985 resultados para project teams


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In the last decades, the increasing significance of “projectivization” (Lundin & Steinthórsson, 2003) has stimulated considerable interest in project-based organizations as new economic actors able to introduce a new logic of organizing work and weakening boundaries in favour of networks of collaborations. In these contexts, work is often delegated to project teams. Deciding whom to put on a project team is one of the biggest challenges faced by a project manager; in particular which characteristics rely on to compose and match effective teams. We address this issue, focusing on the individual flexibility (Raudsepp, 1990), as team composition variable that affects project team performance. Thus, the research question investigated is: Is it better to compose project teams with flexible team members or not flexible project team members to achieve higher levels of project performance? The temporary nature of PBOs involves that after achieving the purpose for which team members are enrolled, they are disbanded but their relationships remain, allowing them to be involved in future projects (Starkey, Barnatt & Tempest, 2000). Pre-existing relationships together with the current relationships create a network of relationships that yields some implications for project teams as well as for team members. We address this issue, exploring the following research question: To what extent is the individual flexibility influenced by the network structure? The conceptual framework is used to articulate the research questions investigated with respect to the Television drama serials production. Their project-team organizing combined with their capacity to dissolve and recreate over time make it an interesting field to develop. We contribute to the organizational literature, providing a clear operationalization of individual flexibility construct and its role on affecting project performance. Second, we contribute to the organizational network literature addressing the effects yielded by the network structure-structural holes and network closure- on the individual flexibility.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Short-term project teams do not have the advantage of prior performance or long-term membership to facilitate development of effective team performance. Research suggests interpersonal skills are crucial to success but this is under researched longitudinally. Evolutionary psychology can provide a lens to explain how people develop differing levels of interpersonal skills via the relationship between fluctuating asymmetry and pro-social behaviours. This research aims to investigate the relationship between fluctuating asymmetry and interpersonal skills, the impact of training and to further the evolutionary psychology field by embedding research in a real-world context as opposed to solely in laboratory or student settings.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Even though today’s corporations recognize that they need to understand modern project management techniques (Schwalbe, 2002, p2), many researchers continue to provide evidence of poor IT project success. With Kotnour, (2000) finding that project performance is positively associated with project knowledge, a better understanding of how to effectively manage knowledge in IT projects should have considerable practical significance for increasing the chances of project success. Using a combined qualitative/quantitative method of data collection in multiple case studies spanning four continents, and comprising a variety of organizational types, the focus of this current research centered on the question of why individuals working within IT project teams might be motivated towards, or inhibited from, sharing their knowledge and experience in their activities, procedures, and processes. The research concluded with the development of a new theoretical model of knowledge sharing behavior, ‘The Alignment Model of Motivational Focus’. This model suggests that an individual’s propensity to share knowledge and experience is a function of perceived personal benefits and costs associated with the activity, balanced against the individual’s alignment to a group of ‘institutional’ factors. These factors are identified as alignments to the project team, to the organization, and dependent on the circumstances, to either the professional discipline or community of practice, to which the individual belongs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Co-operative Research Centre for Construction Innovation (CRC-CI) is funding a project known as Value Alignment Process for Project Delivery. The project consists of a study of best practice project delivery and the development of a suite of products, resources and services to guide project teams towards the best procurement approach for a specific project or group of projects. These resources will be focused on promoting the principles that underlie best practice project delivery rather than simply identifying an off-the-shelf procurement system. This project builds on earlier work by Sidwell, Kennedy and Chan (2002), on re-engineering the construction delivery process, which developed a procurement framework in the form of a Decision Matrix

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Research indicates, one of the last available ‘mechanisms’ left for organisations to improve their competitive position within the construction industry is by considering its people (culture) along with its technology (Schein E. H. 1997). In other words, if one wants to make construction industry organisations, groups and project teams more efficient and effective, then one must better understand the role that culture plays within them.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Building Information Model (BIM) software, collaboration platforms and 5D Construction Management software is now commercially available and presents the opportunity for construction project teams to design more cost effectively, plan construction earlier, manage costs throughout the life cycle of a building project and provide a central asset management register for facilities managers. This paper outlines the merits of taking a holistic view of ICT in curriculum design. The educational barriers to implementation of these models and planning tools are highlighted. Careful choice of computer software can make a significant difference to how quickly students can master skills; how easy it is to study and how much they enjoy learning and be prepared for employment. An argument for BIM and 5D planning tools to be introduced into the curriculum to assist industry increase productivity and efficiencies are outlined by the authors.