodos, para se tentar perceber qual aquele que melhor se adequava à situação e que exigia menor número de recursos humanos. À frente serão exaradas algumas conclusões acerca da metodologia de cada um deles e condicionantes que levaram à não utilização de todos os métodos. Depois de aplicadas as metodologias que permitiram determinar o nível de serviço em cada grupo semafórico das diferentes interseções, percebeu-se que existe uma grande diferença na circulação entre as duas situações, sendo que a mais-valia que este sistema apresenta é a coordenação das diferentes interseções que se encontram abrangidas pelas 10 zonas pertencentes ao SIGA.