1000 resultados para MPLS standard


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision of Dalton J in Lai v Soineva [2011] QSC 247 has resulted in a change in the latest versions of the Real Estate Institute of Queensland (REIQ) contracts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There have been numerous calls over the years for the development of an accounting standard for not-for-profit entities (NFPEs). Probably the most commonly quoted in this regard is that from the Industry Commission Report No. 45 in 1995 which contained the following recommendation: The Commonwealth government should provide funds to the Australian Accounting Standards Board and the Public Sector Accounting Standards Board to develop within two years suitable accounting standards for Community Social Welfare Organisations. This recommendation was made over 5-years ago. Why has no action been taken towards its implementation?...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Client puzzles are cryptographic problems that are neither easy nor hard to solve. Most puzzles are based on either number theoretic or hash inversions problems. Hash-based puzzles are very efficient but so far have been shown secure only in the random oracle model; number theoretic puzzles, while secure in the standard model, tend to be inefficient. In this paper, we solve the problem of constucting cryptographic puzzles that are secure int he standard model and are very efficient. We present an efficient number theoretic puzzle that satisfies the puzzle security definition of Chen et al. (ASIACRYPT 2009). To prove the security of our puzzle, we introduce a new variant of the interval discrete logarithm assumption which may be of independent interest, and show this new problem to be hard under reasonable assumptions. Our experimental results show that, for 512-bit modulus, the solution verification time of our proposed puzzle can be up to 50x and 89x faster than the Karame-Capkum puzzle and the Rivest et al.'s time-lock puzzle respectively. In particular, the solution verification tiem of our puzzle is only 1.4x slower than that of Chen et al.'s efficient hash based puzzle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The judgement in Hennessey Glass and Aluminium Pty Ltd v Watpac Australia Pty Ltd [2007] QDC 57 McGill DCJ provides valuable guidance for practitioners as to whether a range of particular costs items should be permitted on an assessment on the standard basis, and the amounts which should be allowed for such items. The items in issue included counsel’s fees and fees paid to expert witnesses. The decision also examined GST implications for the recovery of legal costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Light gauge cold-formed steel frame (LSF) structures are increasingly used in industrial, commercial and residential buildings because of their non-combustibility, dimensional stability, and ease of installation. A floor-ceiling system is an example of its applications. LSF floor-ceiling systems must be designed to serve as fire compartment boundaries and provide adequate fire resistance. Fire rated floor-ceiling assemblies formed with new materials and construction methodologies have been increasingly used in buildings. However, limited research has been undertaken in the past and hence a thorough understanding of their fire resistance behaviour is not available. Recently a new composite panel in which an external insulation layer is used between two plasterboards has been developed at QUT to provide a higher fire rating to LSF floors under standard fire conditions. But its increased fire rating could not be determined using the currently available design methods. Research on LSF floor systems under fire conditions is relatively recent and the behaviour of floor joists and other components in the systems is not fully understood. The present design methods thus require the use of expensive fire protection materials to protect them from excessive heat increase during a fire. This leads to uneconomical and conservative designs. Fire rating of these floor systems is provided simply by adding more plasterboard sheets to the steel joists and such an approach is totally inefficient. Hence a detailed fire research study was undertaken into the structural and thermal performance of LSF floor systems including those protected by the new composite panel system using full scale fire tests and extensive numerical studies. Experimental study included both the conventional and the new steel floor-ceiling systems under structural and fire loads using a gas furnace designed to deliver heat in accordance with the standard time- temperature curve in AS 1530.4 (SA, 2005). Fire tests included the behavioural and deflection characteristics of LSF floor joists until failure as well as related time-temperature measurements across the section and along the length of all the specimens. Full scale fire tests have shown that the structural and thermal performance of externally insulated LSF floor system was superior than traditional LSF floors with or without cavity insulation. Therefore this research recommends the use of the new composite panel system for cold-formed LSF floor-ceiling systems. The numerical analyses of LSF floor joists were undertaken using the finite element program ABAQUS based on the measured time-temperature profiles obtained from fire tests under both