868 resultados para Project management Computer programs


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management in the construction industry involves coordination of many tasks and individuals, affected by complexity and uncertainty, which increases the need for efficient cooperation. Procurement is crucial since it sets the basis for cooperation between clients and contractors. This is true whether the project is local, regional or global in scope. Traditionally, procurement procedures are competitive, resulting in conflicts, adversarial relationships and less desirable project results. The purpose of this paper is to propose and empirically test an alternative procurement model based on cooperative procurement procedures that facilitates cooperation between clients and contractors in construction projects. The model is based on four multi-item constructs – incentive-based compensation, limited bidding options, partner selection and cooperation. Based on a sample of 87 client organisations, the model was empirically tested and exhibited strong support, including content, nomological, convergent and discriminant validity, as well as reliability. Our findings indicate that partner selection based on task related attributes mediates the relationship between two important pre-selection processes (incentive-based compensation and limited bid invitation) and preferred outcome of cooperation. The contribution of the paper is identifying valid and reliable measurement constructs and confirming a unique sequential order for achieving cooperation. Moreover, the findings are applicable for many types of construction projects because of the similarities in the construction industry worldwide.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Entrepreneurial Orientation (EO) has a 30 year history as one of the most used concepts in entrepreneurship research. “Recent attention in formal sessions at the Academy of Management conference programs confirm Entrepreneurial Orientation as a primary construct with a majority of Entrepreneurship Division sponsored sessions devoted to studies using EO related measures”, as reported by the 2010 division program chair, Per Davidson (Roberts, 2010: 9). However, questions continue to be raised concerning over-dependence on parts of one strategic scale, possible inappropriate or under-theorized adaptations, and the lack of theoretical development on application and performance variance in emergent, organizational, and socioeconomic settings. One recent area of investigation in analysis, methods, theory and application concerns an “EO gestalt”, focusing on the family of EO-related measures and theory, rather than on one or more dimensions, in order to explore the theory and process of the Entrepreneurial Orientation phenomenon. The goals of the 4th Annual EO3 PDW are to enlighten researchers on the development of Entrepreneurial Orientation theory and related scales, balance the use of Entrepreneurial Orientation current knowledge with new research frontiers suggested by EO3 scholars’ questions, and transcend boundaries in the discoveries undertaken in the shared interdisciplinary and cross-cultural research agenda currently developing for Entrepreneurial Orientation concepts. Going into its forth year, the EO3 PDW has been pivotal in formalizing discussion, pushing research forward, and gaining insights from experienced and cutting edge scholars, as it provides a point of reference for coalescing research questions and findings surrounding this important concept.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Project Management Company No 2 Pty Ltd v Cushway Blackford & Associates Pty Ltd [2011] QCA 102 the appellant sought leave to join its parent company party (Project Management Company No 1) as a plaintiff to the proceedings and to amend its statement of claim. It was argued that the parent company had suffered the loss claimed in the proceedings, rather than the appellant. Rule 69(1)(b)(ii) of the Uniform Civil Procedure Rules 1999 (Qld) allows a court at any stage of the proceeding to order that ‘a person whose presence before the court would be desirable, just and convenient to enable the court to adjudicate effectually and completely on all matters in dispute connected with the proceeding’ be include as a party. To determine this issue, the Court of Appeal had to review the law relevant to the proceedings – a claim in negligence for pure economic loss, in particular, the principles espoused by the High Court in Bryan v Maloney(1995) 182 CLR 609 and Woolcock Street Investments Pty Ltd v CDG Pty Ltd (2004) 216 CLR 515.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A better understanding of Open Source Innovation in Physical Product (OSIP) might allow project managers to mitigate risks associated with this innovation model and process, while developing the right strategies to maximise OSIP outputs. In the software industry, firms have been highly successful using Open Source Innovation (OSI) strategies. However, OSI in the physical world has not been studied leading to the research question: What advantages and disadvantages do organisations incur from using OSI in physical products? An exploratory research methodology supported by thirteen semi-structured interviews helped us build a seven-theme framework to categorise advantages and disadvantages elements linked with the use of OSIP. In addition, factors impacting advantage and disadvantage elements for firms using OSIP were identified as: „h Degree of openness in OSIP projects; „h Time of release of OSIP in the public domain; „h Use of Open Source Innovation in Software (OSIS) in conjunction with OSIP; „h Project management elements (Project oversight, scope and modularity); „h Firms. Corporate Social Responsibility (CSR) values; „h