954 resultados para Operations performance


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a practical framework to synthesize multi-sensor navigation information for localization of a rotary-wing unmanned aerial vehicle (RUAV) and estimation of unknown ship positions when the RUAV approaches the landing deck. The estimation performance of the visual tracking sensor can also be improved through integrated navigation. Three different sensors (inertial navigation, Global Positioning System, and visual tracking sensor) are utilized complementarily to perform the navigation tasks for the purpose of an automatic landing. An extended Kalman filter (EKF) is developed to fuse data from various navigation sensors to provide the reliable navigation information. The performance of the fusion algorithm has been evaluated using real ship motion data. Simulation results suggest that the proposed method can be used to construct a practical navigation system for a UAV-ship landing system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The main aim of this thesis is to analyse and optimise a public hospital Emergency Department. The Emergency Department (ED) is a complex system with limited resources and a high demand for these resources. Adding to the complexity is the stochastic nature of almost every element and characteristic in the ED. The interaction with other functional areas also complicates the system as these areas have a huge impact on the ED and the ED is powerless to change them. Therefore it is imperative that OR be applied to the ED to improve the performance within the constraints of the system. The main characteristics of the system to optimise included tardiness, adherence to waiting time targets, access block and length of stay. A validated and verified simulation model was built to model the real life system. This enabled detailed analysis of resources and flow without disruption to the actual ED. A wide range of different policies for the ED and a variety of resources were able to be investigated. Of particular interest was the number and type of beds in the ED and also the shift times of physicians. One point worth noting was that neither of these resources work in isolation and for optimisation of the system both resources need to be investigated in tandem. The ED was likened to a flow shop scheduling problem with the patients and beds being synonymous with the jobs and machines typically found in manufacturing problems. This enabled an analytic scheduling approach. Constructive heuristics were developed to reactively schedule the system in real time and these were able to improve the performance of the system. Metaheuristics that optimised the system were also developed and analysed. An innovative hybrid Simulated Annealing and Tabu Search algorithm was developed that out-performed both simulated annealing and tabu search algorithms by combining some of their features. The new algorithm achieves a more optimal solution and does so in a shorter time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There has been much written about the Internet’s potential to enhance international market growth opportunities for SME’s. However, the literature is vague as to how Internet usage and the application of Internet marketing also known as Internet marketing intensity has an impact on firm international market growth. This paper examines the level and role of the Internet in the international operations of a sample of 218 Australian SMEs with international customers. This study shows evidence of a statistical relationship between Internet usage and Internet marketing intensity, which in turn leads to international market growth, in terms of increased sales from new customers in new countries, new customers in existing countries and from existing customers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A hospital consists of a number of wards, units and departments that provide a variety of medical services and interact on a day-to-day basis. Nearly every department within a hospital schedules patients for the operating theatre (OT) and most wards receive patients from the OT following post-operative recovery. Because of the interrelationships between units, disruptions and cancellations within the OT can have a flow-on effect to the rest of the hospital. This often results in dissatisfied patients, nurses and doctors, escalating waiting lists, inefficient resource usage and undesirable waiting times. The objective of this study is to use Operational Research methodologies to enhance the performance of the operating theatre by improving elective patient planning using robust scheduling and improving the overall responsiveness to emergency patients by solving the disruption management and rescheduling problem. OT scheduling considers two types of patients: elective and emergency. Elective patients are selected from a waiting list and scheduled in advance based on resource availability and a set of objectives. This type of scheduling is referred to as ‘offline scheduling’. Disruptions to this schedule can occur for various reasons including variations in length of treatment, equipment restrictions or breakdown, unforeseen delays and the arrival of emergency patients, which may compete for resources. Emergency patients consist of acute patients requiring surgical intervention or in-patients whose conditions have deteriorated. These may or may not be urgent and are triaged accordingly. Most hospitals reserve theatres for emergency cases, but when these or other resources are unavailable, disruptions to the elective schedule result, such as delays in surgery start time, elective surgery cancellations or transfers to another institution. Scheduling of emergency patients and the handling of schedule disruptions is an ‘online’ process typically handled by OT staff. This means that decisions are made ‘on the spot’ in a ‘real-time’ environment. There are three key stages to this study: (1) Analyse the performance of the operating theatre department using simulation. Simulation is used as a decision support tool and involves changing system parameters and elective scheduling policies and observing the effect on the system’s performance measures; (2) Improve viability of elective schedules making offline schedules more robust to differences between expected treatment times and actual treatment times, using robust scheduling techniques. This will improve the access to care and the responsiveness to