984 resultados para Heterogeneous rock mass


Relevância:

80.00% 80.00%

Publicador:

Resumo:

位于茅坪滑坡体后缘的白岩危岩体于2002年8月24日发生了大规模的崩塌。崩落的块石落在滑坡体上,对滑坡体产生了加载作用,影响了该滑坡体的稳定性。为研究茅坪滑坡体的稳定性,有必要弄清滑坡体上崩落块石的堆积情况。论文在对清江隔河岩水库白岩危岩体崩塌现场调查的基础上,估算了崩塌岩体的体积,实地测量了岩体崩塌后堆积体表面块石的尺寸以及各块石空间位置坐标。对测量的结果进行了统计分析。根据所测量的块石尺寸、得到了崩落岩体的块体大小级配累积曲线图和各块石尺度出现的概率,从而阐明了各尺度崩落块石组合情况。根据各块石尺寸和各块石空间位置坐标、分析得到不同尺寸崩落块石落在滑坡体上的空间分布规律,从而为茅坪滑坡的进一步研究打下了基础。

Relevância:

80.00% 80.00%

Publicador:

Resumo:

选择了3种有代表性的岩体结构进行冲击试验,分析研究了波形最大峰值变化与岩体结构的关系.试验结果表明:震动峰值随空间衰减、震动峰值延时及其离散性变化均能有效反映岩体结构特点和受扰动程度,也能反映岩体的各向异性.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

把岩石抽象为Kelvin-Voigt黏弹性体, 应用复数理论建立了应力波在岩石中传播时的振动频率和波动频率的关系, 在此基础上, 研究了岩石和含有一组平行结构面的岩体中应力波幅值随时间和随空间衰减的关系. 研究表明, 应力波在岩石的传播过程中, 频率是影响应力波幅值衰减的的主要因素; 应力波在含有1组平行结构面岩体的传播过程中, 由于结构面的存在, 影响了应力波能量的传播, 其幅值随时空衰减系数主要由结构面间距及其反射系数决定, 结构面间距减小和反射系数增加, 幅值随传播距离的衰减系数增加和随时间的衰减系数减小, 而结构面的黏性系数增加, 幅值随传播距离的衰减系数增加, 但随时间的衰减系数变化很小. 上述结论对岩体结构探测具有重要的指导意义

Relevância:

80.00% 80.00%

Publicador:

Resumo:

工程开挖卸荷后岩体参数研究一直是工程界关注的焦点,是稳定性评价的基础性工作.本文以锦屏地下厂房开挖工程为背景,通过对上下游边墙不同桩号段开挖揭露的岩体进行工程地质岩组划分,进行了开挖后岩体质量评价并对其进行分类,通过在GSI(Geological Strength Index)评价体系中引入Jv(节理数/m3),使评价体系相对合理化,经回归分析,对不同风化程度的岩体进行了力学参数求解,发现内聚力及内摩擦角的计算值与建议值吻合较好

