130 resultados para Reengineering


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper analyses the reengineering concept as it comes from software engineering and management fields. We combine two viewpoints and apply them to solve a problem of reengineering of a distance study system, in general, and the unit of learning, in particular. We propose a framework for reengineering of unit of learning, based on general model of software reengineering, and present a case study, in which we describe, how one topic of distance study course was reengineered, considering triple consistency principle and requirements for computer science. The proposed framework contributes to increasing quality, effectiveness and systematization of delivering distance studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Interval Temporal Logic provides time-dependant formal description of hardware and software. Such formalism is needed for description of behaviors of the middleware of AOmLE project, depending on different scenarios of operation. In order to use ITL, we need an interpreter. Tempura provides executable ITL framework, written in C language. We cannot use Tempura as is, because AOmLE is developed entirely in Java. For this reason we need Java version of Tempura. This paper describes our plan for reengineering of CTempura and creating Java version if the ITL interpreter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Тодор П. Чолаков, Димитър Й. Биров - Тази статия представя цялостен модел за автоматизиран реинженеринг на наследени системи. Тя описва в детайли процесите на превод на софтуера и на рефакторинг и степента, до която могат да се автоматизират тези процеси. По отношение на превода на код се представя модел за автоматизирано превеждане на код, съдържащ указатели и работа с адресна аритметика. Също така се дефинира рамка за процеса на реинженеринг и се набелязват възможности за по-нататъшно развитие на концепции, инструменти и алгоритми.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Business Process Management (BPM) has been identified as the number one business priority by a recent Gartner study (Gartner, 2005). However, BPM has a plethora of facets as its origins are in Business Process Reengineering, Process Innovation, Process Modelling, and Workflow Management to name a few. Organisations increasingly recognize the requirement for an increased process orientation and require appropriate comprehensive frameworks, which help to scope and evaluate their BPM initiative. This research project aims toward the development of a holistic and widely accepted BPM maturity model, which facilitates the assessment of BPM capabilities. This paper provides an overview about the current model with a focus on the actual model development utilizing a series of Delphi studies. The development process includes separate studies that focus on further defining and expanding the six core factors within the model, i.e. strategic alignment, governance, method, Information Technology, people and culture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Automation technology can provide construction firms with a number of competitive advantages. Technology strategy guides a firm's approach to all technology, including automation. Engineering management educators, researchers, and construction industry professionals need improved understanding of how technology affects results, and how to better target investments to improve competitive performance. A more formal approach to the concept of technology strategy can benefit the construction manager in his efforts to remain competitive in increasingly hostile markets. This paper recommends consideration of five specific dimensions of technology strategy within the overall parameters of market conditions, firm capabilities and goals, and stage of technology evolution. Examples of the application of this framework in the formulation of technology strategy are provided for CAD applications, co-ordinated positioning technology and advanced falsework and formwork mechanisation to support construction field operations. Results from this continuing line of research can assist managers in making complex and difficult decisions regarding reengineering construction processes in using new construction technology and benefit future researchers by providing new tools for analysis. Through managing technology to best suit the existing capabilities of their firm, and addressing the market forces, engineering managers can better face the increasingly competitive environment in which they operate.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In an environment where economic, political and technological change is the rule, a fundamental business strategy should be the defence of traditional markets and thoughtful entry into new markets, with an aim to increase market penetration and stimulate profit. The success of such a strategy will depend on the success of firms to do more and better for customers than their competitors. In other words, the firm’s primary competitive advantage will come from changes they implement to please their customers. In the construction industry, complexity of technical knowledge and construction processes have traditionally encouraged clients to play a largely passive role in the management of their project. However, today’s clients not only want to know about internal efficiency of their projects but also need to know how they and their contractors compare and compete against their competitors. Given the vulnerability of construction activities in the face of regional financial crisis, constructors need to be proactive in the search to improve their internal firm and project processes to ensure profitability and market responsiveness. In this context, reengineering is a radical design that emphasises customer satisfaction rather than cost reduction This paper discusses the crucial role of the client-project interface and how project networks could facilitate and improve information dissemination and sharing, collaborative efforts, decision-making and improved project climate. An intra-project network model is presented, and project managers’ roles and competencies in forming and coordinating project workgroups is discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper describes and analyses the procurement processes employed in delivering the