937 resultados para material flow management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Strikes provide a current, fresh but also a seldom-addressed issue to study from economic sciences perspective. This study provides to filling this research gap by trying to identify attitudes towards strikes that can be found inside organizations. The research problem this study then sets out to answer is: “What kinds of attitudes exist inside organizations towards industrial actions and how attitudes vary between labour, management and human resources?” This study has been planned with a view to test how qualitative attitudinal research, as a method, is suited to studying a phenomenon such as strike. At the heart of this research approach lies an assumption linked to rhetoric social psychology, that attitude is a phenomenon that can be identified in argumentation. For this research 10 semi-structured interviews in 4 organizations were conducted utilizing statements and pictures as stimulants for discussion. The material was transcribed and analysed following the two levels, categorical and interpretive, demanded by the chosen method. Altogether five attitudes were discovered; three of them negative, one indifferent and one positive by nature. The negative attitudes of unfairness, failure and personification towards strikes represented the side of strikes that was perhaps the most anticipated, portraying the contradictions between employees and employer. The attitude of ordinariness, which portrayed indifference, and the positive attitude of change however, were more unanticipated findings. They reflect shared understanding and trust between conflict parties. The utilization of qualitative attitudinal approach to study strikes was deemed successful. The results of this study support prior literature on workplace conflicts for example in regards of the definition of conflict and typologies conflicts. In addition the multifaceted nature of strikes can be perceived as one statement supported by this study. It arises in the nature of the attitudes, the diversity of discussion themes during the interviews as well as in the extent of possible theories to apply.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In R&D organizations multiple projects are executed concurrently. Problems arises in managing shared resources since they are needed by multiple projects simultaneously. The objective of this thesis was to study how the project and resource management could be developed in a public sector R&D organization. The qualitative research was carried out in the Magnetic Measurements section at CERN where the section measures magnets for particle accelerators and builds state of the art measurement devices for various needs. Hence, the R&D and measurement projects are very time consuming and very complex. Based on the previous research and the requirements from the organization the best alter- native for resource management was to build a project management information system. A centralized database was constructed and on top of it was built an application for interacting and visualizing the project data. The application allows handling project data, which works as a basis for resource planning before and during the projects are executed. It is one way to standardize the work-flow of projects, which strengthens the project process. Additionally, it was noted that the inner customer’s database, the measurement system and the new application needed to be integrated. Further integration ensures that the project data is received efficiently from customers and available not only within the application but also during the concrete work. The research results introduced a new integrated application, which centralizes the project information flow with better visibility.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Liiketoiminnan organisoiminen projekteiksi on erittäin yleistä nykyisin. Suuri osa projekteista erityisesti IT-alalla epäonnistuu kuitenkin saavuttamaan tavoitteensa. Projektin menestys on tyypillisesti mitattu budjetin, aikataulun, laadun ja sidosryhmien tyytyväisyyden perusteella. Tämän Pro Gradu -tutkielman tarkoituksena on etsiä tyypillisimpiä syitä projektien epäonnistumiseen ja löytää projektien seurannan ja mittaamisen avulla keinoja näiden epäonnistumisten ehkäisemiseen. Tutkimusmenetelmänä on laadullinen tapaustutkimus. Empiirinen aineisto on kerätty haastattelujen, eri materiaalien analysoinnin ja havainnoinnin avulla. Teoriaosuus tarjoaa kattavan yhteenvedon projektiliiketoiminnan ja yksittäisten projektien johtamiseen sekä projektien seurantaan ja mittaamiseen aikaisemman kirjallisuuden perusteella. Empiirisessä osiossa suoritetaan analyysi Case -yrityksen projektien seurantaan ja valittuihin projekteihin. Analyysien, haastattelujen ja havainnoinnin pohjalta tehdään johtopäätökset tyypillisimmistä, ongelmia projekteissa aiheuttavista tekijöistä sekä näiden esiintymisestä projektin elinkaaren eri vaiheissa. Mahdolliset ongelmia ehkäisevät keinot esitetään myös. Ehdotuksia kehityskohteiksi esitetään lopuksi teorian ja empirian pohjalta.