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dam is the key main works in the construction of water power. The success or failure of the construction of the dam mainly depends on the stability of the dam foundation. The double curvature arch dam-XiaoWan Dam is the highest one among the dams with the same type in the world, and the water thrust acted on it reaches ton, so the rock bearing capacity of dam foundation becomes more important. Because of the high and steep valley-side slope, the large scale of excavation and the complex body type of excavation, it is prominent that the problem of stress release of the rock mass in dam foundation. More great attentions should be paid for the stability and the degraded of rock properties of rock mass induced by the stress release. In this paper, the phenomena of stress release of rock mass in XiaoWan Dam foundation and its mechanisms were analyzed based on the collection of data, the detailed field engineering investigations, measurement of the rock mass and the 2D numerical calculations. The rock mass under the foundation is weak-weathered to intact, the quality of which is good. After excavation of the foundation, the rock mass near the slope surface occurred extend, stretch and stick-slip along original textures till the new fracture surface formed. Then platy structure of the rock mass takes on. The rock mass in the dam foundation occur resilience due to stress release towards free faces with the characteristics of time effect and localized deformation. In-situ measurements show that the rock mass near the surface are degraded. The stress release induced by excavation is a process of the interaction between engineering structures and geologic body. The stress release of rock mass in dam foundation is related to the changed degree of geometrical conditions. The rock near excavation surface failed nearly under uniaxial stresses. The bending-breaking mechanism of plate girder can interpret the failure model of the rock mass with platy structure in dam foundation slope. In essence, the stress release is the change of stress field including the change of directions and magnitudes of stress induced by excavation, which can induce the comedown of the safety margin. In this paper, the inducing conditions of stress release were calculated by numerical analyses. Moreover, from the point of view that the change of stress field, the coefficient of K, i.e. the variable load coefficient was proposed. Then the law of the change of it is interpreted. The distributional characteristics of fracture zone were expressed by the coefficient. The stress release of hard rock has the characteristic of localization. The measuring technique of sound wave can not reflect the small cracks in this kind of rock mass due to stress release. So, the spectral analysis method was proposed. At the same time, the application foreground in engineering of the Stockwell Time-Frequency- Spectrum method was discussed with a view to the limitation of it.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The anchorages are unparalleled structures only in a suspension bridge, and as main bearing facilities, play an important role in connecting the superstructures and the ground. The tunnel anchorage, as one alternative type of the anchorages, has more advantages over its counterpart, the gravity anchorage. With the tunnel anchorages adopted, not only can surface excavation be reduced to protect the environment, and natural condition of the rock be utilized and potential bearing capacity of surrounding rock be mobilized to save engineering cost, but also the technological predominance of auxiliary engineering measures, such as prestressed concrete, anchoring piles, rock anchors and collar beam between the two separated anchorages, can be easily cooperated to work together harmoniously under the circumstances of poor rock quality. There are plentiful high mountains and deep canyons in west part of China, and long-span bridge construction is inevitably encountered in order to realize leapfrogging development of the transportation infrastructure. Western mountainous areas usually possess the conditions for constructing tunnel anchorages, and therefore, the tunnel anchorages, which are conformed to the conception of resource conservative and sustainable society, extremely have application and popularization value in western underdeveloped region. The scientific and technological problem about the design, construction and operation of tunnel anchorages should be further investigated. Combining the engineering of western tunnel anchorages for the Balinghe Suspension Bridge, this paper probed into the survey method and in-situ test method for tunnel anchorages, scientific rock quality evaluation of surrounding rock to provide reasonable physical and mechanical parameters for design, construction and operation of tunnel anchorages, bearing capacity estimation for tunnel anchorage, deformation prediction of the anchorage-rockmass system, tunnel-anchorage slope stability analysis and the evaluation of excavation stability and degree of safety of the anchorage tunnel. The following outcomes were obtained: 1. Materials of tunnel anchorages of suspension bridge built (and in progress) at home and abroad were systematically sorted out, with the engineering geological condition and geomechanical property of surrounding rock around the anchorage tunnel, the design size of anchorages and the construction method of anchorage tunnel paid more emphasis on, to unveil the internal relationship between the engineering geological conditions of surrounding rock and the design size and axis angle of anchorages and provide references for future design, construction and study of tunnel anchorages. 