877 resultados para Contractors Rating of
Resumo:
Cold-formed steel members can be assembled in various combinations to provide cost-efficient and safe light gauge floor systems for buildings. Such Light gauge Steel Framing (LSF) systems are widely accepted in industrial and commercial building construction. An example application is in floor-ceiling systems. Light gauge steel floor-ceiling systems must be designed to serve as fire compartment boundaries and provide adequate fire resistance. Fire-rated floor-ceiling assemblies formed with new materials and construction methodologies have been increasingly used in buildings. However, limited research has been undertaken in the past and hence a thorough understanding of their fire resistance behaviour is not available. Recently a new composite floor-ceiling system has been developed to provide higher fire rating under standard fire conditions. But its increased fire rating could not be determined using the currently available design methods. Therefore a research project was carried out to investigate its structural and fire resistance behaviour under standard fire conditions. In this research project full scale experimental tests of the new LSF floor system based on a composite ceiling unit were undertaken using a gas furnace at the Queensland University of Technology. Both the conventional and the new steel floor-ceiling systems were tested under structural and fire loads. Full scale fire tests provided a good understanding of the fire behaviour of the LSF floor-ceiling systems and confirmed the superior performance of the new composite system. This paper presents the details of this research into the structural and fire behaviour of light gauge steel floor systems protected by the new composite panel, and the results.
Resumo:
Case note of Leighton Contractors Pty Ltd v Fox (2009) 258 ALR 673 ----- In Leighton Contractors Pty Ltd v Fox (2009) 83 ALJR 1086 ; 258 ALR 673 the High Court considered the liability of a principal contractor for the negligence of independent subcontractors on a building site. In its decision, the court considered the nature and the scope of the duty owed by principals to independent contractors.
Resumo:
Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)
Resumo:
Light gauge steel frame (LSF) structures are increasingly used in commercial and residential buildings because of their non-combustibility, dimensional stability and ease of installation. A common application is in floor-ceiling systems. The LSF floor-ceiling systems must be designed to serve as fire compartment boundaries and provide adequate fire resistance. Fire-rated floor-ceiling assemblies have been increasingly used in buildings. However, limited research has been undertaken in the past and hence a thorough understanding of their fire resistance behaviour is not available. Recently a new composite floor-ceiling system has been developed to provide higher fire rating. But its increased fire rating could not be determined using the currently available design methods. Therefore a research project was conducted to investigate its structural and fire resistance behaviour under standard fire conditions. This paper presents the results of full scale experimental investigations into the structural and fire behaviour of the new LSF floor system protected by the composite ceiling unit. Both the conventional and the new floor systems were tested under structural and fire loads. It demonstrates the improvements provided by the new composite panel system in comparison to conventional floor systems. Numerical studies were also undertaken using the finite element program ABAQUS. Measured temperature profiles of floors were used in the numerical analyses and their results were compared with fire test results. Tests and numerical studies provided a good understanding of the fire behaviour of the LSF floor-ceiling systems and confirmed the superior performance of the new composite system.
Resumo:
Objective: There are currently no adult mental health outcome measures that have been translated into Australian sign language (Auslan). Without a valid and reliable Auslan outcome measure, empirical research into the efficacy of mental health interventions for sign language users is unattainable. To address this research problem the Outcome Rating Scale (ORS), a measure of general functioning, was translated into Auslan and recorded on to digital video disk for use in clinical settings. The purpose of the present study was therefore to examine the reliability, validity and acceptability of an Auslan version of the ORS (ORS-Auslan). Method: The ORS-Auslan was administered to 44 deaf people who use Auslan as their first language and who identify as members of a deaf community (termed ‘Deaf’ people) on their first presentation to a mental health or counselling facility and to 55 Deaf people in the general community. The community sample also completed an Auslan version of the Depression Anxiety Stress Scale-21 (DASS-21). Results: t-Tests indicated significant differences between the mean scores for the clinical and community sample. Internal consistency was acceptable given the low number of items in the ORS-Auslan. Construct validity was established by significant correlations between total scores on the DASS-21-Auslan and ORS-Auslan. Acceptability of ORS-Auslan was evident in the completion rate of 93% compared with 63% for DASS-21-Auslan. Conclusions: This is the only Auslan outcome measure available that can be used across a wide variety of mental health and clinical settings. The ORS-Auslan provides mental health clinicians with a reliable and valid, brief measure of general functioning that can significantly distinguish between clinical and non-clinical presentations for members of the Deaf community.
Resumo:
Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.
