213 resultados para Ramps (Interchanges).


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Large trucks are involved in a disproportionately small fraction of the total crashes but a disproportionately large fraction of fatal crashes. Large truck crashes often result in significant congestion due to their large physical dimensions and from difficulties in clearing crash scenes. Consequently, preventing large truck crashes is critical to improving highway safety and operations. This study identifies high risk sites (hot spots) for large truck crashes in Arizona and examines potential risk factors related to the design and operation of the high risk sites. High risk sites were identified using both state of the practice methods (accident reduction potential using negative binomial regression with long crash histories) and a newly proposed method using Property Damage Only Equivalents (PDOE). The hot spots identified via the count model generally exhibited low fatalities and major injuries but large minor injuries and PDOs, while the opposite trend was observed using the PDOE methodology. The hot spots based on the count model exhibited large AADTs, whereas those based on the PDOE showed relatively small AADTs but large fractions of trucks and high posted speed limits. Documented site investigations of hot spots revealed numerous potential risk factors, including weaving activities near freeway junctions and ramps, absence of acceleration lanes near on-ramps, small shoulders to accommodate large trucks, narrow lane widths, inadequate signage, and poor lighting conditions within a tunnel.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Skid resistance is a condition parameter characterising the contribution that a road makes to the friction between a road surface and a vehicle tyre. Studies of traffic crash histories around the world have consistently found that a disproportionate number of crashes occur where the road surface has a low level of surface friction and/or surface texture, particularly when the road surface is wet. Various research results have been published over many years and have tried to quantify the influence of skid resistance on accident occurrence and to characterise a correlation between skid resistance and accident frequency. Most of the research studies used simple statistical correlation methods in analysing skid resistance and crash data.----- ------ Preliminary findings of a systematic and extensive literature search conclude that there is rarely a single causation factor in a crash. Findings from research projects do affirm various levels of correlation between skid resistance and accident occurrence. Studies indicate that the level of skid resistance at critical places such as intersections, curves, roundabouts, ramps and approaches to pedestrian crossings needs to be well maintained.----- ----- Management of risk is an integral aspect of the Queensland Department of Main Roads (QDMR) strategy for managing its infrastructure assets. The risk-based approach has been used in many areas of infrastructure engineering. However, very limited information is reported on using risk-based approach to mitigate crash rates related to road surface. Low skid resistance and surface texture may increase the risk of traffic crashes.----- ----- The objectives of this paper are to explore current issues of skid resistance in relation to crashes, to provide a framework of probability-based approach to be adopted by QDMR in assessing the relationship between crash accidents and pavement properties, and to explain why the probability-based approach is a suitable tool for QDMR in order to reduce accident rates due to skid resistance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Well, it has been Clem 7 month here in Brisbane and my impression is “so far, so good!” For those of you who know Brisbane, the four lane twin Clem Jones Tunnel (M7) is approximately 4.5km long, and connects Ipswich Road (A7) at the Princess Alexandra Hospital on the south side with Bowen Bridge Road (A3) at the Royal Brisbane Hospital on the north side. There are also south access ramps to the Pacific Motorway and east access ramps to Shafston Avenue (headed to/from Wynnum). Brisbanites have been enjoying a three week no-toll taste test, and I paced through it one evening with minimal fuss. The tunnel seems to have eased the congestion at the Stanley Street on-ramp to the Pacific Motorway quite a bit, and Ipswich Road – Main Street through the ‘Gabba. One must watch the signage carefully, but once we get used to the infrastructure, this will not likely be problematic. It will be interesting to see how traffic behaves when the system settles after tolling, which has likely commenced by the time you’re reading. I believe a passenger car toll is about $4.20 one way but saves about 24 signalised intersection pass-throughs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Freeways are divided roadways designed to facilitate the uninterrupted movement of motor vehicles. However, many freeways now experience demand flows in excess of capacity, leading to recurrent congestion. The Highway Capacity Manual (TRB, 1994) uses empirical macroscopic relationships between speed, flow and density to quantify freeway operations and performance. Capacity may be predicted as the maximum uncongested flow achievable. Although they are effective tools for design and analysis, macroscopic models lack an understanding of the nature of processes taking place in the system. Szwed and Smith (1972, 1974) and Makigami and Matsuo (1990) have shown that