Sydney Olympic Stadium – arguably the most significant stadia project in the region today. This current high profile project is discussed in terms of a case study into the procurement processes used. Interviews, personal site visits and questionnaires were used to obtain information on the procurement processes used and comments on their application to the project. The alternative procurement process used on this project—Design and Construction within a Build, Own, Operate and Transfer (BOOT) project—is likely to impact on the construction industry as a whole. Already other projects and sectors are following this lead. Based on a series of on-site interviews and questionnaires, a series of benefits and drawbacks to this procurement strategy are provided.The Olympic Stadium project has also been further analysed during construction through a Degree of Interaction framework to determine anticipated project success. This analysis investigates project interaction and user satisfaction to provide a comparable rating. A series of questionnaires were used to collect data to calculate the Degree of Interaction and User Satisfaction ratings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Management of change in construction organisations to capture internal knowledge and maximise innovation is central to construction process re-engineering. Recent international trends toward privatisation and outsourcing of many government functions has seen wholesale changes to the role of government departments. In Brisbane, Australia, the Port of Brisbane Corporation has responsibilities for development and maintenance of all port and harbour facilities in the Brisbane region. The PBC is an acknowledged leader in encouraging internal technical development. Yet 20 years ago, this organisation operated as a small division within a large and bureaucratic Queensland Government public service department. This paper reviews construction project procurement strategies for the port’s civil and structural facilities since a separate organisational entity with responsibilities for Port of Brisbane was formed in 1976. The Port of Brisbane Corporation serves as an initial case study setting for a larger research project studying innovative practices in the context of the trend towards corporatising and privatising public sector organisations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy. Two central objectives structure this Case Study: 1. Identify categories of important information generated by the Building Division, Queensland Department of Public Works in its service delivery to internal and external stake-holders, and 2. Formulate an appropriate and targeted Knowledge Management Strategy to meet the needs of the Queensland Building Capital Works program. The structure of this paper includes: *Description of the Queensland construction industry setting *Review the relevant literature *Design an appropriate research methodology *Analyse results *Formulate conclusions, contributions and implications of the targeted strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Competitive markets are increasingly driving new initiatives for shorter cycle times resulting in increased overlapping of project phases. This, in turn, necessitates improving the interfaces between the different phases to be overlapped (integrated), thus allowing transfer of processes, information and knowledge from one individual or team to another. This transfer between phases, within and between projects, is one of the basic challenges to the philosophy of project management. To make the process transfer more transparent with minimal loss of momentum and project knowledge, this paper draws upon Total Quality Management (TQM) and Business Process Re-engineering (BPR) philosophies to develop a Best Practice Model for managing project phase integration. The paper presents the rationale behind the model development and outlines its two key parts; (1) Strategic Framework and (2) Implementation Plan. Key components of both the Strategic Framework and the Implementation Plan are presented and discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Conceptual modeling is an important tool for understanding and revealing weaknesses of business processes. Yet, the current practice in reengineering projects often considers simply the as-is process model as a brain-storming tool. This approach heavily relies on the intuition of the participants and misses a clear description of the quality requirements. Against this background, we identify four generic quality categories of business process quality, and populate them with quality requirements from related research. We refer to the resulting framework as the Quality of Business Process (QoBP) framework. Furthermore, we present the findings from applying the QoBP framework in a case study with a major Australian bank, showing that it helps to systematically fill the white space between as-is and to-be process modeling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Staphylococcus aureus agr quorum-sensing system plays a major role in the transition from the persistent to the virulent phenotype. S. aureus agr type I to IV strains are characterized by mutations in the sensor domain of the histidine kinase AgrC and differences in the sequences of the secreted autoinducing peptides (AIP). Here we demonstrate that interactions between the cytosolic domain of AgrC (AgrC(Cyto)) and the response regulator domain of AgrA (AgrA(RR)) dictate the spontaneity of the cellular response to AIP stimuli. The crystal structure of AgrC(Cyto) provided a basis for a mechanistic model of AgrC-AgrA interactions. This model enabled an analysis of the biochemical and biophysical parameters of AgrC-AgrA interactions in the context of the conformational features of the AgrC-AgrA complex. This analysis revealed distinct sequence and conformational features that determine the affinity, specificity, and kinetics of the phosphotransfer reaction. This step, which governs the response time for transcriptional reengineering triggered by an AIP stimulus, is independent of the agr type and similar for agonist and antagonist stimuli. These experimental data could serve as a basis on which to validate simulations of the quorum-sensing response and for strategies that employ the agr quorum-sensing system to combat biofilm formation in S. aureus infections.