emergency patients; (3) Address the disruption management and rescheduling problem (which incorporates emergency arrivals) using innovative robust reactive scheduling techniques. The robust schedule will form the baseline schedule for the online robust reactive scheduling model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increasing global competitiveness worldwide has forced manufacturing organizations to produce high-quality products more quickly and at a competitive cost which demand of continuous improvements techniques. In this paper, we propose a fuzzy based performance evaluation method for lean supply chain. To understand the overall performance of cost competitive supply chain, we investigate the alignment of market strategy and position of the supply chain. Competitive strategies can be achieved by using a different weight calculation for different supply chain situations. By identifying optimal performance metrics and applying performance evaluation methods, managers can predict the overall supply chain performance under lean strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, railway systems play a vital role in transporting the sugarcane crop from farms to mills. The sugarcane transport system is very complex and uses daily schedules, consisting of a set of locomotives runs, to satisfy the requirements of the mill and harvesters. The total cost of sugarcane transport operations is very high; over 35% of the total cost of sugarcane production in Australia is incurred in cane transport. Efficient schedules for sugarcane transport can reduce the cost and limit the negative effects that this system can have on the raw sugar production system. There are several benefits to formulating the train scheduling problem as a blocking parallel-machine job shop scheduling (BPMJSS) problem, namely to prevent two trains passing in one section at the same time; to keep the train activities (operations) in sequence during each run (trip) by applying precedence constraints; to pass the trains on one section in the correct order (priorities of passing trains) by applying disjunctive constraints; and, to ease passing trains by solving rail conflicts by applying blocking constraints and Parallel Machine Scheduling. Therefore, the sugarcane rail operations are formulated as BPMJSS problem. A mixed integer programming and constraint programming approaches are used to describe the BPMJSS problem. The model is solved by the integration of constraint programming, mixed integer programming and search techniques. The optimality performance is tested by Optimization Programming Language (OPL) and CPLEX software on small and large size instances based on specific criteria. A real life problem is used to verify and validate the approach. Constructive heuristics and new metaheuristics including simulated annealing and tabu search are proposed to solve this complex and NP-hard scheduling problem and produce a more efficient scheduling system. Innovative hybrid and hyper metaheuristic techniques are developed and coded using C# language to improve the solutions quality and CPU time. Hybrid techniques depend on integrating heuristic and metaheuristic techniques consecutively, while hyper techniques are the complete integration between different metaheuristic techniques, heuristic techniques, or both.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many computationally intensive scientific applications involve repetitive floating point operations other than addition and multiplication which may present a significant performance bottleneck due to the relatively large latency or low throughput involved in executing such arithmetic primitives on commod- ity processors. A promising alternative is to execute such primitives on Field Programmable Gate Array (FPGA) hardware acting as an application-specific custom co-processor in a high performance reconfig- urable computing platform. The use of FPGAs can provide advantages such as fine-grain parallelism but issues relating to code development in a hardware description language and efficient data transfer to and from the FPGA chip can present significant application development challenges. In this paper, we discuss our practical experiences in developing a selection of floating point hardware designs to be implemented using FPGAs. Our designs include some basic mathemati cal library functions which can be implemented for user defined precisions suitable for novel applications requiring non-standard floating point represen- tation. We discuss the details of our designs along with results from performance and accuracy analysis tests.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The R statistical environment and language has demonstrated particular strengths for interactive development of statistical algorithms, as well as data modelling and visualisation. Its current implementation has an interpreter at its core which may result in a performance penalty in comparison to directly executing user algorithms in the native machine code of the host CPU. In contrast, the C++ language has no built-in visualisation capabilities, handling of linear algebra or even basic statistical algorithms; however, user programs are converted to high-performance machine code, ahead of execution. A new method avoids possible speed penalties in R by using the Rcpp extension package in conjunction with the Armadillo C++ matrix library. In addition to the inherent performance advantages of compiled code, Armadillo provides an easy-to-use template-based meta-programming framework, allowing the automatic pooling of several linear algebra operations into one, which in turn can lead to further speedups. With the aid of Rcpp and Armadillo, conversion of linear algebra centered algorithms from R to C++ becomes straightforward. The algorithms retains the overall structure as well as readability, all while maintaining a bidirectional link with the host R environment. Empirical timing comparisons of R and C++ implementations of a Kalman filtering algorithm indicate a speedup of several orders of magnitude.