Value of the OSIP project to the community. This thesis makes a contribution to the body of innovation theory by identifying advantages and disadvantages elements of OSIP. Then, from a contingency perspective it identifies factors which enhance or decrease advantages, or mitigate/ or increase disadvantages of OSIP. In the end, the research clarifies the understanding of OSI by clearly setting OSIP apart from OSIS. The main practical contribution of this paper is to provide manager with a framework to better understand OSIP as well as providing a model, which identifies contingency factors increasing advantage and decreasing disadvantage. Overall, the research allows managers to make informed decisions about when they can use OSIP and how they can develop strategies to make OSIP a viable proposition. In addition, this paper demonstrates that advantages identified in OSIS cannot all be transferred to OSIP, thus OSIP decisions should not be based upon OSIS knowledge.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundamental studies on constructability issue done in United States, United Kingdom and Australia illustrate capability of this concept to affect overall objectives of construction projects. It can result in significant cost and time savings and improved final quality by consideration of construction contractors experiences during conceptual planning and design phases. As intensive as these studies are, they do not attempt to investigate importance of these activities in order to find each of their specific barriers separately. This research explores Constructability Activities (CAs) in all project phases separately based on amount of contractors involvement in each activity and also amount of gap that exists between target and actual effects of each activity on achieving the final objectives of building projects in Malaysia. It ends to development of Critical Constructability Activities (CCAs). This research is crucial to gaining a better understanding of CCAs which are caused based on contractors higher participation percentage and larger gaps between their target and actual effects on achieving the final aims of the project. This research highlights the need to overcome barriers of CAs implementation in building projects. This study recommends construction stakeholders to concentrate more on CCAs in order to achieve the overall objectives of the project much faster and easier.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates the use of visual artifacts to represent a complex adaptive system (CAS). The integrated master schedule (IMS) is one of those visuals widely used in complex projects for scheduling, budgeting, and project management. In this paper, we discuss how the IMS outperforms the traditional timelines and acts as a ‘multi-level and poly-temporal boundary object’ that visually represents the CAS. We report the findings of a case study project on the way the IMS mapped interactions, interdependencies, constraints and fractal patterns in a complex project. Finally, we discuss how the IMS was utilised as a complex boundary object by eliciting commitment and development of shared mental models, and facilitating negotiation through the layers of multiple interpretations from stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A key issue in the economic development and performance of organizations is the existence of standards. Their definition and control are sources of power and it is important to understand their concept, as it gives standards their direction and their legitimacy, and to explore how they are represented and applied. The difficulties posed by classical micro-economics in establishing a theory of standardization that is compatible with its fundamental axiomatic are acknowledged. We propose to reconsider the problem by taking the opposite perspective in questioning its theoretical base and by reformulating assumptions about the independent and autonomous decisions taken by actors. The Theory of Conventions will offer us a theoretical framework and tools enabling us to understand the systemic dimension and dynamic structure of standards. These will be seen as a special case of conventions. This work aims to provide a sound basis and promote a better consciousness in the development of global project management standards. It aims also to emphasize that social construction is not a matter of copyright but a matter of open minds, collective cognitive process and freedom for the common wealth.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Modern project management had its genesis in the field of operations research in the late 1940s, but today it is a much more diverse subject. It has evolved and developed a much wider range of methods, techniques, and skills that the project manager can draw upon. Not all these skills are relevant to every project, but an assortment of them will be relevant to most. This book aims to describe for students, researchers and managers the full range of skills that project managers can use to develop their methodologies.The authors group the skills into nine perspectives, representing nine schools of project management research and theory. By attaching a metaphor to each of these perspectives, students, researchers and managers are better able to understand each approach and decide whether it is best suited to the development of a strategy for managing their project. Perspectives on Projects builds upon the various theoretical orientations that the field of project management has developed. Featuring several case studies, drawn from a variety of settings, to illustrate how the different schools can provide different perspectives on projects, this book is an ideal text for anyone involved in project management.

Relevância:

100.00% 100.00%

Publicador: