996 resultados para Maintenance Decision
Resumo:
This article discusses the development of an Intelligent Distributed Environmental Decision Support System, built upon the association of a Multi-agent Belief Revision System with a Geographical Information System (GIS). The inherent multidisciplinary features of the involved expertises in the field of environmental management, the need to define clear policies that allow the synthesis of divergent perspectives, its systematic application, and the reduction of the costs and time that result from this integration, are the main reasons that motivate the proposal of this project. This paper is organised in two parts: in the first part we present and discuss the developed Distributed Belief Revision Test-bed — DiBeRT; in the second part we analyse its application to the environmental decision support domain, with special emphasis on the interface with a GIS.
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Electrotécnica e de Computadores
Resumo:
This paper deals with the problem of estimation maintenance costs for the case of the pitch controls system of wind farms turbines. Previous investigations have estimated these costs as (traditional) “crisp” values, simply ignoring the uncertainty nature of data and information available. This paper purposes an extended version of the estimation model by making use of the Fuzzy Set Theory. The results alert decision-makers to consequent uncertainty of the estimations along with their overall level, thus improving the information given to the mainte-nance support system.
Resumo:
This is a study of organisational decision making among senior civil servants in the Department of Health (DOH) in relation to the acceptance of methadone maintenance as a valid treatment modality for opiate misuse in Ireland. A qualitative strategy was adopted with an emergent design and grounded theory perspective. The data was collected using a naturalistic mode of inquiry and comprised of documentary analysis and semi-structured interviews. The aspects of decision making chosen for the study were: 1. Identifying the actors involved considering the heretofore dominant 'corporation sole' culture of the Irish public administration. 2. Identifying two (out of the myriad) processes involved in decision making. 3. Identifying what theoretical model(s) of decision making most closely approximates to this case. The findings were as follows: 1. Actors involved at all levels of the decision making could be identified, albeit with some difficulty. This as a result of the strategic management initiative. Previously, it may not have been possible. Stages or phases could not, in this case, be readily identified though limitations of this study may prove significant. 2. Both the processes selected in decision-making in this case were confirmed. Personal and professional support provided by peers and seniors is crucial to decision making. Decision making does occur within networks: these tend to be those that are formally appointed rather than informal ones. 3. The model closest to that of this case was that of incremental decision making within network settings.This resource was contributed by The National Documentation Centre on Drug Use.
Resumo:
The paper discusses maintenance challenges of organisations with a huge number of devices and proposes the use of probabilistic models to assist monitoring and maintenance planning. The proposal assumes connectivity of instruments to report relevant features for monitoring. Also, the existence of enough historical registers with diagnosed breakdowns is required to make probabilistic models reliable and useful for predictive maintenance strategies based on them. Regular Markov models based on estimated failure and repair rates are proposed to calculate the availability of the instruments and Dynamic Bayesian Networks are proposed to model cause-effect relationships to trigger predictive maintenance services based on the influence between observed features and previously documented diagnostics
Resumo:
This report documents Phase IV of the Highway Maintenance Concept Vehicle (HMCV) project, a pooled fund study sponsored by the Departments of Transportation of Iowa, Pennsylvania, and Wisconsin. This report provides the background, including a brief history of the earlier phases of the project, a systems overview, and descriptions of the research conducted in Phase IV. Finally, the report provides conclusions and recommendations for future research. Background The goal of the Highway Maintenance Concept Vehicle Pooled Fund Study is to provide travelers with the level of service defined by policy during the winter season at the least cost to taxpayers. This goal is to be accomplished by using information regarding actual road conditions to facilitate and adjust snow and ice control activities. The approach used in this study was to bring technology applications from other industries to the highway maintenance vehicle. This approach is evolutionary in that as emerging technologies and applications are found to be acceptable to the pooled fund states and as they appear that to have potential for supporting the study goals they become candidates for our research. The objective of Phase IV is to: Conduct limited deployment of selected technologies from Phase III by equipping a vehicle with proven advanced technologies and creating a mobile test laboratory for collecting road weather data. The research quickly pointed out that investments in winter storm maintenance assets must be based on benefit/cost analysis and related to improving level of service. For example, Iowa has estimated the average cost of fighting a winter storm to be about $60,000 to $70,000 per hour typically. The maintenance concept vehicle will have advanced technology equipment capable of applying precisely the correct amount of material, accurately tailored to the existing and predicted pavement conditions. Hence, a state using advanced technology could expect to have a noticeable impact on the average time taken to establish the winter driving service level. If the concept vehicle and data produced by the vehicle are used to support decision-making leading to reducing material usage and the average time by one hour, a reasonable benefit/cost will result. Data from the friction meter can be used to monitor and adjust snow and ice control activities and inform travelers of pavement surface conditions. Therefore, final selection of successfully performing technologies will be based on the foundation statements and criteria developed by the study team.
Resumo:
Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.
