889 resultados para Scenario planning
Resumo:
Background: Surgical resection in locally advanced breast cancer produces large defects that may not be suitable for primary closure. Immediate reconstruction is controversial and presents a complicated scenario for breast surgeons and plastic surgeons. Methods: In this study, a different design was planned for the latissimus dorsi musculocutaneous flap with primary closure in V-Y for the correction of major lesions in the anterior chest wall. Twenty-five patients underwent immediate locally advanced breast cancer reconstruction with a V-Y latissimus dorsi musculocutaneous flap. This flap was raised from adjacent tissue located on the lateral and posterior thoracic region and presented a triangular shape whose base was the lateral aspect of the mastectomy wound. The technique was indicated in patients with large thoracic wounds. Results: Mean follow-up time was 16 months. Closure was obtained in the donor and recipient sites without the use of skin grafts or other more major procedures. Complications occurred in nine patients (36 percent), including dorsal wound dehiscence in five patients and seroma in three. All cases except one were treated by a conservative approach with a good result. No total flap loss was reported. All patients achieved a satisfactory thoracic reconstruction and adequate wound care. Conclusions: The V-Y latissimus dorsi musculocutaneous flap is a reliable technique for immediate locally advanced breast cancer reconstruction. The technique is advantageous because the V-Y design allows primary closure of the chest wound and donor defect. Success depends on patient selection, coordinated planning with the breast cancer surgeon, and careful intraoperative management. (Plast. Reconstr. Surg. 127: 2186, 2011.)
Resumo:
Electric vehicles introduction will affect cities environment and urban mobility policies. Network system operators will have to consider the electric vehicles in planning and operation activities due to electric vehicles’ dependency on the electricity grid. The present paper presents test cases using an Electric Vehicle Scenario Simulator (EVeSSi) being developed by the authors. The test cases include two scenarios considering a 33 bus network with up to 2000 electric vehicles in the urban area. The scenarios consider a penetration of 10% of electric vehicles (200 of 2000), 30% (600) and 100% (2000). The first scenario will evaluate network impacts and the second scenario will evaluate CO2 emissions and fuel consumption.
Resumo:
This paper presents a simulator for electric vehicles in the context of smart grids and distribution networks. It aims to support network operator´s planning and operations but can be used by other entities for related studies. The paper describes the parameters supported by the current version of the Electric Vehicle Scenario Simulator (EVeSSi) tool and its current algorithm. EVeSSi enables the definition of electric vehicles scenarios on distribution networks using a built-in movement engine. The scenarios created with EVeSSi can be used by external tools (e.g., power flow) for specific analysis, for instance grid impacts. Two scenarios are briefly presented for illustration of the simulator capabilities.
Resumo:
Dissertation submitted in partial fulfilment of the requirements for the Degree of Master of Science in Geospatial Technologies
Resumo:
Thesis to obtain the Master Degree in Electronics and Telecommunications Engineering
Resumo:
The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.
Resumo:
Dissertação de mestrado em Engenharia Industrial
Resumo:
This research looked at the scientific evidence available on climate change and in particular, projections on sea level rise which ranged from 0.5m to 2m by the end of the century. These projections were then considered in an Irish context. A review of current policy in Ireland revealed that there was no dedicated Government policy on climate change or coastal zone management. In terms of spatial planning policy, it became apparent that there was little or no guidance on climate change either at a national, regional or local level. Therefore, to determine the likely impacts of sea level rise in Ireland based on current spatial planning practice and policy, a scenario-building exercise was carried out for two case study areas in Galway Bay. The two case study areas were: Oranmore, a densely populated town located to the east of Inner Galway Bay; and Tawin Island, a rural dispersed community, located to the south east of Inner Galway Bay. A ‘best’ and ‘worse’ case scenario was envisaged for both areas in terms of sea level rise. In the absence of specific climate change policies it was projected that in the ‘best’ case scenario of 0.5m sea level rise, Tawin Island would suffer serious and adverse impacts while Oranmore was likely to experience slight to moderate impacts. However, in the ‘worse’ case scenario of a 2m sea level rise, it was likely that Tawin Island would be abandoned while many houses, businesses and infrastructure built within the floodplain of Oranmore Bay would be inundated and permanently flooded. In this regard, it was the author’s opinion that a strategic and integrated climate change policy and adaptation plan is vital for the island of Ireland that recognises the importance of integrated land use and spatial planning in terms of mitigation and adaptation to climate change.
