Real-time Energy Resource Scheduling considering a Real Portuguese Scenario
Data(s) |
05/05/2015
05/05/2015
29/08/2014
|
---|---|
Resumo |
The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling. |
Identificador |
http://hdl.handle.net/10400.22/5920 10.3182/20140824-6-ZA-1003.02541 |
Idioma(s) |
eng |
Publicador |
IFAC - International Federation of Automatic Control |
Relação |
IFAC;2014 http://www.ifac-papersonline.net/Detailed/65935.html |
Direitos |
openAccess |
Palavras-Chave | #Electric Vehicles #Virtual Power Players |
Tipo |
conferenceObject |