Resumo:
Most local agencies in Iowa currently make their pavement treatment decisions based on their limited experience due primarily to lack of a systematic decision-making framework and a decision-aid tool. The lack of objective condition assessment data of agency pavements also contributes to this problem. This study developed a systematic pavement treatment selection framework for local agencies to assist them in selecting the most appropriate treatment and to help justify their maintenance and rehabilitation decisions. The framework is based on an extensive literature review of the various pavement treatment techniques in terms of their technical applicability and limitations, meaningful practices of neighboring states, and the results of a survey of local agencies. The treatment selection framework involves three different steps: pavement condition assessment, selection of technically feasible treatments using decision trees, and selection of the most appropriate treatment considering the return-on-investment (ROI) and other non-economic factors. An Excel-based spreadsheet tool that automates the treatment selection framework was also developed, along with a standalone user guide for the tool. The Pavement Treatment Selection Tool (PTST) for Local Agencies allows users to enter the severity and extent levels of existing distresses and then, recommends a set of technically feasible treatments. The tool also evaluates the ROI of each feasible treatment and, if necessary, it can also evaluate the non-economic value of each treatment option to help determine the most appropriate treatment for the pavement. It is expected that the framework and tool will help local agencies improve their pavement asset management practices significantly and make better economic and defensible decisions on pavement treatment selection.
Resumo:
Industrial maintenance can be executed internally, acquired from the original equipment manufacturer or outsourced to a service provider, and this concludes in many different kind of business relationships. To maximize the total value in a maintenance business relationship it is important to know what the partner values. The value of maintenance services can be considered to consist of value elements and the perceived total value for the customer and the service provider is the sum of these value elements. The specific objectives of this thesis are to identify the most important value elements for the maintenance service customer and provider and also to recognize where the value elements differ. The study was executed as a statistical analysis using the survey method. The data has been collected by an online survey sent to 345 maintenance service professionals in Finland. In the survey, four different types of value elements were considered: the customer’s high critical and low critical items and the service provider’s core and support service. The most valued elements by the respondents were reliability, safety at work, environmental safety, and operator knowledge. The least valued elements were asset management factors and access to markets. Statistically significant differences in value elements between service types were also found. As a managerial implication a value gap profile is presented. This Master’s Thesis is part of the MaiSeMa (Industrial Maintenance Services in a Renewing Business Network: Identify, Model and Manage Value) research project where network decision models are created to identify, model and manage the value of maintenance services.
Resumo:
This study is a qualitative action research by its nature with elements of personal design in the form of a tangible model implementation framework construction. Utilized empirical data has been gathered via two questionnaires in relation to the arranged four workshop events with twelve individual participants. Five of them represented maintenance customers, three maintenance service providers and four equipment providers respectively. Further, there are two main research objectives in proportion to the two complementary focusing areas of this thesis. Firstly, the value-based life-cycle model, which first version has already been developed prior to this thesis, requires updating in order to increase its real-life applicability as an inter-firm decision-making tool in industrial maintenance. This first research objective is fulfilled by improving appearance, intelligibility and usability of the above-mentioned model. In addition, certain new features are also added. The workshop participants from the collaborating companies were reasonably pleased with made changes, although further attention will be required in future on the model’s intelligibility in particular as main results, charts and values were all reckoned as slightly hard to understand. Moreover, upgraded model’s appearance and added new features satisfied them the most. Secondly and more importantly, the premises of the model’s possible inter-firm implementation process need to be considered. This second research objective is delivered in two consecutive steps. At first, a bipartite open-books supported implementation framework is created and its different characteristics discussed in theory. Afterwards, the prerequisites and the pitfalls of increasing inter-organizational information transparency are studied in empirical context. One of the main findings was that the organizations are not yet prepared for network-wide information disclosure as dyadic collaboration was favored instead. However, they would be willing to share information bilaterally at least. Another major result was that the present state of companies’ cost accounting systems will definitely need implementation-wise enhancing in future since accurate and sufficiently detailed maintenance data is not available. Further, it will also be crucial to create supporting and mutually agreed network infrastructure. There are hardly any collaborative models, methods or tools currently in usage. Lastly, the essential questions about mutual trust and predominant purchasing strategies are cooperation-wise important. If inter-organizational activities are expanded, a more relational approach should be favored in this regard. Mutual trust was also recognized as a significant cooperation factor, but it is hard to measure in reality.
Resumo:
Mitochondria increase their outer and inner membrane permeability to solutes, protons and metabolites in response to a variety of extrinsic and intrinsic signaling events. The maintenance of cellular and intraorganelle ionic homeostasis, particularly for Ca2+, can determine cell survival or death. Mitochondrial death decision is centered on two processes: inner membrane permeabilization, such as that promoted by the mitochondrial permeability transition pore, formed across inner membranes when Ca2+ reaches a critical threshold, and mitochondrial outer membrane permeabilization, in which the pro-apoptotic proteins BID, BAX, and BAK play active roles. Membrane permeabilization leads to the release of apoptogenic proteins: cytochrome c, apoptosis-inducing factor, Smac/Diablo, HtrA2/Omi, and endonuclease G. Cytochrome c initiates the proteolytic activation of caspases, which in turn cleave hundreds of proteins to produce the morphological and biochemical changes of apoptosis. Voltage-dependent anion channel, cyclophilin D, adenine nucleotide translocase, and the pro-apoptotic proteins BID, BAX, and BAK may be part of the molecular composition of membrane pores leading to mitochondrial permeabilization, but this remains a central question to be resolved. Other transporting pores and channels, including the ceramide channel, the mitochondrial apoptosis-induced channel, as well as a non-specific outer membrane rupture may also be potential release pathways for these apoptogenic factors. In this review, we discuss the mechanistic models by which reactive oxygen species and caspases, via structural and conformational changes of membrane lipids and proteins, promote conditions for inner/outer membrane permeabilization, which may be followed by either opening of pores or a rupture of the outer mitochondrial membrane.