Resumo:
The Thesis gives a decision support framework that has significant impact on the economic performance and viability of a hydropower company. The studyaddresses the short-term hydropower planning problem in the Nordic deregulated electricity market. The basics of the Nordic electricity market, trading mechanisms, hydropower system characteristics and production planning are presented in the Thesis. The related modelling theory and optimization methods are covered aswell. The Thesis provides a mixed integer linear programming model applied in asuccessive linearization method for optimal bidding and scheduling decisions inthe hydropower system operation within short-term horizon. A scenario based deterministic approach is exploited for modelling uncertainty in market price and inflow. The Thesis proposes a calibration framework to examine the physical accuracy and economic optimality of the decisions suggested by the model. A calibration example is provided with data from a real hydropower system using a commercial modelling application with the mixed integer linear programming solver CPLEX.
Resumo:
Techniques of evaluation of risks coming from inherent uncertainties to the agricultural activity should accompany planning studies. The risk analysis should be carried out by risk simulation using techniques as the Monte Carlo method. This study was carried out to develop a computer program so-called P-RISCO for the application of risky simulations on linear programming models, to apply to a case study, as well to test the results comparatively to the @RISK program. In the risk analysis it was observed that the average of the output variable total net present value, U, was considerably lower than the maximum U value obtained from the linear programming model. It was also verified that the enterprise will be front to expressive risk of shortage of water in the month of April, what doesn't happen for the cropping pattern obtained by the minimization of the irrigation requirement in the months of April in the four years. The scenario analysis indicated that the sale price of the passion fruit crop exercises expressive influence on the financial performance of the enterprise. In the comparative analysis it was verified the equivalence of P-RISCO and @RISK programs in the execution of the risk simulation for the considered scenario.
Resumo:
Objective of this master’s thesis is to create an investment calculation model, which makes it possible to determine if the ski resort business can be profitable. The ultimate goal is to create a description with the help of theoretical knowledge, interviews and investment calculation model, how the operation of ski resort is possible to be profitable and what are the critical success factors for achieving this goal. Thesis is carried out as qualitative research, which is supported by the necessary constructive information utilizing calculations. The client company has provided valuable insights and material for this thesis. Theoretical report examines the steps of developing a business plan, investment components and methods as well as sensitivity analysis. The theoretical part is based on the articles, textbooks, interviews and researches. The empirical part of the thesis is assembled by benchmarking other same size Finnish ski resorts, conducting interviews and using investment calculation model. The empirical part provides comprehensive information about ski resort industry, the future of the project, the business plan and the profitability calculations. As the result of this thesis the investment calculation model, which makes it possible to simulate different scenarios for ski resort project, was formed. The model was used to create a picture in which kind of scenario the ski resort business would be profitable and what are the critical success factors in achieving this aim.
Resumo:
Indian economy is witnessing stellar growth over the last few years. There have been rapid developments in infrastructural and business front during the growth period.Internet adoption among Indians has been increasing over the last one decade.Indian banks have also risen to the occasion by offering new channels of delivery to their customers.Internet banking is one such new channel which has become available to Indian customers.Customer acceptance for internet banking has been good so far.In this study the researcher tried to conduct a qualitative and quantitative investigation of internet banking customer acceptance among Indians. The researcher tried to identify important factors that affect customer's behavioral intention for internet banking .The researcher also proposes a research model which has extended from Technology Acceptance Model for predicting internet banking acceptance.The findings of the study would be useful for Indian banks in planning and upgrading their internet banking service.Banks could increase internet banking adoption by making their customer awareness about the usefulness of the service.It is seen that from the study that the variable perceived usefulness has a positive influence on internet banking use,therefore internet banking acceptance would increase when customers find it more usefulness.Banks should plan their marketing campaigns taking into consideration this factor.Proper marketing communications which would increase consumer awareness would result in better acceptance of internet banking.The variable perceived ease of use had a positive influence on internet banking use.That means customers would increase internet banking usage when they find it easier to use.Banks should therefore try to develop their internet banking site and interface easier to use.Banks could also consider providing practical training sessions for customers at their branches on usage of internet banking interface.
