930 resultados para Design Management
Resumo:
Part-time employment presents a conundrum in that it facilitates work-life priorities, while also, compared to equivalent full-time roles, attracting penalties such as diminished career prospects and lower commensurate remuneration. Recently, some promising theoretical developments in the job/work design literature suggest that consideration of work design may redress some of the penalties associated with part-time work. Adopting the framework of the Elaborated Model of Work Design by Parker and colleagues (2001), we examined this possibility through interviews with part-time professional service employees and their supervisors. The findings revealed that in organizations characterised by cultural norms of extended working hours and a singular-focused commitment to work, part-time roles were often inadequately re-designed when adapted from full-time arrangements. The findings also demonstrated that certain work design characteristics (e.g. predictability of work-flow, interdependencies with co-workers) render some roles more suitable for part-time arrangements than others. The research provides insights into gaps between policy objectives and outcomes associated with part-time work, challenges assumptions about the limitations of part-time roles, and suggests re-design strategies for more effective part-time arrangements.
Resumo:
Current research in secure messaging for Vehicular Ad hoc Networks (VANETs) appears to focus on employing a digital certificate-based Public Key Cryptosystem (PKC) to support security. The security overhead of such a scheme, however, creates a transmission delay and introduces a time-consuming verification process to VANET communications. This paper proposes a non-certificate-based public key management for VANETs. A comprehensive evaluation of performance and scalability of the proposed public key management regime is presented, which is compared to a certificate-based PKC by employing a number of quantified analyses and simulations. Not only does this paper demonstrate that the proposal can maintain security, but it also asserts that it can improve overall performance and scalability at a lower cost, compared to the certificate-based PKC. It is believed that the proposed scheme will add a new dimension to the key management and verification services for VANETs.
Resumo:
This paper provides a critique of the Water Sensitive Urban Design (WSUD) paradigm by discussing its congruence with an established sustainable design principle called 'whole system design'. It was found that WSUD is congruent with the whole system design approach as a philosophy, but not in practice. Future improvement of WSUD practice may depend on the adoption of a front-loaded, teamwork-based design and planning process that is embedded in the principle of whole system design.
Resumo:
Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.
Resumo:
Though the value of a process-centred view for the understanding and (re-)design of corporations has been widely accepted, our understanding of the research process in Information Systems (IS) remains superficial. A process-centred view on IS research considers the conduct of a research project as a sequence of activities involving resources, data and research artifacts. As such, it helps to reflect on more effective ways to conduct IS research, to consolidate and compare diverse practices and to complement the focus on research methodologies with research project practices. This paper takes a first step towards the discipline of ‘Research Process Management’ by exploring the features of research processes and by presenting a preliminary approach for research process design that can facilitate modelling IS research. The case study method and the design science research method are used as examples to demonstrate the potential of such reference research process models.
Resumo:
Purpose – The purpose of this paper is to provide of a review of the theory and models underlying project management (PM) research degrees that encourage reflective learning. Design/methodology/approach – Review of the literature and reflection on the practice of being actively involved in conducting and supervising academic research and disseminating academic output. The paper argues the case for the potential usefulness of reflective academic research to PM practitioners. It also highlights theoretical drivers of and barriers to reflective academic research by PM practitioners. Findings – A reflective learning approach to research can drive practical results though it requires a great deal of commitment and support by both academic and industry partners. Practical implications – This paper suggests how PM practitioners can engage in academic research that has practical outcomes and how to be more effective at disseminating these research outcomes. Originality/value – Advanced academic degrees, in particular those completed by PM practitioners, can validate a valuable source of innovative ideas and approaches that should be more quickly absorbed into the PM profession’s sources of knowledge. The value of this paper is to critically review and facilitate a reduced adaptation time for implementation of useful reflective academic research to industry.
Resumo:
Purpose – The purpose of this paper is to present a cost-benefit interpretation of academic-practitioner research by describing and analysing several recent relevant examples of academic-practitioner research with a focus on doctoral theses carried out at universities and business schools in clusters of research centred in North America, Australia and Europe. Design/methodology/approach – Using case study examples, a value proposition framework for undertaking collaborative research for higher degree level study is developed and presented. Findings – Value proposition benefits from this level of collaborative research can be summarised as enhancing competencies at the individual and organisational level as well as providing participating universities with high-quality candidates/students and opportunities for industry engagement. The project management (PM) professional bodies can also extend PM knowledge but they need to be prepared to provide active support. Practical implications – A model for better defining the value proposition of collaborative research from a range of stakeholder perspectives is offered that can be adapted for researchers and industry research sponsors. Originality/value – Few papers offer a value proposition framework for explaining collaborative research benefits. This paper addresses that need.