microscopic modelling is also applicable to freeway operations. Such models facilitate an understanding of the processes whilst providing for the assessment of performance, through measures of capacity and delay. However, these models are limited to only a few circumstances. The aim of this study was to produce more comprehensive and practical microscopic models. These models were required to accurately portray the mechanisms of freeway operations at the specific locations under consideration. The models needed to be able to be calibrated using data acquired at these locations. The output of the models needed to be able to be validated with data acquired at these sites. Therefore, the outputs should be truly descriptive of the performance of the facility. A theoretical basis needed to underlie the form of these models, rather than empiricism, which is the case for the macroscopic models currently used. And the models needed to be adaptable to variable operating conditions, so that they may be applied, where possible, to other similar systems and facilities. It was not possible to produce a stand-alone model which is applicable to all facilities and locations, in this single study, however the scene has been set for the application of the models to a much broader range of operating conditions. Opportunities for further development of the models were identified, and procedures provided for the calibration and validation of the models to a wide range of conditions. The models developed, do however, have limitations in their applicability. Only uncongested operations were studied and represented. Driver behaviour in Brisbane was applied to the models. Different mechanisms are likely in other locations due to variability in road rules and driving cultures. Not all manoeuvres evident were modelled. Some unusual manoeuvres were considered unwarranted to model. However the models developed contain the principal processes of freeway operations, merging and lane changing. Gap acceptance theory was applied to these critical operations to assess freeway performance. Gap acceptance theory was found to be applicable to merging, however the major stream, the kerb lane traffic, exercises only a limited priority over the minor stream, the on-ramp traffic. Theory was established to account for this activity. Kerb lane drivers were also found to change to the median lane where possible, to assist coincident mergers. The net limited priority model accounts for this by predicting a reduced major stream flow rate, which excludes lane changers. Cowan's M3 model as calibrated for both streams. On-ramp and total upstream flow are required as input. Relationships between proportion of headways greater than 1 s and flow differed for on-ramps where traffic leaves signalised intersections and unsignalised intersections. Constant departure onramp metering was also modelled. Minimum follow-on times of 1 to 1.2 s were calibrated. Critical gaps were shown to lie between the minimum follow-on time, and the sum of the minimum follow-on time and the 1 s minimum headway. Limited priority capacity and other boundary relationships were established by Troutbeck (1995). The minimum average minor stream delay and corresponding proportion of drivers delayed were quantified theoretically in this study. A simulation model was constructed to predict intermediate minor and major stream delays across all minor and major stream flows. Pseudo-empirical relationships were established to predict average delays. Major stream average delays are limited to 0.5 s, insignificant compared with minor stream delay, which reach infinity at capacity. Minor stream delays were shown to be less when unsignalised intersections are located upstream of on-ramps than signalised intersections, and less still when ramp metering is installed. Smaller delays correspond to improved merge area performance. A more tangible performance measure, the distribution of distances required to merge, was established by including design speeds. This distribution can be measured to validate the model. Merging probabilities can be predicted for given taper lengths, a most useful performance measure. This model was also shown to be applicable to lane changing. Tolerable limits to merging probabilities require calibration. From these, practical capacities can be estimated. Further calibration is required of traffic inputs, critical gap and minimum follow-on time, for both merging and lane changing. A general relationship to predict proportion of drivers delayed requires development. These models can then be used to complement existing macroscopic models to assess performance, and provide further insight into the nature of operations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background The genus Rattus is highly speciose and has a complex taxonomy that is not fully resolved. As shown previously there are two major groups within the genus, an Asian and an Australo-Papuan group. This study focuses on the Australo-Papuan group and particularly on the Australian rats. There are uncertainties regarding the number of species within the group and the relationships among them. We analysed 16 mitochondrial genomes, including seven novel genomes from six species, to help elucidate the evolutionary history of the Australian rats. We also demonstrate, from a larger dataset, the usefulness of short regions of the mitochondrial genome in identifying these rats at the species level. Results Analyses of 16 mitochondrial genomes representing species sampled from Australo-Papuan and Asian clades of Rattus indicate