998 resultados para Bridge Project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian Research Council (ARC) Innovative Products Project aims to facilitate project innovation by exploring means to improve the diffusion of innovative products to road and bridge projects. It adopts a highly novel approach to achieve this end, developing three different ways of viewing the problem: (1) as a relational governance issue, (2) as an absorptive capacity issue and (3) as a knowlege intermediation issue. This report presents teh results of teh first phase of a three phase fieldwork program.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is part of a major project with a stimulus that rose from the need to manage a large number of ageing bridges in low traffic volume roads (LTVR) in Australia. The project investigated, designed and consequently constructed, involved replacing an ageing super-structure of a 10m span bridge with a disused Flat-bed Rail Wagon (FRW). This research, therefore, is developed on the premises that the FRW can be adopted as the main structural system for the bridges in LTVR network. The main focus of this research is to present two alternate deck wearing systems (DWS) as part of the design of the FRW as road bridge deck conforming to AS5100 (2004). The bare FRW structural components were first examined for their adequacy (ultimate and serviceability) in resisting the critical loads specified in AS5100(2004). Two options of DWSs were evaluated and their effects on the FRW examined. The first option involved usage of timber DWS; the idea of this option was to use all the primary and secondary members of the FRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option involved usage of reinforced concrete DWS with only the primary members of the FRW sharing the AS5100 (2004) loading. This option inherently minimised the risk associated with any uncertainty of the secondary members to their structural adequacy. This thesis reports the design phases of both options with conclusions of the selection of the ideal option for better structural performance, ease of construction and cost. The comparison carried out here focuses on the distribution of the traffic load by the FRW as a superstructure. Advantages and disadvantages highlighting cost comparisons and ease of constructability of the two systems are also included.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reviews innovation activity in a key service industry – road and bridge construction. Based on a large-scale Australian survey and descriptive statistics, the paper finds that there is little difference in innovation levels between different types of industry participants and that innovation is difficult to implement. The survey gathered responses from suppliers, consultants, contracts and clients and compared results across these four industry sectors. The absorptive capacity and relationship capacities of respondents were also investigated. One in five respondents had poor absorptive capacity. Suppliers were found to the most effective learners and were the best adopters of ideas from outside their organisations and consultants were the least effective. Australian construction organisations have relatively good relationship skills because relationship-based contracts are common compared to other countries. Indeed, the survey found that nearly 60% of respondents had experience with such contracts, with clients having more experience than the other three sectors. The results have implications for the measurement of innovation in project-based industries, and the relative roles of clients and suppliers in driving innovation in the construction industry. Further research will examine the extent to which particular governance mechanisms within relationship contracts lead to improved innovation and project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is a work-in-progress that articulates my research journey based on the development of a curriculum innovation in environmental education. This journey had two distinct, but intertwined phases: action research based fieldwork, conducted collaboratively, to create a whole school approach to environmental education curriculum planning; and a phase of analysis and reflection based on the emerging findings, as I sought to create personal "living educational theory" about change and innovation. A key stimulus for the study was the perceived theory-practice gap in environmental education, which is often presented in the literature as a criticism of teachers for failing to achieve the values and action objectives of critical environmental education. Hence, many programs and projects are considered to be superficial and inconsequential in terms of their ability to seriously address environmental issues. The intention of this study was to work with teachers in a project that would be an exemplar of critical environmental education. This would be in the form of a whole school "learnscaping" curriculum in a primary school whereby the schoolgrounds would be utilised for interdisciplinary critical environment education. Parallel with the three cycles of action research in this project, my research objectives were to identify and comment upon the factors that influence the generation of successful educational innovation. It was anticipated that the project would be a collaboration involving me, as researcher-facilitator, and many of the teachers in the school as active participants. As the project proceeded through its action cycles, however, it became obvious that the goal of developing a critical environmental education curriculum, and the use of highly participatory processes, were unrealistic. Institutional and organisational rigidities in education generally, teachers' day-to-day work demands, and the constant juggle of work, family and other responsibilities for all participants acted as significant constraints. Consequently, it became apparent that the learnscaping curriculum would not be the hoped-for exemplar. Progress was slow and, at times, the project was in danger of stalling permanently. While the curriculum had some elements of critical environmental education, these were minor and not well spread throughout the school. Overall, the outcome seemed best described as a "small win"; perhaps just another example of the theory-practice gap that I had hoped this project would bridge. Towards the project's end, however, my continuing reflection led to an exploration of chaos/complexity theory which gave new meaning to the concept of a "small win". According to this theory, change is not the product of linear processes applied methodically in purposeful and diligent ways, but emerges from serendipitous events that cannot be planned for, or forecast in advance. When this perspective of change is applied to human organisations - in this study, a busy school - the context for change is recognised not as a stable, predictable environment, but as a highly complex system where change happens all the time, cannot be controlled, and no one can be really sure where the impacts might lead. This so-called "butterfly effect" is a central idea of this theory where small changes or modifications are created - the effects of which are difficult to know, let alone determine - and which can have large-scale impacts. Allied with this effect is the belief that long term developments in an organisation that takes complexity into account, emerge by spontaneous self-organising evolution, requiring political interaction and learning in groups, rather than systematic progress towards predetermined goals or "visions". Hence, because change itself and the contexts of change are recognised as complex, chaos/complexity theory suggests that change is more likely to be slow and evolutionary - cultural change - rather than fast and revolutionary where the old is quickly ushered out by radical reforms and replaced by new structures and processes. Slow, small-scale changes are "normal", from a complexity viewpoint, while rapid, wholesale change is both unlikely and unrealistic. Therefore, the frustratingly slow, small-scale, imperfect educational changes that teachers create - including environmental education initiatives - should be seen for what they really are. They should be recognised as successful changes, the impacts of which cannot be known, but which have the potential to magnify into large-scale changes into the future. Rather than being regarded as failures for not meeting critical education criteria, "small wins" should be cause for celebration and support. The intertwined phases of collaborative action research and individual researcher reflection are mirrored in the thesis structure. The first three chapters, respectively, provide the thesis overview, the literature underpinning the study's central concern, and the research methodology. Chapters 4, 5, and 6 report on each of the three action research cycles of the study, namely Laying the Groundwork, Down to Work!, and The Never-ending Story. Each of these chapters presents a narrative of events, a literature review specific to developments in the cycle, and analysis and critique of the events, processes and outcomes of each cycle. Chapter 7 provides a synthesis of the whole of the study, outlining my interim propositions about facilitating curriculum change in schools through action research, and the implications of these for environmental education.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis developed a condition assessment and rating method to identify those bridges in a network which are in most need of repair for an effective life cycle management. The method estimates the contribution of critical factors towards bridge deterioration and uses structural analysis to overcome the subjectivity of traditional current condition assessment methods. This research was a part of the CRC project titled 'Life Cycle Management of Railway Bridges'. Efficient usage of resources and enhancing the safety and serviceability of railway bridges are the significant outcomes of using the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a research project aimed at examining the capabilities and challenges of two distinct but not mutually exclusive approaches to in-service bridge assessment: visual inspection and installed monitoring systems. In this study, the intended functionality of both approaches was evaluated on its ability to identify potential structural damage and to provide decision-making support. Inspection and monitoring are compared in terms of their functional performance, cost, and barriers (real and perceived) to implementation. Both methods have strengths and weaknesses across the metrics analyzed, and it is likely that a hybrid evaluation technique that adopts both approaches will optimize efficiency of condition assessment and ultimately lead to better decision making.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is an exploratory study to scrutinise Project Knowledge Management in Project-Based Organisations, specifically in the Project Management Office (PMO). It is the first attempt to investigate the maturity of Project Management, from a Knowledge Management perspective. The findings of this study address multiple Knowledge Management processes and practices to both assess the level of Knowledge Management Maturity in PMOs, and improve the capability of Project Knowledge Management in Project-based Organisations. This research significantly contributes to bridge the current gap in the existing Project Management Maturity Models.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The dissertation examines the foreign policies of the United States through the prism of science and technology. In the focal point of scrutiny is the policy establishing the International Institute for Applied Systems Analysis (IIASA) and the development of the multilateral part of bridge building in American foreign policy during the 1960s and early 1970s. After a long and arduous negotiation process, the institute was finally established by twelve national member organizations from the following countries: Bulgaria, Canada, Czechoslovakia, Federal Republic of Germany (FRG), France, German Democratic Republic (GDR), Great Britain, Italy, Japan, Poland, Soviet Union and United States; a few years later Sweden, Finland and the Netherlands also joined. It is said that the goal of the institute was to bring together researchers from East and West to solve pertinent problems caused by the modernization process experienced in industrialized world. It originates from President Lyndon B. Johnson s bridge building policies that were launched in 1964, and was set in a well-contested and crowded domain of other international organizations of environmental and social planning. Since the distinct need for yet another organization was not evident, the process of negotiations in this multinational environment enlightens the foreign policy ambitions of the United States on the road to the Cold War détente. The study places this project within its political era, and juxtaposes it with other international organizations, especially that of the OECD, ECE and NATO. Conventionally, Lyndon Johnson s bridge building policies have been seen as a means to normalize its international relations bilaterally with different East European countries, and the multilateral dimension of the policy has been ignored. This is why IIASA s establishment process in this multilateral environment brings forth new information on US foreign policy goals, the means to achieve these goals, as well as its relations to other advanced industrialized societies before the time of détente, during the 1960s and early 1970s. Furthermore, the substance