984 resultados para Diagrama HR
Resumo:
The primary objective of this project is to develop a design manual that would aid the county or municipal engineer in making structurally sound bridge strengthening or replacement decisions. The contents of this progress report are related only to Phase I of the study and deal primarily with defining the extent of the bridge problem in Iowa. In addition, the types of bridges to which the manual should be directed have been defined.
Resumo:
Velocity-density tests conducted in the laboratory involved small 4-inch diameter by 4.58-inch-long compacted soil cylinders made up of 3 differing soil types and for varying degrees of density and moisture content, the latter being varied well beyond optimum moisture values. Seventeen specimens were tested, 9 with velocity determinations made along two elements of the cylinder, 180 degrees apart, and 8 along three elements, 120 degrees apart. Seismic energy was developed by blows of a small tack hammer on a 5/8-inch diameter steel ball placed at the center of the top of the cylinder, with the detector placed successively at four points spaced 1/2-inch apart on the side of the specimen involving wave travel paths varying from 3.36 inches to 4.66 inches in length. Time intervals were measured using a model 217 micro-seismic timer in both laboratory and field measurements. Forty blows of the hammer were required for each velocity determination, which amounted to 80 blows on 9 laboratory specimens and 120 blows on the remaining 8 cylinders. Thirty-five field tests were made over the three selected soil types, all fine-grained, using a 2-foot seismic line with hammer-impact points at 6-inch intervals. The small tack hammer and 5/8-inch steel ball was, again, used to develop seismic wave energy. Generally, the densities obtained from the velocity measurements were lower than those measured in the conventional field testing. Conclusions were reached that: (1) the method does not appear to be usable for measurement of density of essentially fine-grained soils when the moisture content greatly exceeds the optimum for compaction, and (2) due to a gradual reduction in velocity upon aging, apparently because of gradual absorption of pore water into the expandable interlayer region of the clay, the seismic test should be conducted immediately after soil compaction to obtain a meaningful velocity value.
Resumo:
The coefficients of relative strength (CORS) of base courses for use in the American association state highway officials (AASHO) interim guide for the design of flexible pavements are determined here. Based on (1) volumetric strain--axial strain relationships at minimum volume, and (2) effective stress ratio-cohesion relationships at maximum effective stress ratio, CORS were determined from the results of laboratory triaxial tests on both asphalt-treated and untreated aggregate base course materials. The researchers conclude that volumetric strain-axial strain at minimum volume appear to be appropriate parameters for determining CORS.
Resumo:
Four series of five specimens each were investigated for static and fatigue strength. These four series differed in that there were two variables, the first being the subsidence of concrete around reinforcing bars and the second being shrinkage due to two different curing conditions. The combinations of these variables were then compared to each other by use of, load-deflection curves and S-H fatigue curves.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests and a supplementary test program. The results reported in this report cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members removed from the two bridges. The field test results of the service loading are compared with theoretical results of the truss analysis.
Resumo:
This report is a brief overview of the recent Iowa Department of Transportation research in the area of durability of Portland cement, concrete under the direction of Wendeli Dubberke. Present plans are to publish a more detailed report on low Portland cement concrete- durability research in January, 1985.
Resumo:
The Iowa road system has approximately 13,000 miles of Portland Cement Concrete Pavements, many of which are reaching the stage where major rehabilitation is required. Age, greater than anticipated traffic, heavier loads and deterioration related to coarse aggregate in the original pavement are some of the reasons that these pavements have reached this level of distress. One method utilized to rehabilitate distressed or underdesigned PCC pavements is the thin bonded Portland Cement Concrete overlay. Since the introduction of thin bonded overlays on highway pavements in 1973, the concrete paving industry has made progress in reducing the construction costs of this rehabilitation technique. With the advent of the shotblast machine, surface preparation costs have decreased from over $4.00 per square yard to most recently $1.42 per square yard. Other construction costs, including placement, grouting and sawing, have also declined. With each project, knowledge and efficiency have improved.
Iowa Development of Rubblized Concrete Pavement Base Mills County, Construction Report, HR-315, 1990
Resumo:
The concept of rubblizing existing concrete pavement prior to the placement of an asphaltic cement concrete overlay has been around for several years and, in fact, has been tried successfully in the states of New York, Michigan, and Ohio. With available construction and maintenance dollars usually not meeting the demands of the needed work, much of the necessary rehabilitation of existing Portland cement concrete pavements is not being completed when it would be most beneficial. Research project HR-315, "Iowa Development of Rubblized Concrete", has been undertaken to determine the effects of rubblized concrete pavement base as it affects the cracking pattern and longevity of the ACC overlay.