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In Australia, it has been increasingly accepted that sustainability needs to be at the top of the agenda when contemplating infrastructure development. In practice however, many companies struggle to find effective ways to embrace sustainable ideas and implement them in real projects beyond minimum compliance. One of the reasons is the lack of underpinning knowledge and evidence to demonstrate and measure the linkage between sustainability implementations and the relevant outcomes. This is compounded by the fact that very often there are no common understandings between the stakeholders on sustainability and there is a big divide between research advancement and real-life applications. Therefore it is both feasible and timely to develop and expand the body of sustainability knowledge on infrastructure development and investigate better ways of communicating with and managing it within the infrastructure sector. Although knowledge management (KM) is a relatively new and emerging discipline, it has shown its value and promise in existing applications in the construction industry. Considering the existing KM mechanisms and tools employed in practice, this research is aimed at establishing a specific KM approach to facilitate sustainability knowledge identification, acquisition, sharing, maintenance and application within the infrastructure sector, and promote integrated decision-making for sustainable infrastructure development. A triangulation of questionnaire survey, semi-structured interviews and case studies was employed in this research to collect required qualitative and quantitative data. The research studied the unique characteristics of the infrastructure sector, the nature of sustainability knowledge, and evaluated and validated the critical elements, key processes, and priority issues of KM for the Australian infrastructure sector. A holistic KM framework was developed to set the overall context for managing sustainability knowledge in the infrastructure sector by outlining (1) the main aims and outcomes of managing sustainability knowledge, (2) the key knowledge activities, (3) effective KM strategies and instruments, and (4) KM enablers. Because of the highly project-oriented nature of the infrastructure sector, knowledge can only add value when it is being used in real projects. Implementation guidelines were developed to help the industry practitioners and project teams to apply sustainability knowledge and implement KM in infrastructure project scenarios. This research provides the Australian infrastructure sector with tools to better understand KM, helps the industry practitioners to prioritize attention on relevant sustainability issues, and recommends effective practices to manage sustainability knowledge, especially in real life implementation of infrastructure projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A considerable amount of research has confirmed the relationship between organizational culture and knowledge sharing behaviours. However, less research has been conducted on the impact of project sub-cultures in relation to the sharing of knowledge between projects, particularly in project based organizations (PBOs). The unique structures and contexts characterized by PBOs indicate the need to investigate further the impact of cultures present within PBOs and their effect on knowledge sharing. We report on a rich case study of four large Australian-based PBOs whereby the cultural values of these large organizations were seen to impact significantly on whether project teams were more or less likely to improve inter-project knowledge sharing. Furthermore, this research demonstrates the utility of using Cameron and Quinn's (2005) Competing Values Framework to evaluate culture in the context of PBOs

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Overview The incidence of skin tears, pressure injuries and chronic wounds increases with age [1-4] and therefore is a serious issue for staff and residents in Residential Aged Care Facilities (RACFs). A pilot project funded in Round 2 of the Encouraging Best Practice in Residential Aged Care (EBPRAC) program by the then Australian Government Department of Health and Ageing found that a substantial proportion of residents in aged care facilities experienced pressure injuries, skin tears or chronic wounds. It also found the implementation of the evidence based Champions for Skin Integrity (CSI) model of wound care was successful in significantly decreasing the prevalence and severity of wounds in residents, improving staff skills and knowledge of evidence based wound management, increasing staff confidence with wound management, increasing implementation of evidence based wound management and prevention strategies, and increasing staff awareness of their roles in evidence based wound care at all levels [5]. Importantly, during the project, the project team developed a resource kit on evidence based wound management. Two critical recommendations resulting from the project were that: - The CSI model or a similar strategic approach should be implemented in RACFs to facilitate the uptake of evidence based wound management and prevention - The resource kit on evidence based wound management should be made available to all Residential Aged Care Facilities and interested parties A proposal to disseminate or rollout the CSI model of wound care to all RACFs across Australia was submitted to the department in 2012. The department approved funding from the Aged Care Services Improvement Healthy Ageing Grant (ACSIHAG) at the same time as the Round 3 of the Encouraging Better Practice in Aged Care (EBPAC) program. The dissemination involved two crucial elements: 1. The updating, refining and distribution of a Champions for Skin Integrity Resource Kit, more commonly known as a CSI Resource Kit and 2. The presentation of intensive one day Promoting Healthy Skin “Train the Trainer” workshops in all capital cities and major regional towns across Australia Due to demand, the department agreed to fund a second round of workshops focussing on regional centres and the completion date was extended to accommodate the workshops. Later, the department also decided to host a departmental website for a number of clinical domains, including wound management, so that staff from the residential aged care sector had easy access to a central repository of helpful clinical resource material that could be used for improving the health and wellbeing of their older adults, consumers and carers. CSI Resource Kit Upgrade and Distribution: At the start of the project, a full evidence review was carried out on the material produced during the EBPRAC-CSI Stage 1 project and the relevant evidence based changes were made to the documentation. At the same time participants in the EBPRAC-CSI Stage 1 project were interviewed for advice on how to improve the resource material. Following this the documentation, included in the kit, was sent to independent experts for peer review. When this process was finalised, a learning designer and QUT’s Visual Communications Services were engaged to completely refine and update the design of the resources, and combined resource kit with the goal of keeping the overall size of the kit suitable for bookshelf mounting and the cost at reasonable