2. Physical and mechanical parameters were recommended based on three domestic and foreign methods of rock quality evaluation. 3. In-situ tests, adopting the back-thrust method, of two kinds of reduced scale model, 1/30 and 1/20, for the tunnel anchorages were conducted in the declining exploration drift with rock mass at the test depth being the same as surrounding rock around real anchorages, and reliable field rockmass displacement data were acquired. Attenuation relation between the increment of distance from the anchorage and the decrement of rockmass displacement under maximum test load, and influential scope suffered by anchorage load were obtained. 4. Using similarity theory, the magnitude of real anchorage and rockmass displacement under design load and degree of safety of the anchorage system were deduced. Furthermore, inversion analysis to deformation modulus of slightly weathered dolomite rock, the surrounding rock of anchorage tunnel, was performed by the means of numerical simulation. 5. The influential law of the geometrical size to the limit bearing capacity of tunnel anchorage was studied. 6. Based on engineering geological survey data, accounting for the combination of strata layer and adverse discontinuities, the failure patterns of tunnel anchorage slope were divided into three modes: sliding of splay saddle pier slope, superficial-layer slippage, and deep-layer slippage. Using virtual work principle and taking anchorage load in account, the stability of the three kinds of failure patterns were analyzed in detail. 7. The step-by-step excavation of anchorage tunnel, the numerical overload and the staged decrement of rock strength parameters were numerically simulated to evaluate the excavation stability of surrounding rock around anchorage tunnel, the overload performance of tunnel anchorage, and the safety margin of strength parameters of the surrounding rock.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The two major issues in mining industry are work safety and protection of ground environment when carrying on underground mining activities. Cut-and-fill mining method is increasingly applied in China owing to its advantages of controlling ground pressure and protecting the ground environment effectively. However, some cut-and-fill mines such as Jinchuan nickel mine which has big ore body, broken rock mass and high geostress have unique characteristics on the law of ground pressure and rock mass movement that distinguish from other mining methods. There are still many problems unknown and it is necessary for the further analysis. In this dissertation, vast field survey, geology trenching and relative data analysis are carried out. The distribution of ground fissures and the correlation of the fissures with the location of underground ore body is presented. Using of monitoring data by three-dimension fissure meter and GPS in Jinchuan Deposit Ⅱ, the rule of the surface deformation and the reason of ground fissures generation are analyzed. It is shown that the stress redistribution in surrounding rocks resulting from mining, the existence of the void space underground and the influence of on-going mining activities are three main reasons for the occurrence of ground fissures. Based on actual section planes of No.1 ore body, a large-scale 3D model is established. By this model, the complete process of excavation and filling is simulated and the law of rock mass movement and stability caused by Cut-and-fill Mining is studied. According to simulation results, it is concluded that the deformation of ground surface is still going on developing; the region of subsidence on the ground surface is similar with a circle; the area on the hanging wall side is larger than one on the lower wall side; the contour plots show the centre of subsidence lay on the hanging wall side and the position is near the ore body boundary of 1150m and 1250m where ore body is the thickest. Along strike-line of Jinchuan Deposit Ⅱ, the deformation at the middle of filling body is larger than that in the two sides. Because of the irregular ore body, stress concentrates at the boundary of ore body. With the process of excavation and filling, the high stress release and the stress focus disappear on the hanging wall side. The cut-and-fill mechanism is studied based on monitoring data and numerical simulation. The functions of filling body are discussed. In this dissertation, it is concluded that the stress of filling body is just 2MPa, but the stress of surrounding rock mass is 20MPa. We study the surface movement influenced by the elastic modulus of backfill. The minimal value of the elastic modulus of backfill which can guarantee the safety production of cut-and-fill mine is obtained. Finally, based on the real survey results of the horizontal ore layer and numerical simulation, it is indicated that the horizontal ore layer has destroyed. Key words: cut-and-filling mining, 3D numerical simulation, field monitoring, rock mass movement, cut-and-filling mechanism, the elastic modulus of backfill, the horizontal ore layer

