963 resultados para Engineering, Industrial|Engineering, System Science|Operations Research
Resumo:
Critical stage in open-pit mining is to determine the optimal extraction sequence of blocks, which has significant impacts on mining profitability. In this paper, a more comprehensive block sequencing optimisation model is developed for the open-pit mines. In the model, material characteristics of blocks, grade control, excavator and block sequencing are investigated and integrated to maximise the short-term benefit of mining. Several case studies are modeled and solved by CPLEX MIP and CP engines. Numerical investigations are presented to illustrate and validate the proposed methodology.
Resumo:
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.
Resumo:
Railways are an important mode of transportation. They are however large and complex and their construction, management and operation is time consuming and costly. Evidently planning the current and future activities is vital. Part of that planning process is an analysis of capacity. To determine what volume of traffic can be achieved over time, a variety of railway capacity analysis techniques have been created. A generic analytical approach that incorporates more complex train paths however has yet to be provided. This article provides such an approach. This article extends a mathematical model for determining the theoretical capacity of a railway network. The main contribution of this paper is the modelling of more complex train paths whereby each section can be visited many times in the course of a train’s journey. Three variant models are formulated and then demonstrated in a case study. This article’s numerical investigations have successively shown the applicability of the proposed models and how they may be used to gain insights into system performance.
Resumo:
Resource assignment and scheduling is a difficult task when job processing times are stochastic, and resources are to be used for both known and unknown demand. To operate effectively within such an environment, several novel strategies are investigated. The first focuses upon the creation of a robust schedule, and utilises the concept of strategically placed idle time (i.e. buffering). The second approach introduces the idea of maintaining a number of free resources at each time, and culminates in another form of strategically placed buffering. The attraction of these approaches is that they are easy to grasp conceptually, and mimic what practitioners already do in practice. Our extensive numerical testing has shown that these techniques ensure more prompt job processing, and reduced job cancellations and waiting time. They are effective in the considered setting and could easily be adapted for many real life problems, for instance those in health care. This article has more importantly demonstrated that integrating the two approaches is a better strategy and will provide an effective stochastic scheduling approach.
Resumo:
In the mining optimisation literature, most researchers focused on two strategic-level and tactical-level open-pit mine optimisation problems, which are respectively termed ultimate pit limit (UPIT) or constrained pit limit (CPIT). However, many researchers indicate that the substantial numbers of variables and constraints in real-world instances (e.g., with 50-1000 thousand blocks) make the CPIT’s mixed integer programming (MIP) model intractable for use. Thus, it becomes a considerable challenge to solve the large scale CPIT instances without relying on exact MIP optimiser as well as the complicated MIP relaxation/decomposition methods. To take this challenge, two new graph-based algorithms based on network flow graph and conjunctive graph theory are developed by taking advantage of problem properties. The performance of our proposed algorithms is validated by testing recent large scale benchmark UPIT and CPIT instances’ datasets of MineLib in 2013. In comparison to best known results from MineLib, it is shown that the proposed algorithms outperform other CPIT solution approaches existing in the literature. The proposed graph-based algorithms leads to a more competent mine scheduling optimisation expert system because the third-party MIP optimiser is no longer indispensable and random neighbourhood search is not necessary.
Resumo:
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints are considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times; equipment-assignment-dependent operational times; etc. The model also provides the availability and usage of equipment units at multiple operational stages such as drilling, blasting and excavating stages. The problem is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level.
Resumo:
This article focusses upon multi-modal transportation systems (MMTS) and the issues surrounding the determination of system capacity. For that purpose a multi-objective framework is advocated that integrates all the different modes and many different competing capacity objectives. This framework is analytical in nature and facilitates a variety of capacity querying and capacity expansion planning.