Resumo:
This present paper reviews the reliability and validity of visual analogue scales (VAS) in terms of (1) their ability to predict feeding behaviour, (2) their sensitivity to experimental manipulations, and (3) their reproducibility. VAS correlate with, but do not reliably predict, energy intake to the extent that they could be used as a proxy of energy intake. They do predict meal initiation in subjects eating their normal diets in their normal environment. Under laboratory conditions, subjectively rated motivation to eat using VAS is sensitive to experimental manipulations and has been found to be reproducible in relation to those experimental regimens. Other work has found them not to be reproducible in relation to repeated protocols. On balance, it would appear, in as much as it is possible to quantify, that VAS exhibit a good degree of within-subject reliability and validity in that they predict with reasonable certainty, meal initiation and amount eaten, and are sensitive to experimental manipulations. This reliability and validity appears more pronounced under the controlled (but more arti®cial) conditions of the laboratory where the signal : noise ratio in experiments appears to be elevated relative to real life. It appears that VAS are best used in within-subject, repeated-measures designs where the effect of different treatments can be compared under similar circumstances. They are best used in conjunction with other measures (e.g. feeding behaviour, changes in plasma metabolites) rather than as proxies for these variables. New hand-held electronic appetite rating systems (EARS) have been developed to increase reliability of data capture and decrease investigator workload. Recent studies have compared these with traditional pen and paper (P&P) VAS. The EARS have been found to be sensitive to experimental manipulations and reproducible relative to P&P. However, subjects appear to exhibit a signi®cantly more constrained use of the scale when using the EARS relative to the P&P. For this reason it is recommended that the two techniques are not used interchangeably
Resumo:
Power transformers are one of the most important and costly equipment in power generation, transmission and distribution systems. Current average age of transformers in Australia is around 25 years and there is a strong economical tendency to use them up to 50 years or more. As the transformers operate, they get degraded due to different loading and environmental operating stressed conditions. In today‘s competitive energy market with the penetration of distributed energy sources, the transformers are stressed more with minimum required maintenance. The modern asset management program tries to increase the usage life time of power transformers with prognostic techniques using condition indicators. In the case of oil filled transformers, condition monitoring methods based on dissolved gas analysis, polarization studies, partial discharge studies, frequency response analysis studies to check the mechanical integrity, IR heat monitoring and other vibration monitoring techniques are in use. In the current research program, studies have been initiated to identify the degradation of insulating materials by the electrical relaxation technique known as dielectrometry. Aging leads to main degradation products like moisture and other oxidized products due to fluctuating thermal and electrical loading. By applying repetitive low frequency high voltage sine wave perturbations in the range of 100 to 200 V peak across available terminals of power transformer, the conductive and polarization parameters of insulation aging are identified. An in-house novel digital instrument is developed to record the low leakage response of repetitive polarization currents in three terminals configuration. The technique is tested with known three transformers of rating 5 kVA or more. The effects of stressing polarization voltage level, polarizing wave shapes and various terminal configurations provide characteristic aging relaxation information. By using different analyses, sensitive parameters of aging are identified and it is presented in this thesis.
Resumo:
This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.
Resumo:
Anecdotal evidence from the infrastructure and building sectors highlights issues of drugs and alcohol and its association with safety risk on construction sites. Operating machinery and mobile equipment, proximity to live traffic together with congested sites, electrical equipment and operating at heights conspire to accentuate the potential adverse impact of drugs and alcohol in the workplace. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgement from drugs and alcohol. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients; unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. This study has four key objectives. Firstly, using the standard World Health Organisation AUDIT, a national qualitative and quantitative assessment of the use of drugs and alcohol will be carried out. This will build upon similar studies carried out in the Australian energy and mining sectors. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Thirdly, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. Finally, an implementation plan will be developed from data gathered from both managers and construction employees. Such an approach stands to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This paper will provide an overview of the background and significance of the study as well as outlining the proposed methodology that will be used to evaluate the safety impacts of alcohol and other drugs in the construction industry.
Resumo:
One major gap in transportation system safety management is the ability to assess the safety ramifications of design changes for both new road projects and modifications to existing roads. To fulfill this need, FHWA and its many partners are developing a safety forecasting tool, the Interactive Highway Safety Design Model (IHSDM). The tool will be used by roadway design engineers, safety analysts, and planners throughout the United States. As such, the statistical models embedded in IHSDM will need to be able to forecast safety impacts under a wide range of roadway configurations and environmental conditions for a wide range of driver populations and will need to be able to capture elements of driving risk across states. One of the IHSDM algorithms developed by FHWA and its contractors is for forecasting accidents on rural road segments and rural intersections. The methodological approach is to use predictive models for specific base conditions, with traffic volume information as the sole explanatory variable for crashes, and then to apply regional or state calibration factors and accident modification factors (AMFs) to estimate the impact on accidents of geometric characteristics that differ from the base model conditions. In the majority of past approaches, AMFs are derived from parameter estimates associated with the explanatory variables. A recent study for FHWA used a multistate database to examine in detail the use of the algorithm with the base model-AMF approach and explored alternative base model forms as well as the use of full models that included nontraffic-related variables and other approaches to estimate AMFs. That research effort is reported. The results support the IHSDM methodology.
Resumo:
Fire design is an essential part of the overall design procedure of structural steel members and systems. Conventionally, increased fire rating is provided simply by adding more plasterboards to Light gauge Steel Frame (LSF) stud walls, which is inefficient. However, recently Kolarkar & Mahendran (2008) developed a new composite wall panel system, where the insulation was located externally between the plasterboards on both sides of the steel wall frame. Numerical and experimental studies were undertaken to investigate the structural and fire performance of LSF walls using the new composite panels under axial compression. This paper presents the details of the numerical studies of the new LSF walls and the results. It also includes brief details of the experimental studies. Experimental and numerical results were compared for the purpose of validating the developed numerical model. The paper also describes the structural and fire performance of the new LSF wall system in comparison to traditional wall systems using cavity insulation.
Resumo:
Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.
Resumo:
This project discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focuses on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.