Multi-criteria optimisation approach to increase the delivered power in radial distribution networks
Data(s) |
07/01/2016
07/01/2016
01/08/2015
|
---|---|
Resumo |
This study proposes a new methodology to increase the power delivered to any load point in a radial distribution network, through the identification of new investments in order to improve the repair time. This research work is innovative and consists in proposing a full optimisation model based on mixed-integer non-linear programming considering the Pareto front technique. The goal is to achieve a reduction in repair times of the distribution networks components, while minimising the costs of that reduction as well as non-supplied energy costs. The optimisation model considers the distribution network technical constraints, the substation transformer taps, and it is able to choose the capacitor banks size. A case study based on a 33-bus distribution network is presented in order to illustrate in detail the application of the proposed methodology. |
Identificador |
http://hdl.handle.net/10400.22/7324 10.1049/iet-gtd.2014.1196 |
Idioma(s) |
eng |
Publicador |
IEEE |
Relação |
IET Generation, Transmission & Distribution;Vol. 9 Issue 16 http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=7337609 |
Direitos |
closedAccess |
Palavras-Chave | #Pareto optimisation #Cost reduction #Distribution networks #Integer programming #Investment #Nonlinear programming #Power capacitors #Substations #Transformers |
Tipo |
article |