divergence of these two groups ~2.7 million years ago (Mya). Subsequent diversification of at least 4 lineages within the Australo-Papuan clade was rapid and occurred over the period from ~ 0.9-1.7 Mya, a finding that explains the difficulty in resolving some relationships within this clade. Phylogenetic analyses of our 126 taxon, but shorter sequence (1952 nucleotides long), Rattus database generally give well supported species clades. Conclusions Our whole mitochondrial genome analyses are concordant with a taxonomic division that places the native Australian rats into the Rattus fuscipes species group. We suggest the following order of divergence of the Australian species. R. fuscipes is the oldest lineage among the Australian rats and is not part of a New Guinean radiation. R. lutreolus is also within this Australian clade and shallower than R. tunneyi while the R. sordidus group is the shallowest lineage in the clade. The divergences within the R. sordidus and R. leucopus lineages occurring about half a million years ago support the hypotheses of more recent interchanges of rats between Australia and New Guinea. While problematic for inference of deeper divergences, we report that the analysis of shorter mitochondrial sequences is very useful for species identification in rats.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Motorway off-ramps are a significant source of traffic congestion and collisions. Heavy diverging traffic to off-ramps slows down the mainline traffic speed. When the off-ramp queue spillbacks onto the mainline, it leads to a major breakdown of the motorway capacity and a significant threat to the traffic safety. This paper proposes using Variable Speed Limits (VSL) for protection of the motorway off-ramp queue and thus to promote safety in congested diverging areas. To support timely activation of VSL in advance of queue spillover, a proactive control strategy is proposed based on a real-time off-ramp queue estimation and prediction. This process determines the estimated queue size in the near-term future, on which the decision to change speed limits is made. VSL can effectively slow down traffic as it is mandatory that drivers follow the changed speed limits. A collateral benefit of VSL is its potential effect on drivers making them more attentive to the surrounding traffic conditions, and prepared for a sudden braking of the leading car. This paper analyses and quantifies these impacts and potential benefits of VSL on traffic safety and efficiency using the microsimulation approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: The growing proportion of older adults in Australia is predicted to comprise 23% of the population by 2030. Accordingly, an increasing number of older drivers and fatal crashes of these drivers could also be expected. While the cognitive and physiological limitations of ageing and their road safety implications have been widely documented, research has generally considered older drivers as a homogeneous group. Knowledge of age-related crash trends within the older driver group itself is currently limited. Objective: The aim of this research was to identify age-related differences in serious road crashes of older drivers. This was achieved by comparing crash characteristics between older and younger drivers and between sub-groups of older drivers. Particular attention was paid to serious crashes (crashes resulting in hospitalisation and fatalities) as they place the greatest burden on the Australian health system. Method: Using Queensland Crash data, a total of 191,709 crashes of all-aged drivers (17–80+) over a 9-year period were analysed. Crash patterns of drivers’ aged 17–24, 25–39, 40–49, 50–59, 60–69, 70–79 and 80+ were compared in terms of crash severity (e.g., fatal), at fault levels, traffic control measures (e.g., stop signs) and road features (e.g., intersections). Crashes of older driver sub-groups (60–69, 70–79, 80+) were also compared to those of middle-aged drivers (40–49 and 50–59 combined, who were identified as the safest driving cohort) with respect to crash-related traffic control features and other factors (e.g., speed). Confounding factors including speed and crash nature (e.g., sideswipe) were controlled for. Results and discussion: Results indicated that patterns of serious crashes, as a function of crash severity, at-fault levels, road conditions and traffic control measures, differed significantly between age groups. As a group, older drivers (60+) represented the greatest proportion of crashes resulting in fatalities and hospitalisation, as well as those involving uncontrolled intersections and failure to give way. The opposite was found for middle-aged drivers, although they had the highest proportion of alcohol and speed-related crashes when compared to older drivers. Among all older drivers, those aged 60–69 were least likely to be involved in or the cause of crashes, but most likely to crash at interchanges and as a result of driving while fatigued or after consuming alcohol. Drivers aged 70–79 represented a mid-range level of crash involvement and culpability, and were most likely to crash at stop and give way signs. Drivers aged 80 years and beyond were most likely to be seriously injured or killed in, and at-fault for, crashes, and had the greatest number of crashes at both conventional and circular intersections. Overall, our findings highlight the heterogeneity of older drivers’ crash patterns and suggest that age-related differences must be considered in measures designed to improve older driver safety.