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Xiao-wan Power Station is the second highest arch dam in the world under construction. The height of the dam is about 292m. Large-scale excavation in the dam foundation of Xiao-wan Power Station has brought intensive unloading phenomenon. We collected a large number of firsthand data on unloaded rock mass in dam foundation, which supplies a natural testing ground for researching unloaded rock mass after excavation. Detailed study was carried out on the parameters of unloaded rock mass in the dam foundation of Xiao-wan Power Station. The study is not only importance for the Xiao-wan Power Station, but also has important instruction significance to similar projects in the Southwest of China. In order to study the mechanical parameters of unloaded rock mass, large field and laboratory tests were carried out. The test results showed the size effect of the sample is obvious. The change of deformation modulus of rock is not obvious. However, the Poisson's ratio of rock is increased under unloaded condition, its value is even more than 0.5. The theoretical forecasted results is accordance to the field tests including sound wave data and deformation monitoring data, which shows the forecasted results were reasonable. The soften yield criterion was adopted in the thesis to study the characteristics of the brittle rock mass in order to simulate their brittle failures. Based on the study results above, the transform of the structural plane network model to the numerical one was carried out, which made it feasible to consider the influence of large amount joints on the mechanical characteristic of rock mass in the numerical analyses. Using a factor, the degree of the damage or strengthen of rock mass can be determined rapidly, which proposed a rapid and feasible method for the determination of the parameters of rock mass.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Abstract The karsrt erosion engineering geology became a highlight problem in recent years, in particularly, the karst erosion of marlite of Badong formation made the rock mechanics weaken in Three Gorges Reservoir area, which reduces the safety of slope. During the immigrant construction, many high slopes have been formed, whose instabilities problems pose serious threats to the safety of the people and properties. The accidents of the slope failure take place now and then. By testing, it has been found that the karst erosion pattern and dissolution rate of marlite are not weaker than that of the pure limestone. Furthermore, owning to the weathering and unloading, the karst erosion of the marlite will reach certain depth of the slope, which is named infiltrated karst erosion. The karst erosion made the rock mass quality of slope or foundation worse in a large scale. The karst erosion geological disasters, taken place or not, has become the main restrictive factors to the social stability and economic development. Thus the karst erosion process and mechanism of marlite of Badong formation are studied as the main content of this dissertation. The weakening characteristic of rock mass mechanics parameters are studied along with the rock mass structure deformation and failure processes in the course of the karst erosion. At first, the conditions and influencing factors of the karst erosion are analyzed in the investigative region, on the basis of different karst erosion phenomenon of the marlite and different failure modes of slope. Then via indoor the karst erosion tests, it is analyzed that the karst erosion will change the rock mass composition and its structure. Through test, the different karst erosion phenomena between micro and macro have been observed, and the karst erosion mechanism of the marlite has been summarized. Damage theory is introduced to explain the feature of dissolution pore and the law of crack propagation in the marlite. By microscope and the references data, it can be concluded that the karst erosion process can be divided into rock minerals damage and rock structural damage. And the percent of karst erosion volume is named damage factor, which can be used to describe the quantify karst erosion degree of marlite. Through test, the rock mechanical properties in the different period of karst erosion are studied. Based on the damage mechanics theory and the test result, the relation between the karst erosion degree of marlite and weakening degree of mechanical properties is summarized. By numerical simulations, the karst erosive rock mass mechanics is verified. The conclusion is drawn as below: to the rock mass of marlite, the karst erosion damage made mechanics parameters variation, the deformation modulus, cohesion, and inter friction angle reduce as the negative exponent with the increasing of the karst erosion volume, however, the Poisson ratio increases as the positive exponent with the karst erosion volume increasing. It should be noticed that the deduced formulations are limited to the test data and certain conditions. It is suitable to the rock mass parametric weakening process after the karst erosion of marlite in Three Gorges Reservoir area. Based on the failure types of marlite slope in the field, the karst erosion and weathering process of rock mass are analyzed. And the evolution law of deformation and failure of the marlite mass is studied. The main failure feature of the marlite slope is the karst erosive structure subsidence mode in Three Gorges Reservoir area. The karst erosive structure subsidence mode is explained as follows: the rock mass undergoes the synthetic influence, such as weathering, unloading, corrosion, and so on, many pores and cavities have been formed in the rock mass interior, the rock mass quality is worsen and the rock mass structure is changed, and then the inherent structure of rock mass is collapsed under its gravity, therefore, the failure mode of compaction and subsidence take place. Finally, two examples are used to verify the rock mass parameters in Three Gorges Reservoir area, and the relationship between the marlite slope stability and the time of karst erosion is proposed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As a kind of strategic resource,petroleum play an very important role in current social stability, economic development and state safety. Since 1993 China has turned from a net oil exporter into a net oil importer, the figure of imported oil increased from then on. In 2004 China's total energy consumption exceeded Japan’s, and ranked in the second place, just inferior to America. Today China is the world’s third-largest importing nation, accounting for 6% of world imports and 8% of world consumption. Comparing with other strategic petroleum reserve schemes, underground oil storage possess many advantages, such as security, economy, less pollution, save land, suited for strategic reserve and so on, so it is the most ideal form for strategic petroleum reserve. In the background of China Strategic Petroleum Reserve Program started just now, this paper choose Circum-Bo sea region