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this thesis is to examine how the reporting of operations related to green supply chain management and industrial symbiosis has evolved in UPM, Fortum and Kemira within the last ten years. The focus is on the improved operations, which are studied based on annual reports of these companies. The study provides a deeper understanding of the nature of green supply chain management and industrial symbiosis as well as the possibilites that their combination offers. The research is part of the DemaNET research project The study indicates that the environmental regulations and reporting standards have forced the studied companies to report their operations related to green supply chain management and industrial symbiosis more in detail during the last ten years. The operations related to green supply chain management in the studied companies are more common compared to operations related to industrial symbiosis. Often these two operations were also partially integrated, indicating a hybrid model. Even though firms often used hybrid models they still focused mainly on greening the internal operations rather than finding alternative ways for symbiosis outside the organization. The integration of green supply chain management and industrial symbiosis is most likely to occur when mutually beneficial relationships align the interests of all parties, thus resulting in the co-creation of value. The findings suggest that identifying mutual benefits and the flow of by-products are the ones that companies should give more attention to.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Effective processes to fractionate the main compounds in biomass, such as wood, are a prerequisite for an effective biorefinery. Water is environmentally friendly and widely used in industry, which makes it a potential solvent also for forest biomass. At elevated temperatures over 100 °C, water can readily hydrolyse and dissolve hemicelluloses from biomass. In this work, birch sawdust was extracted using pressurized hot water (PHWE) flow-through systems. The hypothesis of the work was that it is possible to obtain polymeric, water-soluble hemicelluloses from birch sawdust using flow-through PHW extractions at both laboratory and large scale. Different extraction temperatures in the range 140–200 °C were evaluated to see the effect of temperature to the xylan yield. The yields and extracted hemicelluloses were analysed to obtain sugar ratios, the amount of acetyl groups, furfurals and the xylan yields. Higher extraction temperatures increased the xylan yield, but decreased the molar mass of the dissolved xylan. As the extraction temperature increased, more acetic acid was released from the hemicelluloses, thus further decreasing the pH of the extract. There were only trace amounts of furfurals present after the extractions, indicating that the treatment was mild enough not to degrade the sugars further. The sawdust extraction density was increased by packing more sawdust in the laboratory scale extraction vessel. The aim was to obtain extracts with higher concentration than in typical extraction densities. The extraction times and water flow rates were kept constant during these extractions. The higher sawdust packing degree decreased the water use in the extractions and the extracts had higher hemicellulose concentrations than extractions with lower sawdust degrees of packing. The molar masses of the hemicelluloses were similar in higher packing degrees and in the degrees of packing that were used in typical PHWE flow-through extractions. The structure of extracted sawdust was investigated using small angle-(SAXS) and wide angle (WAXS) x-ray scattering. The cell wall topography of birch sawdust and extracted sawdust was compared using x-ray tomography. The results showed that the structure of the cell walls of extracted birch sawdust was preserved but the cell walls were thinner after the extractions. Larger pores were opened inside the fibres and cellulose microfibrils were more tightly packed after the extraction. Acetate buffers were used to control the pH of the extracts during the extractions. The pH control prevented excessive xylan hydrolysis and increased the molar masses of the extracted xylans. The yields of buffered extractions were lower than for plain water extractions at 160–170 °C, but at 180 °C yields were similar to those from plain water and pH buffers. The pH can thus be controlled during extraction with acetate buffer to obtain xylan with higher molar mass than those obtainable using plain water. Birch sawdust was extracted both in the laboratory and pilot scale. The performance of the PHWE flow-through system was evaluated in the laboratory and the pilot scale using vessels with the same shape but different volumes, with the same relative water flow through the sawdust bed, and in the same extraction temperature. Pre-steaming improved the extraction efficiency and the water flow through the sawdust bed. The extracted birch sawdust and the extracted xylan were similar in both laboratory and pilot scale. The PHWE system was successfully scaled up by a factor of 6000 from the laboratory to pilot scale and extractions performed equally well in both scales. The results show that a flow-through system can be further scaled up and used to extract water-soluble xylans from birch sawdust. Extracted xylans can be concentrated, purified, and then used in e.g. films and barriers, or as building blocks for novel material applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The bedrock of old crystalline cratons is characteristically saturated with brittle structures formed during successive superimposed episodes of deformation and under varying stress regimes. As a result, the crust effectively deforms through the reactivation of pre-existing structures rather than by through the activation, or generation, of new ones, and is said to be in a state of 'structural maturity'. By combining data from Olkiluoto Island, southwestern Finland, which has been investigated as the potential site of a deep geological repository for high-level nuclear waste, with observations from southern Sweden, it can be concluded that the southern part of the Svecofennian shield had already attained structural maturity during the Mesoproterozoic era. This indicates that the phase of activation of the crust, i.e. the time interval during which new fractures were generated, was brief in comparison to the subsequent