Resumo:
Changes in mature forest cover amount, composition, and configuration can be of significant consequence to wildlife populations. The response of wildlife to forest patterns is of concern to forest managers because it lies at the heart of such competing approaches to forest planning as aggregated vs. dispersed harvest block layouts. In this study, we developed a species assessment framework to evaluate the outcomes of forest management scenarios on biodiversity conservation objectives. Scenarios were assessed in the context of a broad range of forest structures and patterns that would be expected to occur under natural disturbance and succession processes. Spatial habitat models were used to predict the effects of varying degrees of mature forest cover amount, composition, and configuration on habitat occupancy for a set of 13 focal songbird species. We used a spatially explicit harvest scheduling program to model forest management options and simulate future forest conditions resulting from alternative forest management scenarios, and used a process-based fire-simulation model to simulate future forest conditions resulting from natural wildfire disturbance. Spatial pattern signatures were derived for both habitat occupancy and forest conditions, and these were placed in the context of the simulated range of natural variation. Strategic policy analyses were set in the context of current Ontario forest management policies. This included use of sequential time-restricted harvest blocks (created for Woodland caribou (Rangifer tarandus) conservation) and delayed harvest areas (created for American marten (Martes americana atrata) conservation). This approach increased the realism of the analysis, but reduced the generality of interpretations. We found that forest management options that create linear strips of old forest deviate the most from simulated natural patterns, and had the greatest negative effects on habitat occupancy, whereas policy options that specify deferment and timing of harvest for large blocks helped ensure the stable presence of an intact mature forest matrix over time. The management scenario that focused on maintaining compositional targets best supported biodiversity objectives by providing the composition patterns required by the 13 focal species, but this scenario may be improved by adding some broad-scale spatial objectives to better maintain large blocks of interior forest habitat through time.
Resumo:
1. The UK Biodiversity Action Plan (UKBAP) identifies invertebrate species in danger of national extinction. For many of these species, targets for recovery specify the number of populations that should exist by a specific future date but offer no procedure to plan strategically to achieve the target for any species. 2. Here we describe techniques based upon geographic information systems (GIS) that produce conservation strategy maps (CSM) to assist with achieving recovery targets based on all available and relevant information. 3. The heath fritillary Mellicta athalia is a UKBAP species used here to illustrate the use of CSM. A phase 1 habitat survey was used to identify habitat polygons across the county of Kent, UK. These were systematically filtered using relevant habitat, botanical and autecological data to identify seven types of polygon, including those with extant colonies or in the vicinity of extant colonies, areas managed for conservation but without colonies, and polygons that had the appropriate habitat structure and may therefore be suitable for reintroduction. 4. Five clusters of polygons of interest were found across the study area. The CSM of two of them are illustrated here: the Blean Wood complex, which contains the existing colonies of heath fritillary in Kent, and the Orlestone Forest complex, which offers opportunities for reintroduction. 5. Synthesis and applications. Although the CSM concept is illustrated here for the UK, we suggest that CSM could be part of species conservation programmes throughout the world. CSM are dynamic and should be stored in electronic format, preferably on the world-wide web, so that they can be easily viewed and updated. CSM can be used to illustrate opportunities and to develop strategies with scientists and non-scientists, enabling the engagement of all communities in a conservation programme. CSM for different years can be presented to illustrate the progress of a plan or to provide continuous feedback on how a field scenario develops.
Resumo:
1. The UK Biodiversity Action Plan (UKBAP) identifies invertebrate species in danger of national extinction. For many of these species, targets for recovery specify the number of populations that should exist by a specific future date but offer no procedure to plan strategically to achieve the target for any species. 2. Here we describe techniques based upon geographic information systems (GIS) that produce conservation strategy maps (CSM) to assist with achieving recovery targets based on all available and relevant information. 3. The heath fritillary Mellicta athalia is a UKBAP species used here to illustrate the use of CSM. A phase 1 habitat survey was used to identify habitat polygons across the county of Kent, UK. These were systematically filtered using relevant habitat, botanical and autecological data to identify seven types of polygon, including those with extant colonies or in the vicinity of extant colonies, areas managed for conservation but without colonies, and polygons that had the appropriate habitat structure and may therefore be suitable for reintroduction. 4. Five clusters of polygons of interest were found across the study area. The CSM of two of them are illustrated here: the Blean Wood complex, which contains the existing colonies of heath fritillary in Kent, and the Orlestone Forest complex, which offers opportunities for reintroduction. 5. Synthesis and applications. Although the CSM concept is illustrated here for the UK, we suggest that CSM could be part of species conservation programmes throughout the world. CSM are dynamic and should be stored in electronic format, preferably on the world-wide web, so that they can be easily viewed and updated. CSM can be used to illustrate opportunities and to develop strategies with scientists and non-scientists, enabling the engagement of all communities in a conservation programme. CSM for different years can be presented to illustrate the progress of a plan or to provide continuous feedback on how a field scenario develops.