940 resultados para RADIAL-DISTRIBUTION SYSTEMS
Resumo:
Energy Resources Management can play a very relevant role in future power systems in SmartGrid context, with high penetration of distributed generation and storage systems. This paper deals with the importance of resources management in incident situation. The system to consider a high penetration of distributed generation, demand response, storage units and network reconfiguration. A case study evidences the advantages of using a flexible SCADA to control the energy resources in incident situation.
Multi-criteria optimisation approach to increase the delivered power in radial distribution networks
Resumo:
This study proposes a new methodology to increase the power delivered to any load point in a radial distribution network, through the identification of new investments in order to improve the repair time. This research work is innovative and consists in proposing a full optimisation model based on mixed-integer non-linear programming considering the Pareto front technique. The goal is to achieve a reduction in repair times of the distribution networks components, while minimising the costs of that reduction as well as non-supplied energy costs. The optimisation model considers the distribution network technical constraints, the substation transformer taps, and it is able to choose the capacitor banks size. A case study based on a 33-bus distribution network is presented in order to illustrate in detail the application of the proposed methodology.
Resumo:
Distribution systems, eigenvalue analysis, nodal admittance matrix, power quality, spectral decomposition
Resumo:
Fault location has been studied deeply for transmission lines due to its importance in power systems. Nowadays the problem of fault location on distribution systems is receiving special attention mainly because of the power quality regulations. In this context, this paper presents an application software developed in Matlabtrade that automatically calculates the location of a fault in a distribution power system, starting from voltages and currents measured at the line terminal and the model of the distribution power system data. The application is based on a N-ary tree structure, which is suitable to be used in this application due to the highly branched and the non- homogeneity nature of the distribution systems, and has been developed for single-phase, two-phase, two-phase-to-ground, and three-phase faults. The implemented application is tested by using fault data in a real electrical distribution power system
Resumo:
This paper focus on the problem of locating single-phase faults in mixed distribution electric systems, with overhead lines and underground cables, using voltage and current measurements at the sending-end and sequence model of the network. Since calculating series impedance for underground cables is not as simple as in the case of overhead lines, the paper proposes a methodology to obtain an estimation of zero-sequence impedance of underground cables starting from previous single-faults occurred in the system, in which an electric arc occurred at the fault location. For this reason, the signal is previously pretreated to eliminate its peaks voltage and the analysis can be done working with a signal as close as a sinus wave as possible
Resumo:
Finnish food producers' trade with Russia has experienced profound changes since the collapse of the Soviet Union. Simultaneously, the distribution systems of foodstuffs have changed remarkably. This study sheds some light into these changes and analyses the current situation in distribution systems of foodstuffs in Russia. In addition, the study discusses the possibilities of Finnish food producers to get more of their products to the shelves of Russian food retail stores. Before the 1998 financial crisis, the import of foreign foodstuffs was booming in Russia due to the overvalued rouble. As a result of the financial crisis, food import collapsed. The export of Finnish foodstuffs to Russia has been slowly recovering during the past few years, but in the most important product categories the pre-crisis levels have so far not been reached and maybe will not be reached. In certain product categories the growth has been only marginal. It seems that starting localproduction will become increasingly important in the future. This is further encouraged by the fact that Russian consumers favour domestic food products. Russian consumers are very price conscious and demand quality in food products. The perceived price-quality ratio is an important criterion in the purchase decision.The majority of foodstuff retail is still conducted via unorganised forms of trade (e.g. kiosks and marketplaces) but modern retail chains are developing at a fast pace in Russia. They are also expected to dominate the retail trade in foodstuffs over the unorganised forms of trade in the future. This will change the distribution systems as well. The retail chains are trying to shorten the distribution chain, similarly to what has been seen in the Western countries. This together with the strengthening of retail chains is likely to shrink the role of wholesalers, as the chains increasingly want to work directly with the producers. Many large retail chains are acquiring or have already acquired a distribution centre or centres in order to boost efficiency and control the flow of products. The strengthening of the retail chains also gives them power in negotiations, which the producers and distributors have to adjust to. For example store entry fees and retail chains' own private label products pose challenges