Resumo:
Changing the topology of a railway network can greatly affect its capacity. Railway networks however can be altered in a multitude of different ways. As each way has significant immediate and long term financial ramifications, it is a difficult task to decide how and where to expand the network. In response some railway capacity expansion models (RCEM) have been developed to help capacity planning activities, and to remove physical bottlenecks in the current railway system. The exact purpose of these models is to decide given a fixed budget, where track duplications and track sub divisions should be made, in order to increase theoretical capacity most. These models are high level and strategic, and this is why increases to the theoretical capacity is concentrated upon. The optimization models have been applied to a case study to demonstrate their application and their worth. The case study evidently shows how automated approaches of this nature could be a formidable alternative to current manual planning techniques and simulation. If the exact effect of track duplications and sub-divisions can be sufficiently approximated, this approach will be very applicable.
Resumo:
Hospitals are critical elements of health care systems and analysing their capacity to do work is a very important topic. To perform a system wide analysis of public hospital resources and capacity, a multi-objective optimization (MOO) approach has been proposed. This approach identifies the theoretical capacity of the entire hospital and facilitates a sensitivity analysis, for example of the patient case mix. It is necessary because the competition for hospital resources, for example between different entities, is highly influential on what work can be done. The MOO approach has been extensively tested on a real life case study and significant worth is shown. In this MOO approach, the epsilon constraint method has been utilized. However, for solving real life applications, with a large number of competing objectives, it was necessary to devise new and improved algorithms. In addition, to identify the best solution, a separable programming approach was developed. Multiple optimal solutions are also obtained via the iterative refinement and re-solution of the model.
Resumo:
Over the years, crystal engineering has transformed into a mature and multidisciplinary subject. New understanding, challenges, and opportunities have emerged in the design of complex structures and structure-property evaluation. Revolutionary pathways adopted by many leaders have shaped and directed this subject. In this short essay to celebrate the 60th birthday of Prof. Gautam R. Desiraju, we, his current research group members, contemplate the development of some of the topics explored by our group in the context of the overall subject. These topics, though not entirely new, are of significant interest to the crystal engineering community.
Resumo:
This study is about the analysis of some queueing models related to N-policy.The optimal value the queue size has to attain in order to turn on a single server, assuming that the policy is to turn on a single server when the queue size reaches a certain number, N, and turn him off when the system is empty.The operating policy is the usual N-policy, but with random N and in model 2, a system similar to the one described here.This study analyses “ Tandem queue with two servers”.Here assume that the first server is a specialized one.In a queueing system,under N-policy ,the server will be on vacation until N units accumulate for the first time after becoming idle.A modified version of the N-policy for an M│M│1 queueing system is considered here.The novel feature of this model is that a busy service unit prevents the access of new customers to servers further down the line.It is deals with a queueing model consisting of two servers connected in series with a finite intermediate waiting room of capacity k.Here assume that server I is a specialized server.For this model ,the steady state probability vector and the stability condition are obtained using matrix – geometric method.
Resumo:
People with disabilities have a right to a full life in every sense and one of those fundamental rights is the possibility to work. In this paper, the importance of social employment integration of disabled people is highlighted as one of the stakeholders to be satisfied by companies in the new framework that corporate social responsibility is constructing. The objective of the paper is to revise the benefits of some well-known operations research/management science tools that, if applied correctly, have a double positive impact on work accessibility and improved productivity. The responses collected from managers of Valencia`s ShelteredWork Centres for Disabled by means of a structured questionnaire are used to analyse the level of implementation of these tools and their impact depending on the type of centre, the kind of disability and other structural variables.
Resumo:
The complexity of power systems has increased in recent years due to the operation of existing transmission lines closer to their limits, using flexible AC transmission system (FACTS) devices, and also due to the increased penetration of new types of generators that have more intermittent characteristics and lower inertial response, such as wind generators. This changing nature of a power system has considerable effect on its dynamic behaviors resulting in power swings, dynamic interactions between different power system devices, and less synchronized coupling. This paper presents some analyses of this changing nature of power systems and their dynamic behaviors to identify critical issues that limit the large-scale integration of wind generators and FACTS devices. In addition, this paper addresses some general concerns toward high compensations in different grid topologies. The studies in this paper are conducted on the New England and New York power system model under both small and large disturbances. From the analyses, it can be concluded that high compensation can reduce the security limits under certain operating conditions, and the modes related to operating slip and shaft stiffness are critical as they may limit the large-scale integration of wind generation.