as a study area, and do some system study on the underground oil storage caverns constructed in inter-large granite rock masses in Circum-Bo sea region. On the foundation of a great amount of information come from both home and abroad, firstly this paper analysed the principle, economy, cavern shape, profile dimension, and gain some cognizances and logos, as follows: ①Hard rock mass such as granite is the major rock, in which underground oil storage are constructed; ②Unlined underground oil storage caverns had been wide spread used as a sort of oil storage form abroad, there already exist a suit of skilled experience and technologies to prevent oil product from leaking; ③Compared with surface tanks, underground oil storage cavern possess predominance in economy clearly. In general, it will be more economical when the storage capacity exceed 50000m3. The quality of rock mass is the most important factor for underground storage cost, however such as hydrogeology, storage capacity, the number of storage galleries, the length, storage product, mechanical equipments, geographic location also influent the cost. In designed depth of the underground storage, the rock mass of Jinzhou mainly belong to class Ⅱ, but parts with dykes, clayization alteration, and dense joints are Ⅲ, Ⅳ; ④Now, there are few underground oil storages span more than 25m in both abroad and home. The examples of some ancient underground works and modern underground excavation with wide span surely give us many precious elicitations to construct more great unlined storage caverns, when the rock mass quality is good, cavern shape and construction method also are proper, it is quite possible to construct underground oil storage cavern with span more than 30m . The main axis orientation of Jinzhou underground oil storage cavern is NW direction, the cavern's elevation locate between -53msl and -76msl. The storage's total volume is about 3×106m3, composed of 8 parallel galleries with 950m length, the pillars between them are 45m, and every two of galleries form one unit, which can deposit 75×104m3 for each unit. The product will be stored are Saudi light and Saudi medium crude oil, the main cavern's section is 411.5m2, with 23m height and 19m width. According to the principle and technique of engineering geomechanics, this study supply a sort of system scientific thinking and method for sitting location of underground oil storage in granite region: ① On the foundation of the earth crust stability sub-zone appraise of Circum-Bo sea region, farther research concerning granite distribution, genesis, geological period and fault structure are conducted in stable areas, generally, this paper select Liaoxi, east shore of Liaotung peninsula and Jiaotung peninsula as target areas for underground oil storage regions, where Mesozoic granite is magnitude; ②After roundly comparison in facts of geologic structure, engineering geology, hydrogeology, topography, transportation and so on of three granite distributed areas, at last, selecting Jingzhou granite zone in Liaoxi out as an ideal construction area; ③ Detailed investigation is conducted in the southeast of Baimashi in Jingzhou development district, the final field. Ultrasonic Borehole Television, as a major way to collect original information of borehole rock mass were used, which is very effective to appraise the quality of deep rock mass; ④ According to the field data of tectonic stress, rock mass quality, the spatial distribution of fracture water, some optimum designs in cross section, axial direction and cavern span have been designed for the underground oil storage cavern layout in Jinzhou. To understand the characteristics of swelling alteration rock in Jinzhou granite mass, collected abundant swelling alteration rock engineering examples in granite, which study them in detail, concluded the swelling alteration rock distribute nearly everywhere in China, intruded medium-basic dykes alteration, along discontinuities and mineral hydrothermal alteration with genesis of granite are three main forms clayization alteration rock in granite rock mass. In Jinzhou field, from macro to micro studied the swelling rock which induced by mid-basic dyke intrusion, with weak swelling. In conclusion, this paper conclude the distribution rule and features of expansion alteration rock in filed, and advise some technical suggestions for excavation at swelling alteration rock part. The main features of this paper: ①In the process of site selection, investigation and design, a suit of technique and method of engineering geomechanics metasynthesis were formed, which is significative to guide the large scale underground oil storage cavern sitting location, investigation and design in granite rock mass; ②The detailed discussion on the engineering geology problems in granite mass, such as weathering crust, faults, dykes and clayization alteration rock, are useful for other projects in aspects of site selection, engineering geology evaluation and stability estimation; ③The summary and integration of the genesis, type, countermeasure relate to swelling alteration rock, also is likely to be used for other underground oil storage caverns constructed in swelling alteration granite. In conclusion, this study is meaningful for guiding the large scale underground oil storage for site selection, investigation and design in granite rock mass.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Jinchuan Nickel Mine is the largest underground mine with cut-and-fill mining in China. It is very difficult to be exploited for very low safety stability of rock mass caused by complex geological conditions, developed faults, cracked rock mass and high stress. In this paper, the laws of rock mass movement、mechanics of shaft deformation and destroy were analyzed based on the collection of date, the detailed field engineering investigations, ground movement monitoring by GPS, theoretical analysis and numerical simulation. According to the GPS monitoring result of ground surface movement, there are different ground movement characteristics among the three Mine area of Jinchuan Nickel Mine. In No. 2 Mine area, the ground movement funnel with apparent asymmetry is developing, the influence scope is larger in the up faulted block than in the down faulted block, and the centre of ground movement is moving along the up faulted block direction with increasing depth of mining. Moreover, the tunnels in the corresponding area with the centre of ground movement are damaged seriously. In Longshou Mine area, the ground movement funnel is also developing, but the moving path and the nonlinear characters are more sophisticated because of the long-term effects of open excavating and the effects of underground mining together. In No. 3 Mine area, the underground mining impact on surface is not serious for the time of mining activity is not for long, but the ground movement funnel is also forming now. The underground mining has caused widespread land subsidence in Jinchuan Nickel Mine area, but the phenomena of surface raise appeared