Resumo:
With the large diffusion of Business Process Managemen (BPM) automation suites, the possibility of managing process-related risks arises. This paper introduces an innovative framework for process-related risk management and describes a working implementation realized by extending the YAWL system. The framework covers three aspects of risk management: risk monitoring, risk prevention, and risk mitigation. Risk monitoring functionality is provided using a sensor-based architecture, where sensors are defined at design time and used at run-time for monitoring purposes. Risk prevention functionality is provided in the form of suggestions about what should be executed, by who, and how, through the use of decision trees. Finally, risk mitigation functionality is provided as a sequence of remedial actions (e.g. reallocating, skipping, rolling back of a work item) that should be executed to restore the process to a normal situation.
Resumo:
Focusing on the role within and between organizations of the project management discipline to design and implement strategy, as source of competitive advantage, leads us to question the scientific field behind this discipline. This science should be the basis for the development and use of bodies of knowledge, standards, certification programs, education, and competencies, and beyond this as a source of value for people, organizations, and society. Thus the importance to characterize, define, and understand this field and its underlying strength, basis, and development is paramount. For this purpose we propose to give some insights on the current situation. This will lead us to clarify our epistemological position and demonstrate that both constructivism and positivist approaches are required to seize the full dimension and dynamics of the field.We will referee to sociology of actor-networks and qualitative scientometrics leading to the choice of the co-word analysis method in enabling us to capture the project management field and its dynamics.Results of a study based on the analysis of ABI Inform database will be presented and some future trends and scenarios proposed.
Resumo:
The content and context of work significantly influences an employees’ satisfaction. While managers see work motivation as a tool to engage the employees so that they perform better, academicians value work motivation for its contribution to human behaviour. Though the relationship between employee motivation and project success has been extensively covered in the literature, more research focusing on the nature of job design on project success may have been wanting. We address this gap through this study. The present study contributes to the extant literature by suggesting an operational framework of work motivation for project—based organizations. We are also advancing the conceptual understanding of this variable by understanding how the different facets of work motivation have a differing impact of the various parameters of project performance. A survey instrument using standardized scales of work motivation and project success was used. 199 project workers from various industries completed the survey. We first ‘operationalized’ the definition of work motivation for the purpose of our study through a principal component analysis of work motivation items. We obtained a five factor structure that had items pertaining to employee development, work climate, goal clarity, and job security. We then performed a Pearson’s correlation analysis which revealed moderate to significant relationship between project outcomes ad work climate; project outcomes & employee development. In order to establish a causality between work motivation and project management success, we employed linear regression analysis. The results show that work climate is a significant predictor of client satisfaction, while it moderately influences the project quality. Further, bringing in objectivity to project work is important for a successful implementation.
Resumo:
Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
Resumo:
Purpose: The construction industry is well known for its high accident rate and many practitioners consider a preventative approach to be the most important means of bringing about improvements. This paper addresses previous research and the weaknesses of existing preventative approaches and a new application is described and illustrated involving the use of a multi-dimensional simulation tool - Construction Virtual Prototyping (CVP). Methodology: A literature review was conducted to investigate previous studies of hazard identification and safety management and to develop the new approach. Due to weaknesses in current practice, the research study explored the use of computer simulation techniques to create virtual environments where users can explore and identify construction hazards. Specifically, virtual prototyping technology was deployed to develop typical construction scenarios in which unsafe or hazardous incidents occur. In a case study, the users’ performance was evaluated their responses to incidents within the virtual environment and the effectiveness of the computer simulation system established though interviews with the safety project management team. Findings: The opinions and suggestions provided by the interviewees led to the initial conclusion that the simulation tool was useful in assisting the safety management team’s hazard identification process during the early design stage. Originality: The research introduces an innovative method to support the management teams’ reviews of construction site safety. The system utilises three-dimensional modelling and four-dimensional simulation of worker behaviour, a configuration that has previously not been employed in construction simulations. An illustration of the method’s use is also provided, together with a consideration of its strengths and weaknesses.
Resumo:
Having IT-related capabilities is not enough to secure value from the IT resources and survive in today’s competitive environment. IT resources evolve dynamically and organisations must sustain their existing capabilities to continue to leverage value from their IT resources. Organisations’ IT-related management capabilities are an important source of their competitive advantage. We suggest that organisations can sustain these capabilities through appropriate considerations of resources at the technology-use level. This study suggests that an appropriate organisational design relating to decision rights and work environment, and a congruent reward system can create a dynamic IT-usage environment. This environment will be a vital source of knowledge that could help organisations to sustain their IT-related management capabilities. Analysis of data collected from a field survey demonstrates that this dynamic IT-usage environment, a result of the synergy between complementary factors, helps organisations to sustain their IT-related management capabilities. This study adds an important dimension to understanding why some organisations continue to perform better with their IT resources than others. For practice, this study suggests that organisations need to consider a comprehensive approach to what constitutes their valuable resources.