Resumo

The Jinchuan Nickel Mine is the largest underground mine with cut-and-fill mining in China. It is very difficult to be exploited for very low safety stability of rock mass caused by complex geological conditions, developed faults, cracked rock mass and high stress. In this paper, the laws of rock mass movement、mechanics of shaft deformation and destroy were analyzed based on the collection of date, the detailed field engineering investigations, ground movement monitoring by GPS, theoretical analysis and numerical simulation. According to the GPS monitoring result of ground surface movement, there are different ground movement characteristics among the three Mine area of Jinchuan Nickel Mine. In No. 2 Mine area, the ground movement funnel with apparent asymmetry is developing, the influence scope is larger in the up faulted block than in the down faulted block, and the centre of ground movement is moving along the up faulted block direction with increasing depth of mining. Moreover, the tunnels in the corresponding area with the centre of ground movement are damaged seriously. In Longshou Mine area, the ground movement funnel is also developing, but the moving path and the nonlinear characters are more sophisticated because of the long-term effects of open excavating and the effects of underground mining together. In No. 3 Mine area, the underground mining impact on surface is not serious for the time of mining activity is not for long, but the ground movement funnel is also forming now. The underground mining has caused widespread land subsidence in Jinchuan Nickel Mine area, but the phenomena of surface raise appeared in some partial areas of Longshou Mine area and No. 3 Mine area. Analysis proved that the reason for the open pit bottom raise is the slope deformation activation caused by the excavation from open pit into underground mine; and that the raise of surface in No.3 Mine area is caused by the effect of elastic foundation due to underground mining. Although the GPS Monitoring results show the amount of subsidence is increasing constantly, the subsidence rate has a descending tendency with fluctuation in Jinchuan No. 2 Mine area. The subsidence rate curve is a time function and exists an extreme point, the rate increasing before extreme point and decreasing after the extreme point ,but the scale of decreasing rate will be very small after the rate decreasing up to a certain degree, moreover, the characteristics is different among different areas, which have some relation with the distance to the mining section and the dip of the ore body. ArcView is GIS software, which we adopted as a development platform, and made secondary development by its development language “avenue”, through which we developed a ground movement analysis and forecast System for Jinchuan Nickel Mine, which contain three modules : management of ground movement information; analysis and evaluation of ground movement; and ground movement forecast. In the module of evaluation, using the technique of MATLAB6.5 program with VB6.0, the system can achieve the ANN prediction model for GPS monitoring data, data preparation results analysis and model integrated was realized by Avenue programming. Finally, the author analyzed the mechanical of deformation and destroy of the No. 14 shaft, and its repair and artificial-support effectiveness also given detailed demonstration in various aspect. The result showed that the reason for the destroy of No. 14 shaft is underground mining, and being the case, the destroy of the shaft also has its special features, which mainly contains forked stress contour for mining steep ore and fault effect caused by mining activities. The repair and artificial-support played some restrictions on the rock mass movement and deformation, but did not show a strong or marked effect. With the increasing of mining depth and large-scale, the closure rock of the shaft will still deformed, even be destroyed.

Identificador

http://159.226.119.211/handle/311031/1240

http://www.irgrid.ac.cn/handle/1471x/174256

Idioma(s)

中文

Fonte

金川矿山岩体移动规律及竖井变形、破坏机理研究.邓清海[d].中国科学院地质与地球物理研究所,2007.20-25

Palavras-Chave #地下开采 #GPS监测 #岩体移动规律 #信息系统 #变形-破坏机理
Tipo

学位论文