in some partial areas of Longshou Mine area and No. 3 Mine area. Analysis proved that the reason for the open pit bottom raise is the slope deformation activation caused by the excavation from open pit into underground mine; and that the raise of surface in No.3 Mine area is caused by the effect of elastic foundation due to underground mining. Although the GPS Monitoring results show the amount of subsidence is increasing constantly, the subsidence rate has a descending tendency with fluctuation in Jinchuan No. 2 Mine area. The subsidence rate curve is a time function and exists an extreme point, the rate increasing before extreme point and decreasing after the extreme point ,but the scale of decreasing rate will be very small after the rate decreasing up to a certain degree, moreover, the characteristics is different among different areas, which have some relation with the distance to the mining section and the dip of the ore body. ArcView is GIS software, which we adopted as a development platform, and made secondary development by its development language “avenue”, through which we developed a ground movement analysis and forecast System for Jinchuan Nickel Mine, which contain three modules : management of ground movement information; analysis and evaluation of ground movement; and ground movement forecast. In the module of evaluation, using the technique of MATLAB6.5 program with VB6.0, the system can achieve the ANN prediction model for GPS monitoring data, data preparation results analysis and model integrated was realized by Avenue programming. Finally, the author analyzed the mechanical of deformation and destroy of the No. 14 shaft, and its repair and artificial-support effectiveness also given detailed demonstration in various aspect. The result showed that the reason for the destroy of No. 14 shaft is underground mining, and being the case, the destroy of the shaft also has its special features, which mainly contains forked stress contour for mining steep ore and fault effect caused by mining activities. The repair and artificial-support played some restrictions on the rock mass movement and deformation, but did not show a strong or marked effect. With the increasing of mining depth and large-scale, the closure rock of the shaft will still deformed, even be destroyed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis bases on horizontal research project “The research about the fine structure and mechanical parameters of abutment jointed rock mass of high arch dam on Jinping Ⅰ Hydropower Station, Yalong River” and “The research about the fine structure and mechanical parameters of the columnar basalt rock mass on Baihetan Hydropower Station, Jinsha River”. A rounded system about the fine structure description and rock mass classification is established. This research mainly contains six aspects as follow: (1) Methods about fine structure description of the window rock mass; (2) The window rock mass classification about the fine structure; (3) Model test study of intermittent joints; (4) Window rock mass strength theory; (5) Numerical experimentations about window rock mass; (6) The multi-source fusion of mechanical parameters based on Bayes principle. Variation of intact rock strength and joint conditions with the weathering and relaxation degree is studied through the description of window rock mass. And four principal parameters: intact rock point load strength, integration degree of window rock mass, joint conditions, and groundwater condition is selected to assess the window rock mass. Window rock mass is classified into three types using the results of window rock mass fine structure description combined with joints develop model. Scores about intact rock strength, integrality condition, divisional plane condition and groundwater conditions are given based on window rock mass fine structure description. Then quality evaluation about two different types of rock mass: general joint structure and columnar jointing structure are carried out to use this window rock mass classification system. Application results show that the window rock mass classification system is effective and applicable. Aimed at structural features of window structure of “the rock mass damaged by recessive fracture”, model tests and numerical models are designed about intermittent joints. By conducting model tests we get shear strength under different normal stress in integrated samples, through samples and intermittent joints samples. Also, the changing trends of shear strength in various connectivity rates are analyzed. We numerically simulate the entire process of direct shear tests by using PFC2D. In order to tally the stress-strain curve of numerical simulation with experimental tests about both integrated samples and through samples, we adjust mechanical factors between particles. Through adopting the same particle geometric parameter, the numerical sample of intermittent joints in different connective condition is re-built. At the same time, we endow the rock bridges and joints in testing samples with the fixed particle contacting parameters, and conduct a series of direct shear tests. Then the destructive process and mechanical parameters in both micro-prospective and macro-prospective are obtained. By synthesizing the results of numerical and sample tests and analyzing the evolutionary changes of stress and strain on intermittent joints plane, we conclude that the centralization of compressive stress on rock bridges increase the shear strength of it. We discuss the destructive mechanics of intermittent joints rock under direct shear condition, meanwhile, divide the whole shear process into five phases, which are elasticity phase, fracture initiation phase, peak value phase, after-peak phase and residual phase. In development of strength theory, the shear strength mechanisms of joint and rock bridge are analyzed respectively. In order to apply the deducted formulation conveniently in the real projects, a relationship between these formulations and Mohr-Coulomb hypothesis is built up. Some sets of numerical simulation methods, i.e. the distinct element method (UDEC) based on in-situ geology mapping are developed and introduced. The working methods about determining mechanical parameters of intact rock and joints in numerical model are studied. The operation process and analysis results are demonstrated detailed from the research on parameters of rock mass based on numerical test in the Jinping Ⅰ Hydropower Station and Baihetan Hydropower Station. By comparison,the advantages and disadvantages are discussed. Results about numerical simulation study show that we can get the shear strength mechanical parameters by changing the load conditions. The multi-source rock mass mechanical parameters can be fused by the Bayes theory, which are test value, empirical value and theoretical value. Then the value range and its confidence probability of different rock mass grade are induced and these data supports the reliability design.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