Resumo:
The importance of industrial maintenance has been emphasized during the last decades; it is no longer a mere cost item, but one of the mainstays of business. Market conditions have worsened lately, investments in production assets have decreased, and at the same time competition has changed from taking place between companies to competition between networks. Companies have focused on their core functions and outsourced support services, like maintenance, above all to decrease costs. This new phenomenon has led to increasing formation of business networks. As a result, a growing need for new kinds of tools for managing these networks effectively has arisen. Maintenance costs are usually a notable part of the life-cycle costs of an item, and it is important to be able to plan the future maintenance operations for the strategic period of the company or for the whole life-cycle period of the item. This thesis introduces an itemlevel life-cycle model (LCM) for industrial maintenance networks. The term item is used as a common definition for a part, a component, a piece of equipment etc. The constructed LCM is a working tool for a maintenance network (consisting of customer companies that buy maintenance services and various supplier companies). Each network member is able to input their own cost and profit data related to the maintenance services of one item. As a result, the model calculates the net present values of maintenance costs and profits and presents them from the points of view of all the network members. The thesis indicates that previous LCMs for calculating maintenance costs have often been very case-specific, suitable only for the item in question, and they have also been constructed for the needs of a single company, without the network perspective. The developed LCM is a proper tool for the decision making of maintenance services in the network environment; it enables analysing the past and making scenarios for the future, and offers choices between alternative maintenance operations. The LCM is also suitable for small companies in building active networks to offer outsourcing services for large companies. The research introduces also a five-step constructing process for designing a life-cycle costing model in the network environment. This five-step designing process defines model components and structure throughout the iteration and exploitation of user feedback. The same method can be followed to develop other models. The thesis contributes to the literature of value and value elements of maintenance services. It examines the value of maintenance services from the perspective of different maintenance network members and presents established value element lists for the customer and the service provider. These value element lists enable making value visible in the maintenance operations of a networked business. The LCM added with value thinking promotes the notion of maintenance from a “cost maker” towards a “value creator”.
Resumo:
Well managed information promotes competitive advantage and economic value for the company. The challenge is to use information effectively in complex networks. Decision making in network is complicated due to many independent sources of information. The aim of the present study was to identify and map the internal information flows and used information resourced by functions and roles, to make proposals to the case organization to improve the information management and to improve the situational awareness and process flows. In the present study, an inductive approach was applied, with the aim to find out gaps and bottlenecks of information flow of an aircraft maintenance organization and its network. The empirical part was conducted with observing the processes and with questionnaires. Theoretical part of this study consists on reviewing relevant literature on maintenance management in aviation and information management in aviation. Together with empirical evidence and the literature used in the study the gaps were found and suggestions for improvements were done. The outcome of this study contributes the organization in its bigger goal to improve the productivity. The information management of the network is one actor in the field and will pave the way to smoother operation and situational awareness. The lack of rules and requirements for information management and spreading is a challenge in information management. The excessive data overburden may cause problem in the actors’ situation-awareness due to non-availability of the right information.
Resumo:
The paper discusses maintenance challenges of organisations with a huge number of devices and proposes the use of probabilistic models to assist monitoring and maintenance planning. The proposal assumes connectivity of instruments to report relevant features for monitoring. Also, the existence of enough historical registers with diagnosed breakdowns is required to make probabilistic models reliable and useful for predictive maintenance strategies based on them. Regular Markov models based on estimated failure and repair rates are proposed to calculate the availability of the instruments and Dynamic Bayesian Networks are proposed to model cause-effect relationships to trigger predictive maintenance services based on the influence between observed features and previously documented diagnostics
Resumo:
In recent years, there has been an increasing interest in the adoption of emerging ubiquitous sensor network (USN) technologies for instrumentation within a variety of sustainability systems. USN is emerging as a sensing paradigm that is being newly considered by the sustainability management field as an alternative to traditional tethered monitoring systems. Researchers have been discovering that USN is an exciting technology that should not be viewed simply as a substitute for traditional tethered monitoring systems. In this study, we investigate how a movement monitoring measurement system of a complex building is developed as a research environment for USN and related decision-supportive technologies. To address the apparent danger of building movement, agent-mediated communication concepts have been designed to autonomously manage large volumes of exchanged information. In this study, we additionally detail the design of the proposed system, including its principles, data processing algorithms, system architecture, and user interface specifics. Results of the test and case study demonstrate the effectiveness of the USN-based data acquisition system for real-time monitoring of movement operations.