steady state and transient state conditions. Mechanical properties at elevated temperatures were considered based on the equations proposed by Dolamune Kankanamge and Mahendran (2011). Finite element models were calibrated using the full scale test results and used to further provide a detailed understanding of the structural fire behaviour of the LSF floor-ceiling systems. The models also confirmed the superior performance of the new composite panel system. The validated model was then used in a detailed parametric study. Fire tests and the numerical studies showed that plasterboards provided sufficient lateral restraint to LSF floor joists until their failure. Hence only the section moment capacity of LSF floor joists subjected to local buckling effects was considered in this research. To predict the section moment capacity at elevated temperatures, the effective section modulus of joists at ambient temperature is generally considered adequate. However, this research has shown that it leads to considerable over- estimation of the local buckling capacity of joist subject to non-uniform temperature distributions under fire conditions. Therefore new simplified fire design rules were proposed for LSF floor joist to determine the section moment capacity at elevated temperature based on AS/NZS 4600 (SA, 2005), NAS (AISI, 2007) and Eurocode 3 Part 1.3 (ECS, 2006). The accuracy of the proposed fire design rules was verified with finite element analysis results. A spread sheet based design tool was also developed based on these design rules to predict the failure load ratio versus time, moment capacity versus time and temperature for various LSF floor configurations. Idealised time-temperature profiles of LSF floor joists were developed based on fire test measurements. They were used in the detailed parametric study to fully understand the structural and fire behaviour of LSF floor panels. Simple design rules were also proposed to predict both critical average joist temperatures and failure times (fire rating) of LSF floor systems with various floor configurations and structural parameters under any given load ratio. Findings from this research have led to a comprehensive understanding of the structural and fire behaviour of LSF floor systems including those protected by the new composite panel, and simple design methods. These design rules were proposed within the guidelines of the Australian/New Zealand, American and European cold- formed steel structures standard codes of practice. These may also lead to further improvements to fire resistance through suitable modifications to the current composite panel system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gypsum plasterboards are commonly used as a fire safety material in the building industry. Many research studies have been undertaken to investigate the thermal behaviour of plasterboards under standard fire conditions. However, there are many discrepancies in relation to the basic thermal properties of plasterboards while simple equations are not available to predict the ambient surface time–temperature profiles of gypsum plasterboard panels that can be used in simulating the behaviour and strength of steel studs or joists in load bearing LSF wall and floor systems. In this research, suitable thermal properties of plasterboards were proposed based on a series of tests and available results from past research. Finite element models of gypsum plasterboard panels were then developed to simulate their thermal behaviour under standard fire conditions. The accuracy of the proposed thermal properties and the finite element models was validated by comparing the numerical results with available fire test results of plasterboard panels. This paper presents the details of the finite element models of plasterboard panels, the thermal analysis results from finite element analyses under standard fire conditions and their comparisons with experimental results

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Triage has military origins, with the initial purpose being to direct care to those most likely to be able to return to the battlefield. Conversely, modern disaster triage attempts to ensure both the prioritisation of care for those who need it most and a fair distribution of resources, so that health responders are able to ‘do the most for the most’...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The standard Exeter stem has a length of 150mm with offsets 37.5mm to 56mm. Shorter stems of lengths 95mm, 115mm and 125mm with offsets 35.5mm or less are available for patients with smaller femurs. Concern has been raised regarding the behaviour of the smaller implants. This paper analysed data from the Australian Orthopaedic Association National Joint Replacement Registry comparing survivorship of stems of offset 35.5mm or less with the standard stems of 37.5mm offset or greater. At seven years there was no significant difference in the Cumulative Percent Revision Rate in the short stems (3.4%, 95% CI 2.4-4.8%) compared with the standard length stems (3.5%, 95% CI 3.3-3.8%) despite its use in a greater proportion of potentially more difficult developmental dysplasia of the hip cases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Teacher professional standards have become a key policy mechanism for the reform of teaching and education in recent years. While standards policies claim to improve the