reactivation phase. Structural maturity of the bedrock was also attained relatively rapidly in Namaqualand, western South Africa, after the formation of first brittle structures during Neoproterozoic time. Subsequent brittle deformation in Namaqualand was controlled by the reactivation of pre-existing strike-slip faults.In such settings, seismic events are likely to occur through reactivation of pre-existing zones that are favourably oriented with respect to prevailing stresses. In Namaqualand, this is shown for present day seismicity by slip tendency analysis, and at Olkiluoto, for a Neoproterozoic earthquake reactivating a Mesoproterozoic fault. By combining detailed field observations with the results of paleostress inversions and relative and absolute time constraints, seven distinctm superimposed paleostress regimes have been recognized in the Olkiluoto region. From oldest to youngest these are: (1) NW-SE to NNW-SSE transpression, which prevailed soon after 1.75 Ga, when the crust had sufficiently cooled down to allow brittle deformation to occur. During this phase conjugate NNW-SSE and NE-SW striking strike-slip faults were active simultaneous with reactivation of SE-dipping low-angle shear zones and foliation planes. This was followed by (2) N-S to NE-SW transpression, which caused partial reactivation of structures formed in the first event; (3) NW-SE extension during the Gothian orogeny and at the time of rapakivi magmatism and intrusion of diabase dikes; (4) NE-SW transtension that occurred between 1.60 and 1.30 Ga and which also formed the NW-SE-trending Satakunta graben located some 20 km north of Olkiluoto. Greisen-type veins also formed during this phase. (5) NE-SW compression that postdates both the formation of the 1.56 Ga rapakivi granites and 1.27 Ga olivine diabases of the region; (6) E-W transpression during the early stages of the Mesoproterozoic Sveconorwegian orogeny and which also predated (7) almost coaxial E-W extension attributed to the collapse of the Sveconorwegian orogeny. The kinematic analysis of fracture systems in crystalline bedrock also provides a robust framework for evaluating fluid-rock interaction in the brittle regime; this is essential in assessment of bedrock integrity for numerous geo-engineering applications, including groundwater management, transient or permanent CO2 storage and site investigations for permanent waste disposal. Investigations at Olkiluoto revealed that fluid flow along fractures is coupled with low normal tractions due to in-situ stresses and thus deviates from the generally accepted critically stressed fracture concept, where fluid flow is concentrated on fractures on the verge of failure. The difference is linked to the shallow conditions of Olkiluoto - due to the low differential stresses inherent at shallow depths, fracture activation and fluid flow is controlled by dilation due to low normal tractions. At deeper settings, however, fluid flow is controlled by fracture criticality caused by large differential stress, which drives shear deformation instead of dilation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Process management refers to improving the key functions of a company. The main functions of the case company - project management, procurement, finance, and human resource - use their own separate systems. The case company is in the process of changing its software. Different functions will use the same system in the future. This software change causes changes in some of the company’s processes. Project cash flow forecasting process is one of the changing processes. Cash flow forecasting ensures the sufficiency of money and prepares for possible changes in the future. This will help to ensure the company’s viability. The purpose of the research is to describe a new project cash flow forecasting process. In addition, the aim is to analyze the impacts of the process change, with regard to the project control department’s workload and resources through the process measurement, and how the impacts take the department’s future operations into account. The research is based on process management. Processes, their descriptions, and the way the process management uses the information, are discussed in the theory part of this research. The theory part is based on literature and articles. Project cash flow and forecasting-related benefits are also discussed. After this, the project cash flow forecasting as-is and to-be processes are described by utilizing information, obtained from the theoretical part, as well as the know-how of the project control department’s personnel. Written descriptions and cross-functional flowcharts are used for descriptions. Process measurement is based on interviews with the personnel – mainly cost controllers and department managers. The process change and the integration of two processes will allow work time for other things, for example, analysis of costs. In addition to the quality of the cash flow information will improve compared to the as-is process. Analyzing the department’s other main processes, department’s roles, and their responsibilities should be checked and redesigned. This way, there will be an opportunity to achieve the best possible efficiency and cost savings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sales and operations research publications have increased significantly in the last decades. The concept of sales and operations planning (S&OP) has gained increased recognition and has been put forward as the area within Supply Chain Management (SCM). Development of S&OP is based on the need for determining future actions, both for sales and operations, since off-shoring, outsourcing, complex supply chains and extended lead times make challenges for responding to changes in the marketplace when they