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The South East Busway (SEB) of Brisbane’s busway network is one of the main facilities which provide access to commuters from South East (SE) Brisbane. SEB gives better satisfaction for passengers as far as reliability is considered. The operation procedure of SEB is complex due to its stations, ramps/intersections, bus equipment characteristics, bus service patterns and fare collection method. However, a comprehensive document of SEB is scarce as far as its overall performance is concerned. Therefore this report demonstrates a comprehensive and very strong appreciation of the overall operational processes of the world’s most sophisticated busway.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ramp signalling is an access control for motorways, in which a traffic signal is placed at on-ramps to regulate the rate of vehicles entering the motorway and thus to preserve the motorway capacity. In general, ramp signalling algorithms fall into two categories: local control and coordinated control by their effective scope. Coordinated ramp signalling strategies make use of measurements from the entire motorway network to operate individual ramp signals for the optimal performances at the network level. This study proposes a multi-hierarchical strategy for coordinated ramp signalling. The strategy is structured in two layers. At the higher layer with a longer update interval, coordination group is assembled and disassembled based on the location of high-risk breakdown flow. At the lower layer with a shorter update interval, individual ramps are hired to serve the coordination and are also released based on the prevailing congestion level on the ramp. This strategy is modelled and applied to the northbound Pacific Motorway micro-simulation platform (AIMSUN). The simulation results show an effective congestion mitigation of the proposed strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Work zone safety studies have traditionally relied on historical crash records—an approach which is reactive in nature as it requires crashes to accumulate first before taking any preventive actions. However, detailed and accurate data on work zone crashes are often not available, as is the case for Australian road work zones. The lack of reliable safety records and the reactive nature of the crash-based safety analysis approach motivated this research to seek alternative and proactive measures of safety. Various surrogate measures of safety have been developed in the traffic safety literature including time to collision, time to accident, gap time, post encroachment time, required deceleration rate, proportion of stopping distances, lateral distance to departure, and time to departure. These measures express how close road-user(s) are from a potential crash by analysing their movement trajectories. A review of this fast-growing literature is presented in this paper from the viewpoint of applying the measures to untangle work zone safety issues. The review revealed that the use of the surrogate measures is very limited for analysing work zone safety, although numerous studies have used these measures for analysing safety in other parts of the road network, such as intersections and motorway ramps. There exist great opportunities for adopting this proactive safety assessment approach to transform work zone safety for both roadworkers and motorists.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Based on trial interchanges, this paper develops three algorithms for the solution of the placement problem of logic modules in a circuit. A significant decrease in the computation time of such placement algorithms can be achieved by restricting the trial interchanges to only a subset of all the modules in a circuit. The three algorithms are simulated on a DEC 1090 system in Pascal and the performance of these algorithms in terms of total wirelength and computation time is compared with the results obtained by Steinberg, for the 34-module backboard wiring problem. Performance analysis of the first two algorithms reveals that algorithms based on pairwise trial interchanges (2 interchanges) achieve a desired placement faster than the algorithms based on trial N interchanges. The first two algorithms do not perform better than Steinberg's algorithm1, whereas the third algorithm based on trial pairwise interchange among unconnected pairs of modules (UPM) and connected pairs of modules (CPM) performs better than Steinberg's algorithm, both in terms of total wirelength (TWL) and computation time.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The study explores the relationship between open space design, factors impacting open space provision, and resident satisfaction with open space in multistorey apartment buildings in the context of the subtropical lifestyle and climate of Brisbane Australia. The purpose of the paper is to identify the specific physical and spatial design characteristics residents perceive to be important in open spaces associated with their private dwellings and with shared open spaces. Firsthand resident evaluations of everyday experiences of residing in inner urban high density environments are explored through a survey of 636 residents and interviews with 24 residents. Private balconies are highly valued, but residents’ satisfaction would be enhanced by spaciousness for diverse activities, privacy and climate responsive design. Communal spaces and facilities are used infrequently by many residents who prefer interactions with community outside of the building. This is related to preferences for a level of anonymity in a setting where privacy is difficult to achieve due to physical proximity of neighbours.