quality of teaching and learning in schools today, this paper argues that a disjunction exists between the stated intentions of such programmes and the intelligibility of the practices of government in which they are invested. To this effect, the paper conducts an analytics of government of the recently released National Professional Standards for Teachers (Australian Institute for Teaching and School Leadership, 2011) arguing that the explicit, calculated rationality of the programme exists within a wider field of effects. Such analysis has the critical consequence of calling into question the claims of the programmers themselves thus breaching the self-evidence on which the standards rest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: The high rates of comorbid depression and substance use in young people have been associated with a range of adverse outcomes. Yet, few treatment studies have been conducted with this population. Objective: To determine if the addition of Motivational Interviewing and Cognitive Behaviour Therapy (MI/CBT) to standard alcohol and other drug (AOD) care improves the outcomes of young people with comorbid depression and substance use. Participants and Setting: Participants comprised 88 young people with comorbid depression (Kessler 10 score of > 17) and substance use (mainly alcohol/cannabis) seeking treatment at two youth AOD services in Melbourne, Australia. Sixty young people received MI/CBT in addition to standard care (SC) and 28 received SC alone. Outcomes Measures: Primary outcome measures were depressive symptoms and drug and alcohol use in the past month. Assessments were conducted at baseline, 3 and 6 months follow up. Results and Conclusions: The addition of MI/CBT to SC was associated with a significantly greater rate of change in depression, cannabis use, motivation to change substance use and social contact in the first 3 months. However, those who received SC had achieved similar improvements on these variables by 6 months follow up. All young people achieved significant improvements in functioning and quality of life variables over time, regardless of the treatment group. No changes in alcohol or other drug use were found in either group. The delivery of MI/CBT in addition to standard AOD care may offer accelerated treatment gains in the short-term.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three dimensional conjugate heat transfer simulation of a standard parabolic trough thermal collector receiver is performed numerically in order to visualize and analyze the surface thermal characteristics. The computational model is developed in Ansys Fluent environment based on some simplified assumptions. Three test conditions are selected from the existing literature to verify the numerical model directly, and reasonably good agreement between the model and the test results confirms the reliability of the simulation. Solar radiation flux profile around the tube is also approximated from the literature. An in house macro is written to read the input solar flux as a heat flux wall boundary condition for the tube wall. The numerical results show that there is an abrupt variation in the resultant heat flux along the circumference of the receiver. Consequently, the temperature varies throughout the tube surface. The lower half of the horizontal receiver enjoys the maximum solar flux, and therefore, experiences the maximum temperature rise compared to the upper part with almost leveled temperature. Reasonable attributions and suggestions are made on this particular type of conjugate thermal system. The knowledge that gained so far from this study will be used to further the analysis and to design an efficient concentrator photovoltaic collector in near future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Due to the development of XML and other data models such as OWL and RDF, sharing data is an increasingly common task since these data models allow simple syntactic translation of data between applications. However, in order for data to be shared semantically, there must be a way to ensure that concepts are the same. One approach is to employ commonly usedschemas—called standard schemas —which help guarantee that syntactically identical objects have semantically similar meanings. As a result of the spread of data sharing, there has been widespread adoption of standard schemas in a broad range of disciplines and for a wide variety of applications within a very short period of time. However, standard schemas are still in their infancy and have not yet matured or been thoroughly evaluated. It is imperative that the data management research community takes a closer look at how well these standard schemas have fared in real-world applications to identify not only their advantages, but also the operational challenges that real users face. In this paper, we both examine the usability of standard schemas in a comparison that spans multiple disciplines, and describe our first step at resolving some of these issues in our Semantic Modeling System. We evaluate our Semantic Modeling System through a careful case study of the use of standard schemas in architecture, engineering, and construction, which we conducted with domain experts. We discuss how our Semantic Modeling System can help the broader problem and also discuss a number of challenges that still remain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.