929 resultados para Industry engineering
Resumo:
Building Information Modeling (BIM) concept is able to reshape each AEC project and the industry in general, offering a comprehensive collaboration process over a model of structure with regularly actualized and synchronized information. This report presents an overview of BIM with focus on its core concepts, applications in the project life cycle and benefits for project stakeholders through four case studies carried out during the internship in the engineering office NEWTON - Engineering Consultancy Company. The aim of the four cases studies was to cover multidisciplinary and varied projects. The first case study highlights the engineering project’s workflow and presents a comparison of traditional procedures and BIM concepts applied on the rehabilitation of an existing building. In the second and third case study, attention is focused on the goals achieved, particularly by structural engineer, due to the implementation of the mentioned technology on a full-lifecycle BIM project of a small residence and a complex project of residential building in Porto and on its architectural integration. In addition, through the fourth case study, the spatial coordination of Mechanical, Electrical and Plumbing (MEP) systems at a large-scale hotel project has been analyzed and accomplished, highlighting merits of BIM at this project stage. Through a reduction of the space used for facilities and infrastructures and the ability to identify conflicts and to nullify the related costs, its advantage for a complex building was proved.
Resumo:
A professional course program like engineering strives to get the maximum number of its students placed through campus interviews. While communication skills have been added in all the engineering courses with the aim to improve their performance in placement, the syllabus mostly concentrates on the development of four language skills. The students are not made aware of the employability skills and their significance. This essay intends to enlist the importance of skills and why students need to be aware of the skills they possess and how they can work on packaging their candidature around a few skills. The discussion starts by addressing the apparent gap between academic programs for engineering students and industry skills requirements. A list of vital employability skills from the standpoint of engineering students follows, with a discussion on how to potentially develop such skills through campus life. The essay stresses the role of academia in filling this gap by acting as facilitators in a three-step process (i.e., awareness, self-analysis, and acquisition). The author concludes that the combination of both employability skills along with an engineering degree should ensure students meet the high expectations of the employers.
Resumo:
For a largely arid country with generally low relief, Australia has a remarkably large number and variety of waterfalls. Found mainly near the coast, close to where most of the population lives and near the major tourist resort areas, these landscape features have long been popular scenic attractions. As sights to see and places to enjoy a variety of recreational activities, waterfalls continue to play an important role in Australia’s tourism, even in seaside resort areas where the main attractions are sunshine, sandy beaches and surf. The aesthetic appeal of waterfalls and their value as recreational resources are recognized by the inclusion of many in national parks. Even here, demands of visitors and pressures from developers raise serious problems. This paper examines the way in which waterfalls have been developed and promoted as tourist attractions, demonstrating their importance to Australian tourism. It considers threats to the sustainable use of waterfall resources posed by power schemes and, particularly, by the tourist industry itself. Queensland’s Gold Coast is selected as a case study, and comparisons are made with other areas in which waterfalls have played important roles as tourist attractions, especially the Yorkshire coast of northeast England. The discussion draws largely on an examination of tourist literature from the nineteenth to the twenty-first century, including holiday brochures and guide books, as well as other published sources, together with field observation in various parts of the world
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.