to the food producers. In the food production sector the competition is fierce, as large Russianand foreign producers want to ensure their piece of the market. The largest producers utilise their size: they invest in big marketing campaigns and are willing to pay high entry fees to retail chains in order to secure a place on the store shelves and to build a strong brand in Russia. This complicates the situation from the viewpoint of small producers. Currently, the most popular type of distribution system among the interviewed Finnish food producers is based on a network of local distributors. There is, however, a strong consensus on the importanceof starting local production in order to be a serious actor in Russia in the future. Factors that hinder the starting of local production include the lack of local infrastructure and qualified staff, and the low risk tolerance of Finnish firms. Major barriers for entry in Russia are the actions of authorities, fierce competition, fragmented market and Finnish producers' heavy production costs. The suggested strategies for increasing the market share include focusing geographically or segment-wise, introducing new products, starting local production, andcooperation between Finnish producers. Smallness was one reason why Finnish producers had to cut down their operations in Russia due to the 1998 crisis. Smaller producers had fewer resources to tolerate losses during the period of crisis. Smallness is reflected also on trade negotiations with retail chains and distributors. It makes it harder to cope with the store entry fees and to differentiatefrom the mass of products propped up by expensive advertising. Finally, it makes it harder for Finnish producers to start or expand local production, as it is more difficult for a small producer to get financing and to tolerate the increased risks. Compensating for the smallness might become the crucial factor determining the future success of Finnish food producers in the Russian market.
Resumo:
This paper focus on the problem of locating single-phase faults in mixed distribution electric systems, with overhead lines and underground cables, using voltage and current measurements at the sending-end and sequence model of the network. Since calculating series impedance for underground cables is not as simple as in the case of overhead lines, the paper proposes a methodology to obtain an estimation of zero-sequence impedance of underground cables starting from previous single-faults occurred in the system, in which an electric arc occurred at the fault location. For this reason, the signal is previously pretreated to eliminate its peaks voltage and the analysis can be done working with a signal as close as a sinus wave as possible
Resumo:
Fault location has been studied deeply for transmission lines due to its importance in power systems. Nowadays the problem of fault location on distribution systems is receiving special attention mainly because of the power quality regulations. In this context, this paper presents an application software developed in Matlabtrade that automatically calculates the location of a fault in a distribution power system, starting from voltages and currents measured at the line terminal and the model of the distribution power system data. The application is based on a N-ary tree structure, which is suitable to be used in this application due to the highly branched and the non- homogeneity nature of the distribution systems, and has been developed for single-phase, two-phase, two-phase-to-ground, and three-phase faults. The implemented application is tested by using fault data in a real electrical distribution power system
Resumo:
Air distribution systems are one of the major electrical energy consumers in air-conditioned commercial buildings which maintain comfortable indoor thermal environment and air quality by supplying specified amounts of treated air into different zones. The sizes of air distribution lines affect energy efficiency of the distribution systems. Equal friction and static regain are two well-known approaches for sizing the air distribution lines. Concerns to life cycle cost of the air distribution systems, T and IPS methods have been developed. Hitherto, all these methods are based on static design conditions. Therefore, dynamic performance of the system has not been yet addressed; whereas, the air distribution systems are mostly performed in dynamic rather than static conditions. Besides, none of the existing methods consider any aspects of thermal comfort and environmental impacts. This study attempts to investigate the existing methods for sizing of the air distribution systems and proposes a dynamic approach for size optimisation of the air distribution lines by taking into account optimisation criteria such as economic aspects, environmental impacts and technical performance. These criteria have been respectively addressed through whole life costing analysis, life cycle assessment and deviation from set-point temperature of different zones. Integration of these criteria into the TRNSYS software produces a novel dynamic optimisation approach for duct sizing. Due to the integration of different criteria into a well- known performance evaluation software, this approach could be easily adopted by designers in busy nature of design. Comparison of this integrated approach with the existing methods reveals that under the defined criteria, system performance is improved up to 15% compared to the existing methods. This approach is interpreted as a significant step forward reaching to the net zero emission building in future.