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Integrated supplier management (ISM), new product development (NPD) and knowledge sharing (KS) practices are three primary business activities utilised to enhance manufacturers' business performance (BP). The purpose of this paper is to empirically investigate the relationships between these three business activities (i.e. ISM, NPD, KS) and BP in a Taiwanese electronics manufacturing context. Design/methodology/approach – A questionnaire survey is first administered to a sample of electronic manufacturing companies operating in Taiwan to elicit the opinions of technical and managerial professionals regarding business activities and BP within their companies. A total of 170 respondents from 83 companies respond to the survey. Factor, correlation and path analysis are undertaken on this quantitative data set to derive the key factors which leverage business outcomes in these companies. Following empirical analysis, six semi-structured interviews are undertaken with manufacturing executives to provide qualitative insights into the underlying reasons why certain business activity factors are the strongest predictors of BP. Findings – The investigation shows that the ISM, NPD and KS constructs all play an important role in the success of company operations and creating business outcomes. Specifically, the key factors within these constructs which influenced BP are: supplier evaluation and selection; design simplification and modular design; information technology infrastructure and systems and open communication. Accordingly, sufficient financial and human resources should be allocated to these important activities to derive accelerated rates of improved BP. These findings are supported by the qualitative interviews with manufacturing executives. Originality/value – The paper depicts the pathways to improved manufacturing BP, through targeting efforts into the above-mentioned factors within the ISM, NPD and KS constructs. Based on the empirical path model, and the specific insights derived from the explanatory interviews with manufacturing executives, the paper also provides a number of practical implications for manufacturing companies seeking to enhance their BP through improved operational activities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Within the context of high global competitiveness, knowledge management (KM) has proven to be one of the major factors contributing to enhanced business outcomes. Furthermore, knowledge sharing (KS) is one of the most critical of all KM activities. From a manufacturing industry perspective, supply chain management (SCM) and product development process (PDP) activities, require a high proportion of company resources such as budget and manpower. Therefore, manufacturing companies are striving to strengthen SCM, PDP and KS activities in order to accelerate rates of manufacturing process improvement, ultimately resulting in higher levels of business performance (BP). A theoretical framework along with a number of hypotheses are proposed and empirically tested through correlation, factor and path analyses. Design/methodology/approach: A questionnaire survey was administered to a sample of electronic manufacturing companies operating in Taiwan to facilitate testing the proposed relationships. More than 170 respondents from 83 organisations responded to the survey. The study identified top management commitment and employee empowerment, supplier evaluation and selection, and design simplification and modular design as the key business activities that are strongly associated with the business performance. Findings: The empirical study supports that key manufacturing business activities (i.e., SCM, PDP, and KS) are positively associated with BP. The findings also evealed that some specific business activities such as SCMF1,PDPF2, and KSF1 have the strongest influencing power on particular business outcomes (i.e., BPF1 and BPF2) within the context of electronic manufacturing companies operating in Taiwan. Practical implications: The finding regarding the relationship between SCM and BP identified the essential role of supplier evaluation and selection in improving business competitiveness and long term performance. The process of forming knowledge in companies, such as creation, storage/retrieval, and transfer do not necessarily lead to enhanced business performance; only through effectively applying knowledge to the right person at the right time does. Originality/value: Based on this finding it is recommended that companies should involve suppliers in partnerships to continuously improve operations and enhance product design efforts, which would ultimately enhance business performance. Business performance depends more on an employee’s ability to turn knowledge into effective action.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Manufacturing companies have strived to enhance managerial and technical capabilities to improve business performance. Building these capabilities requires effective share of knowledge - the strategic resource. Specifically, knowledge sharing (KS) between different manufacturing departments can improve manufacturing processes since leveraging organisational knowledge plays an enssential role in achieving competitive advantage. This paper presents an empirical investigation into the impact of KS on the effectiveness of supply chain management (SCM) and the product development process (PDP) in achieving desired business performance (BP). A questionnaire survey was administered from electronic manufacturing companies operating in Taiwan. 168 valid responses were received and used to statistically examine the relationships between the concepts (SCM, PDP, KS, BP). The study findings reveal that within the Taiwanese electronic manufacturing companies KS is an essential enabler for facilitating the effectiveness of SCM and PDP in achieving desired BP.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work, we investigate how hydrogen sensing performance of thermally evaporated MoO3 nanoplatelets can be further improved by RF sputtering a thin layer of tantalum oxide (Ta2O5) or lanthanum oxide (La2O3). We show that dissociated hydrogen atoms cause the thin film layer to be polarised, inducing a measurable potential difference greater than that as reported previously. We attribute these observations to the presence of numerous traps in the thin layer; their states allow a stronger trapping of charge at the Pt-thin film oxide interface as compared to the MoO3 sensors without the coating. Under exposure to H2 (10 000 ppm) the maximum change in dielectric constant of 45.6 (at 260 °C) for the Ta2O5/MoO3 nanoplatelets and 31.6 (at 220 °C) for La2O3/MoO3 nanoplatelets. Subsequently, the maximum sensitivity for the Ta2O5/MoO3 is 16.87 (at 260 °C) and La2O3/MoO3 is 7.52 (at 300 °C).