occur. Order intake of the case company has grown rapidly during the last years. Along with the growth, new challenges considering data management and information flow have arisen due to increasing customer orders. To manage these challenges, case company has implemented S&OP process, though initial process is in early stage and due to this, the process is not managing the increased customer orders adequately. Thesis objective is to explore extensively the S&OP process content of the case company and give further recommendations. Objectives are categorized into six different groups, to clarify the purpose of this thesis. Qualitative research methods used are active participant observation, qualitative interviews, enquiry, education, and a workshop. It is notable that demand planning was felt as cumbersome, so it is typically the biggest challenge in S&OP process. More proactive the sales forecasting can be, more expanded the time horizon of operational planning will turn out. S&OP process is 60 percent change management, 30 percent process development and 10 percent technology. The change management and continuous improvement can sometimes be arduous and set as secondary. It is important that different people are required to improve the process and the process is constantly evaluated. As well as, process governance is substantially in a central role and it has to be managed consciously. Generally, S&OP process was seen important and all the stakeholders were committed to the process. Particular sections were experienced more important than others, depending on the stakeholders’ point of views. Recommendations to objective groups are evaluated by the achievable benefit and resource requirement. The urgent and easily implemented improvement recommendations should be executed firstly. Next steps are to develop more coherent process structure and refine cost awareness. Afterwards demand planning, supply planning, and reporting should be developed more profoundly. For last, information technology system should be implemented to support the process phases.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aker Arctic Technology Inc. (AACR) on kansainvälisesti tunnettu jäänmurtajien ja muiden arktisten alueiden laivojen suunnitteluun ja tekniseen konsultointiin erikoistuneena yhtiönä. Työn tavoitteena on luoda uusi arktisille alueille suunnattu liiketoimintakonsepti, jossa liiketoimintamallia kehitetään asiakastarpeen mukaan vastaamaan ja luomaan kysyntää palvelulle. Fyysisen kehitystyön tuloksena voidaan tarjota globaalisti ainutlaatuista teknistä testaustoimintaa ja säilytetään mallikoelaitoksen etumatka kilpailijoihin rakenteiden, tasanteiden ja alusten jäissä toimivuuden osalta. Tämän diplomityön teoreettisessa osuudessa kuvataan uusien ja jo olemassa olevien liiketoimintamallien kehittämiseen tarvittavaa johdon strategista välinettä Business Model Canvasia (BMC) ja muita analyysityökaluja. Työn teoreettisessa osuudessa käytettiin tieteellistä kirjallista aineistoa, julkaisuja sekä koti- että ulkomailta. Työn tutkimuksellisessa osuudessa havainnoitiin kuuden kuukauden ajan yrityksen sisällä toiminnassa tapahtuvaa liiketoimintaa. Havainnoinnin kautta kerättiin analyysien tiedot, joiden perusteella yhdessä yrityksen edustajien kanssa saatiin aikaan BMC. Uusi liiketoimintakonseptin todettiin olevan tarpeellinen arktisten offshore-palveluiden lisääntyvässä tarpeessa. Konseptin myötä saadaan nykyinen yrityksen palveluiden kompleksisuus pois ja samalla kyetään aggressiivisemmin markkinoimaan uusia tuotteita asiakkaille. Konseptin suurimpana vahvuutena on omat mallinnustilat, jonka monikäyttöisyys antaa liiketoiminnalle tarvittavan kilpailuedun.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Studying testis is complex, because the tissue has a very heterogeneous cell composition and its structure changes dynamically during development. In reproductive field, the cell composition is traditionally studied by morphometric methods such as immunohistochemistry and immunofluorescence. These techniques provide accurate quantitative information about cell composition, cell-cell association and localization of the cells of interest. However, the sample preparation, processing, staining and data analysis are laborious and may take several working days. Flow cytometry protocols coupled with DNA stains have played an important role in providing quantitative information of testicular cells populations ex vivo and in vitro studies. Nevertheless, the addition of specific cells markers such as intracellular antibodies would allow the more specific identification of cells of crucial interest during spermatogenesis. For this study, adult rat Sprague-Dawley rats were used for optimization of the flow cytometry protocol. Specific steps within the protocol were optimized to obtain a singlecell suspension representative of the cell composition of the starting material. Fixation and permeabilization procedure were optimized to be compatible with DNA stains and fluorescent intracellular antibodies. Optimization was achieved by quantitative analysis of specific parameters such as recovery of meiotic cells, amount of debris and comparison of the proportions of the various cell populations with already published data. As a result, a new and fast flow cytometry method coupled with DNA stain and intracellular antigen detection was developed. This new technique is suitable for analysis of population behavior and specific cells during postnatal testis development and spermatogenesis in rodents. This rapid protocol recapitulated the known vimentin and γH2AX protein expression patterns during rodent testis ontogenesis. Moreover, the assay was applicable for phenotype characterization of SCRbKO and E2F1KO mouse models.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.