During tunnel constriction the classification of rock mass is widely used in tunnel design and construction. Moreover it offers the base information about tunnel investment and security. The quick classification of rock mass is very important for not delaying tunnel construction. Nowadays the tunnel engineers usually use initial survey files which are obtained by probe drilling to design a tunnel. It brings the problem that initial surrounding rock classification is usually much different from the real condition during the tunnel construction. Because initial surrounding rock lack credibility, it need us to make real time surrounding rock classification during the tunnel construction, and feed back the result to designers and constructors. Therefore, to find a quick wall rock classification method is very important not only for the time limit for a project but also for not delaying tunnel construction. Not all but many tunnels and underground constructions do suffer form collapse during the period of construction. Although accidental collapse in a large project in civil and geotechnical engineering sometimes appears to be a local event, if it occurred, it can bring about casualties, disrupted,production, construction delay, environmental damage, capital cost etc,therefore, it has been a difficult problem ,both in theory and in practice, establishing how to prevent underground structures form collapse and how to handle such an event in case in occurs. It is important to develop effective solutions and technical measures to prevent and control the collapse. According to the tunnel collapse occurred in Cheng De this paper analyze the main collapse mechanism leading to tunnel collapse and summon up the disposal method when collapse happened. It may be useful for tunnel construction in Cheng De in future. This paper is base on tunnel surrounding rock classification and tunnel support tasks during the tunnel construction in Cheng De area. It aims at solving 4 important problems in tunnel design and construction. 1) The relationship between rock rebound strength and rock single axle compression strength. First we go to the face wall and do rebound test on the tunnel face, then we chose some pieces of rock and do point loading test. Form the tests record we try to find the relationship between rock rebound strength and rock single axle compression strength. 2) The relationship between the value [BQ] and the value Q. First in order to obtain the information of rock character, rock strength, degree of weathering, the structure of rock mass, the joint condition, underground water condition and so on, we go to the tunnel face to do field investigation. And then we use two kinds of rock classification method to make surrounding rock classification. Base on the works above, finally we analyze the relationship between the value [BQ] and the value Q. 3) Sum up the mechanism leading to tunnel collapse and it disposal method in Cheng De area According to the tunnel collapse occurred in Cheng De this paper analyze the main reasons leading to the tunnel collapse and sum up the disposal method when collapse happened. 4) Obtain the properties of steel frame grid by numerical simulation. First we establish the 3D numeral model of steel frame grid by ADINA, and then find the mechanics properties by numerical simulation in ADINA. Second Based on the rock mass geological structure model, we established steel frame grid numeral model which is installed in the tunnel by FLAC3D and simulated the progress of tunnel construction. We hope that the support effect in tunnel can be evaluated from the numerical simulation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The great deal of joints and faults , existing in the rock mass , are the leading cause of discontinuous rock mass. Structural planes not only destroy the integrality of rock mass, but also lead nonlinearity、heterogeneity、anisotropy and failure mode on mechanical properties of rock mass. Therefore the selection of strength and deformation parameters was very difficult. In practical rock mass engineering, equivalent parameters of rock mass were selected by the method of expert experience and engineering analogy. Based on the fine description of discontinuous joints in the type Ⅳ and Ⅴ rock mass and geological survey datum in situ, models was obtained by generalizing the structure of rock mass by the method of statistical analysis. Model intensity and deformation test were carried out on the true triaxial apparatus. Intermediate principle stress effect, anisotropy and dimension effect of discontinuous rock mass were considered in the model test. 3-D correction to Hoek-Brown empirical criterion was done by analysed the test datum. Detailed works were listed as follows: (1) The factors influenced intensity and deformation of discontinuous joints rock mass were the value of 、continuity, density and included angle of joints and anisotropy of joint plane. True triaxial intensity and deformation tests were carried out by considering above factors. The influence rule was obtained and corresponding relation formulary was established; (2) Based on the true triaxial tests under different stress path and load modes, we obtain intensity and deformation rule of rock mass; (3) Based on a great deal of true triaxial tests and other test datum, correction to the Hoek-Brown empirical criterion was done in the chapter 4. The intermediate principle stress was considered in the corrected formulary. It indicated that the formulary was applicable under a certain condition. In addition, the yield plane form of corrected Hoek-Brown empirical criterion under principle stress space was described in the paper. And the question of corner of yield plane was discussed; (4) Based on the single discontinuity theory, the three-dimensional intensity formulary of discontinuous joint rock mass was established. Correction to the intensity formulary was done considering intermediate principle stress effect. We may obtain the conclusion that the intensity of the discontinuous joint rock mass was influenced on compositive factors. They were 、 、continuity、internal frictional angle and cohesiveness of joint plane and rock; (5) The results of the true triaxial model test was applied into parameters evaluation of dam foundation rock mass of JinPing hydropower station. For there were abundant ophicalcite in the dam foundation, the interval of intensity and formation parameters influenced on continuity were determined based on test datum. (6) Especial mould for prismatic jointing model was designed. True triaxial intensity and deformation tests by Basalt with prismatic jointing were carried out. The influence of intermediate principle stress, stress path, anisotropy effect and dimensional effect to intensity and deformation was discussed in the chapter 6. The work of (3)、(4)、(6) was significative supplement and innovation to current test and theory.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