Resumo:
The objective of this article is to review the scientific literature on airflow distribution systems and ventilation effectiveness to identify and assess the most suitable room air distribution methods for various spaces. In this study, different ventilation systems are classified according to specific requirements and assessment procedures. This study shows that eight ventilation methods have been employed in the built environment for different purposes and tasks. The investigation shows that numerous studies have been carried out on ventilation effectiveness but few studies have been done regarding other aspects of air distribution. Amongst existing types of ventilation systems, the performance of each ventilation methods varies from one case to another due to different usages of the ventilation system in a room and the different assessment indices used. This review shows that the assessment of ventilation effectiveness or efficiency should be determined according to each task of the ventilation system, such as removal of heat, removal of pollutant, supply fresh air to the breathing zone or protecting the occupant from cross infection. The analysis results form a basic framework regarding the application of airflow distribution for the benefit of designers, architects, engineers, installers and building owners.
Resumo:
Recently, it has been proposed that there are two type Ia supernova progenitors: short-lived and long-lived. On the basis of this idea, we develop a theory of a unified mechanism for the formation of the bimodal radial distribution of iron and oxygen in the Galactic disc. The underlying cause for the formation of the fine structure of the radial abundance pattern is the influence of the spiral arms, specifically the combined effect of the corotation resonance and turbulent diffusion. From our modelling, we conclude that in order to explain the bimodal radial distributions simultaneously for oxygen and iron and to obtain approximately equal total iron output from different types of supernovae, the mean ejected iron mass per supernova event should be the same as quoted in the literature if the maximum mass of stars, which eject heavy elements, is 50 M(circle dot). For the upper mass limit of 70 M(circle dot), the production of iron by a type II supernova explosion should increase by about 1.5 times.
Resumo:
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination vertices. Each selected link must receive one of two types of edge facilities and the connection of different edge facilities requires a costly and capacitated vertex facility. We propose a hybrid decomposition approach which heuristically obtains tentative solutions for the vertex facilities number and location and use these solutions to limit the computational burden of a branch-and-cut algorithm. We test our method on instances of the power system secondary distribution network design problem. The results show that the method is efficient both in terms of solution quality and computational times. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
Most of water distribution systems (WDS) need rehabilitation due to aging infrastructure leading to decreasing capacity, increasing leakage and consequently low performance of the WDS. However an appropriate strategy including location and time of pipeline rehabilitation in a WDS with respect to a limited budget is the main challenge which has been addressed frequently by researchers and practitioners. On the other hand, selection of appropriate rehabilitation technique and material types is another main issue which has yet to address properly. The latter can affect the environmental impacts of a rehabilitation strategy meeting the challenges of global warming mitigation and consequent climate change. This paper presents a multi-objective optimization model for rehabilitation strategy in WDS addressing the abovementioned criteria mainly focused on greenhouse gas (GHG) emissions either directly from fossil fuel and electricity or indirectly from embodied energy of materials. Thus, the objective functions are to minimise: (1) the total cost of rehabilitation including capital and operational costs; (2) the leakage amount; (3) GHG emissions. The Pareto optimal front containing optimal solutions is determined using Non-dominated Sorting Genetic Algorithm NSGA-II. Decision variables in this optimisation problem are classified into a number of groups as: (1) percentage proportion of each rehabilitation technique each year; (2) material types of new pipeline for rehabilitation each year. Rehabilitation techniques used here includes replacement, rehabilitation and lining, cleaning, pipe duplication. The developed model is demonstrated through its application to a Mahalat WDS located in central part of Iran. The rehabilitation strategy is analysed for a 40 year planning horizon. A number of conventional techniques for selecting pipes for rehabilitation are analysed in this study. The results show that the optimal rehabilitation strategy considering GHG emissions is able to successfully save the total expenses, efficiently decrease the leakage amount from the WDS whilst meeting environmental criteria.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)