levels. Both goals were achieved in that the kit is about the same size as a 25 mm A4 binder and costs between $19.00 and $28.00 per kit depending on the size of the print run. The dissemination of the updated CSI resource kit was an outstanding success. Demand for the kits was so great that a second print run of 2,000 kits was arranged on top of the initial print run of 4,000 kits. All RACFs across Australia were issued with a kit, some 2,740 in total. Since the initial distribution another 1,100 requests for kits has been fulfilled as well as 1,619 kits being distributed to participants at the Promoting Healthy Skin workshops. As the project was winding up a final request email was sent to all workshop participants asking if they required additional kits or resources to distribute the remaining kits and resources. This has resulted in requests for 200 additional kits and resources. Feedback from the residential aged care sector and other clinical providers who have interest in wound care has been very positive regarding the utility of the kit, (see Appendix 4). Promoting Healthy Skin Workshops The workshops also exceeded the project team’s initial objective. Our goal of providing workshop training for staff from one in four facilities and 450 participants was exceeded, with overwhelming demand for workshop places resulting in the need to provide a second round of workshops across Australia. At the completion of the second round, 37 workshops had been given, with 1286 participants, representing 835 facilities. A number of strategies were used to promote the workshops ranging from invitations included in the kit, to postcard mail-outs, broadcast emailing to all facilities and aged care networks and to articles and paid advertising in aged care journals. The most effective method, by far, was directly phoning the facilities. This enabled the caller to contact the relevant staff member and enlist their support for the workshop. As this is a labour intensive exercise, it was only used where numbers needed bolstering, with one venue rising from 3 registrants before the calls to 53 registrants after. The workshops were aimed at staff who had the interest and the capability of implementing evidence-based wound management within their facility or organisation. This targeting was successful in that a large proportion (68%) of participants were Registered Nurses, Nurse Managers, Educators or Consultants. Twenty percent were Endorsed Enrolled Nurses with the remaining 12% being made up of Personal Care Workers or Allied Health Professionals. To facilitate long term sustainability, the workshop employed train-the-trainer strategies. Feedback from the EBPRAC-CSI Stage 1 interviews was used in the development of workshop content. In addition, feedback from the workshop conducted at the end of the EBPRAC-CSI Stage 1 project suggested that change management and leadership training should be included in the workshops. The program was trialled in the first workshop conducted in Brisbane and then rolled out across Australia. Participants were asked to complete pre and post workshop surveys at the beginning and end of the workshop to determine how knowledge and confidence improved over the day. Results from the pre and post surveys showed significant improvements in the level of confidence in attendees’ ability to implement evidence based wound management. The results also indicated a significant increase in the level of confidence in ability to implement change within their facility or organisation. This is an important indication that the inclusion of change management/leadership training with clinical instruction can increase staff capacity and confidence in translating evidence into practice. To encourage the transfer of the evidence based content of the workshop into practice, participants were asked to prepare an Action Plan to be followed by a simple one page progress report three months after the workshop. These reports ranged from simple (e.g. skin moisturising to prevent skin tears), to complex implementation plans for introducing the CSI model across the whole organisation. Outcomes described in the project reports included decreased prevalence of skin tears, pressure injuries and chronic wounds, along with increased staff and resident knowledge and resident comfort. As stated above, some organisations prepared large, complex plans to roll out the CSI model across their organisation. These plans included a review of the organisation’s wound care system, policies and procedures, the creation of new processes, the education of staff and clients, uploading education and resource material onto internal electronic platforms and setting up formal review and evaluation processes. The CSI Resources have been enthusiastically sought and incorporated into multiple health care settings, including aged care, acute care, Medicare Local intranets (e.g. Map of Medicine e-pathways), primary health care, community and home care organisations, education providers and New Zealand aged and community health providers. Recommendations: Recommendations for RACFs, aged care and health service providers and government  Skin integrity and the evidence-practice gap in this area should be recognised as a major health issue for health service providers for older adults, with wounds experienced by up to 50% of residents in aged care settings (Edwards et al. 2010). Implementation of evidence based wound care through the Champions for Skin Integrity model in this and the pilot project has demonstrated the prevalence of wounds, wound healing times and wound infections can be halved.  A national program and Centre for Evidence Based Wound Management should be established to: - expand the reach of the model to other aged care facilities and health service providers for older adults - sustain the uptake of models such as the Champions for Skin Integrity (CSI) model - ensure current resources, expertise and training are available for consumers and health care professionals to promote skin integrity for all older adults  Evidence based resources for the CSI program and similar projects should be reviewed and updated every 3 – 4 years as per NH&MRC recommendations  Leadership and change management training is fundamental to increasing staff capacity, at all levels, to promote within-organisation dissemination of skills and knowledge gained from projects providing evidence based training Recommendations for future national dissemination projects  A formal program of opportunities for small groups of like projects to share information and resources, coordinate activities and synergise education programs interactively would benefit future national dissemination projects - Future workshop programs could explore an incentive program to optimise attendance and reduce ‘no shows’ - Future projects should build in the capacity and funding for increased follow-up with workshop attendees, to explore the reasons behind those who are unable to translate workshop learnings into the workplace and identify factors to address these barriers.