There are two major problems that have been concerned all the times, which are the mechanics characters of joint rock mass and the criterion for stability of engineering rock. Aim at the two problems, several works were conducted as follow: (1) Firstly, the mechanics characters of rock mass was studied by means of the Distinct Element Code. Subsequently, it was studied that the sensibility of joint surface roughness, strength of joint wall, joint stiffness ( i.e. tangential and normal stiffness) on the rock mass strength. (2) Based on the experimental rock mass classification methods of RMR and GSI, the program of “Parameters Calculation of the Rock Mass ” was developed. It has realized the rapid choice of rock mass parameters. (3) The concept of Representive Element Volume was induced based on the study of dimensional effect of rock mass. The Representive Element Volume of the horizontal and vertical pillar (ab. Two Pillars ) in the 2nd zone of Jinchuan mine were gained by the Geology Statistic Method and the Distinct Element Code. And then, the strength and deformatiom parameters of rock mass of the Two Pillars were obtained through numerical experiment. (4) From the confining depressure after thriaxial compression test of rock sample, it was concluded that the failure of rock is caused mainly by the lateral deformation and energy release happened during the confining depressure processure. The criterion of plastic energy catastrophe of rock engineering failure was proposed and validated. Subsquently, the stability of the horizontal pillar and Qianjiangping landslide in Three Gorges was judged by means of above-mentioned method. (5) Based on the fact there is a phenomenon of increasing energy concentration while the rock mass was compressed, rock information entropy (i.e. energy distribution entropy) was proposed. And it was revealed that there was change of energy distribution entropy while the rock mass was compressed to failure.