Resumo:
Portland Cement Concrete (PCC) pavement has served the State of Iowa well for many years. The oldest Iowa pavement was placed in LeMars in 1904. Beginning in 1931, many miles of PCC pavement were built to "get out of the mud.” Many of these early pavements provided good performance without deterioration for more than 50 years. In the late 1950's, Iowa was faced with severe PCC pavement deterioration referred to as D cracking. Research identified the cause of this deterioration as crushed limestone containing a bad pore system. Selective quarrying and ledge control has alleviated this problem. In 1990, cracking deterioration was identified on a three year old pavement on us 20 in central Iowa. The coarse aggregate was a crushed limestone with an excellent history of performance in PCC pavement. Examination of cores showed very few cracks through the coarse aggregate particles. The cracks were predominately confined to the matrix. The deterioration was identified as alkali-silica reactivity (ASR) by a consultant.
Resumo:
The objectives were to determine the feasibility and performance of this type of construction and to determine if the macadam base is effective in reducin9or eliminating D-cracking deterioration.
Resumo:
The object of this research project is to construct and evaluate several bituminous concrete base overlays with various high penetration bituminous products which have the potential to reduce future maintenance and construction costs. In September of 1981 nine different bituminous test sections were constructed on Osceola County roads A-34 and A-46 east of Ashton. Asphalt binders used were AC-5 asphalt cement, SC-800 liquid asphalt, MC-3000 cutback asphalt, CSS-1 emulsion and HFMS-2 emulsion. Aggregate for four of the test sections consisted of salvaged bituminous pavement and new aggregate combined. Each section was road mixed using a different binder arid placed 2-1/4" thick with a motor patrol. The other five test sections consisted of an AC-5 Type B asphalt concrete control section and four plant-mixed, cold-laid bituminous concrete overlay sections using new aggregate. The material was mixed in a continuous drum mix plant and laid with a full width paver.
Resumo:
In this report, the authors present the data accumulated from a one-year study of runoff quantity and quality from two sections of Interstate Highway 35 near Ames with an interpretation of the significance of the data. The report will discuss the site setup, operational aspects of data collection, and problems encountered. In addition, recommendations are included to optimize information gained from the study.
Resumo:
Tutkielma on kvalitatiivinen haastattelututkimus, jonka tavoitteena on tarkastella HR-asiantuntijapalveluiden;konsultoinnin, ulkoistamisen ja vuokrajohtajuuden käyttöä sekä mahdollisuuksia PK-sektorilla. Tutkimuksessa perehdytään myös työn toimeksiantajan, case-yritys Virvon liiketoimintaan HR-asiantuntijapalveluiden markkinoilla ja siihen, miten Virvo pystyy vastaamaan näihin haasteisiin. HR-asiantuntijapalveluiden markkinoiden selvittämiseksi on haastateltu neljää HR-asiantuntijaa. Tämän pohjalta on tehty 15 PK-yrityksen toimitusjohtajan haastattelua HR-asiantuntijapalveluiden käytön selvittämiseksi. Tehdyt haastattelut ovat olleet puolistrukturoituja, jolloin on käytetty valmiita kysymyspohjia. Tutkimuksessa on selvinnyt, että HR-asiantuntijamarkkinat ovat vasta muotoutumassa ja että ala on varsin uusi. PK-yritysten HR-toimintojen haasteisiin pystytään parhaiten vastaamaan HR-asiantuntijapalveluilla, jotka ovat selkeitä kokonaisuuksia ja järkevästi hinnoiteltuja. Tärkeinä asioina on nähty esimerkiksi käytännön toteutus sekä lisäajan saaminen varsinaisen liiketoiminnan hoitamiseen. Palveluiden käyttö korostuu erityisesti erilaisissa muutostilanteissa kuten esimerkiksi yrityksen kasvuvaiheessa. Voidaan todeta myös, että liiketoiminnan tila vaikuttaa HR-asiantuntijapalveluiden käyttöön.
Resumo:
Aplicación práctica del método de análisis funcional de productos industriales. Análisis funcional para un microondas doméstico y alternativas de diseño derivadas