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ramp metering (RM) is an access control for motorways, in which a traffic signal is placed at on-ramps to regulate the rate of vehicles entering the motorway and thus to preserve the motorway capacity. In general, RM algorithms fall into two categories by their effective scope: local control and coordinated control. Local control algorithm determines the metering rate based on the traffic condition on adjacent motorway mainline and the on-ramp. Conversely, coordinated RM strategies make use of measurements from the entire motorway network to operate individual ramp signals for optimal performance at the network level. This study proposes a multi-hierarchical strategy for on-ramp coordination. The strategy is structured in two layers. At the higher layer, a centralised, predictive controller plans the coordination control within a long update interval based on the location of high-risk breakdown flow. At the lower layer, reactive controllers determine the metering rates of those ramps involved in the ramp coordination with a short update interval. This strategy is modelled and applied to the northbound model of the Pacific Motorway in a micro-simulation platform (AIMSUN). The simulation results show that the proposed strategy effectively delays the onset of congestion and reduces total congestion with better managed on-ramp queues.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The π-electronic excitations and excited-state geometries of trans-stilbene (tS) are found by combining exact solutions of the Pariser-Parr-Pople (PPP) model and semiempirical Parametric Method 3 (PM3) calculations. Comprehensive comparisons with tS spectra are obtained and related to the fluorescence and topological alternation of poly(paraphenylenevinylene) (PPV). The one-photon absorption and triplet of tS correspond, respectively, to singlet and triplet bipolarons confined to two phenyls, while the tS2- ground state is a confined charged bipolaron. Independent estimates of the relaxation energy between vertical and adiabatic excitation show the bipolaron binding energy to depend on both charge and spin, as expected for interacting π electrons in correlated or molecular states. Complete configuration interaction within the PPP model of tS accounts for the singlet-triplet gap, for the fine-structure constants and triplet-triplet spectra, for two-photon transitions and intensities, and for one-photon spectra and the radiative lifetime, although the relative position of nearly degenerate covalent and ionic singlets is not resolved. The planar PM3 geometry and low rotational barrier of tS agree with resolved rotational and vibrational spectra in molecular beams. PM3 excitation and relaxation energies for tS bipolarons are consistent with experiment and with PPP results. Instead of the exciton model, we interpret tS excitations in terms of states that are localized on each ring or extended over an alternating chain, as found exactly in Hückel theory, and find nearly degenerate transitions between extended and localized states in the singlet, triplet, and dianion manifolds. The large topological alternation of the extended system increases the ionicity and interchanges the order of the lowest one- and two-photon absorption of PPV relative to polyenes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The similar to 2500 km-long Himalaya plate boundary experienced three great earthquakes during the past century, but none of them generated any surface rupture. The segments between the 1905-1934 and the 1897-1950 sources, known as the central and Assam seismic gaps respectively, have long been considered holding potential for future great earthquakes. This paper addresses two issues concerning earthquakes along the Himalaya plate boundary. One, the absence of surface rupture associated with the great earthquakes, vis-a-vis the purported large slip observed from paleoseismological investigations and two, the current understanding of the status of the seismic gaps in the Central Himalaya and Assam, in view of the paleoseismological and historical data being gathered. We suggest that the ruptures of earthquakes nucleating on the basal detachment are likely to be restricted by the crustal ramps and thus generate no surface ruptures, whereas those originating on the faults within the wedges promote upward propagation of rupture and displacement, as observed during the 2005 Kashmir earthquake, that showed a peak offset of 7 m. The occasional reactivation of these thrust systems within the duplex zone may also be responsible for the observed temporal and spatial clustering of earthquakes in the Himalaya. Observations presented in this paper suggest that the last major earthquake in the Central Himalaya occurred during AD 1119-1292, rather than in 1505, as suggested in some previous studies and thus the gap in the plate boundary events is real. As for the Northwestern Himalaya, seismically generated sedimentary features identified in the 1950 source region are generally younger than AD 1400 and evidence for older events is sketchy. The 1897 Shillong earthquake is not a decollement event and its predecessor is probably similar to 1000 years old. Compared to the Central Himalaya, the Assam Gap is a corridor of low seismicity between two tectonically independent seismogenic source zones that cannot be considered as a seismic gap in the conventional sense. (C) 2011 Elsevier B.V. All rights reserved.