of the institute applied systems analysis illuminates the differences between European and American methodological thinking in social planning. Systems analysis is closely associated with (American) science and technology policies of the 1960s, especially in its military administrative applications, thus analysis within the foreign policy environment of the United States proved particularly fruitful. In the 1960s the institutional structures of European continent with faltering, and the growing tendencies of integration were in flux. One example of this was the long, drawn-out process of British membership in the EEC, another is de Gaulle s withdrawal from NATO s military-political cooperation. On the other hand, however, economic cooperation in Europe between East and West, and especially with the Soviet Union was expanding rapidly. This American initiative to form a new institutional actor has to be seen in that structural context, showing that bridge building was needed not only to the East, but also to the West. The narrative amounts to an analysis of how the United States managed both cooperation and conflict in its hegemonic aspirations in the emerging modern world, and how it used its special relationship with the United Kingdom to achieve its goals. The research is based on the archives of the United States, Great Britain, Sweden, Finland, and IIASA. The primary sources have been complemented with both contemporary and present day research literature, periodicals, and interviews.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, a suggestion was made for the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With SAIL’s endeavor, a new digital project was born and this presentation describes its process, beginning to final product. The main source consulted for determining copyright clear publications was: Heckadon-Moreno. 2004. Naturalists on the Isthmus of Panama: A hundred years of natural history on the biological bridge of the Americas. 1st English ed. Smithsonian Tropical Research Institute, Panama City, Republic of Panama. (Document contains 26 slides)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this supplemental project was to collect invaluable data from the large-scale construction sites of Egnatia Odos motorway needed to validate a novel automated vision-tracking method created under the parent grant. For this purpose, one US graduate and three US undergraduate students traveled to Greece for 4 months and worked together with 2 Greek graduate students of the local faculty collaborator. This team of students monitored project activities and scheduled data collection trips on a daily basis, setup a mobile video data collection lab on the back of a truck, and drove to various sites every day to collect hundreds of hours of video from multiple cameras on a large variety of activities ranging from soil excavation to bridge construction. The US students were underrepresented students from minority groups who had never visited a foreign country. As a result, this trip was a major life experience to them. They learned how to live in a non-English speaking country, communicate with Greek students, workers and engineers. They lead a project in a very unfamiliar environment, troubleshoot myriad problems that hampered their progress daily and, above all, how to collaborate effectively and efficiently with other cultures. They returned to the US more mature, with improved leadership and problem-solving skills and a wider perspective of their profession.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A simple ac resistance bridge is proposed. The stability of the design is better than 10(-6), which is especially suitable for detecting tiny changes of resistance. An example of magnetoresistance measurement for a 220 nm Au film shows the good performance of the bridge. (C) 2009 American Institute of Physics. [DOI: 10.1063/1.3202284]

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introduction This proposal aims, through debate within symposium to explore the student experience of e-learning. The team facilitating the discussion will draw upon their experience of an HEA funded pathfinder project, the main aim of which was to collect learner stories about their experience of using technology in their everyday learning activities at the University of Greenwich across a range of programmes, levels, locations and student groups. Method The project design responded to the growing body of student voice literature and then utilised and built upon the JISC-funded studies that focussed on understanding the learner perspectives on the role of technology in learning, namely: • the LEX study which investigated a broad spectrum of technology use by eliciting rich data about learners’ feelings, beliefs and intentions towards e-learning (Creanor et al, 2006); • the LXP studies which explored disciplinary differences in uses of technology by university students through a variety of methodologies (Conole et al, 2006). Results The symposium will be organised as a round table discussion that will be structured into three sections: • Designing an online survey tool, and the results of our survey. • Exploring student stories. • What can learned from the project and taking the findings back to enhance learning. To stimulate discussion each section will start by asking the participants to discuss and debate a particular question, this will be followed by an interactive presentation by the respective member of the project team who will share the findings of the project and invite contributions to the resulting discussion from personal perspectives. The questions are: • What is effective learning within a context of digital technology? • What are the myths and truths about the identity of today's learners? • What practical changes need to happen in order to see real change? Conclusion The final section of the symposium will invite contributions from the participants in order to collate the views and perspectives of all the participants in order to focus the discussion on the following: • The issues that have arisen as a result of the round table debates. • New speculative approaches to enhancing the student experience. • A controversial stand to the future of Higher Education teaching and learning and the role and integration of technology within that education. The symposium will provide an opportunity to explore the predictive value of Student Experience of E-Learning Laboratory (SEEL) project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bridge weigh-in-motion (B-WIM), a system that uses strain sensors to calculate the weights of trucks passing on bridges overhead, requires accurate axle location and speed information for effective performance. The success of a B-WIM system is dependent upon the accuracy of the axle detection method. It is widely recognised that any form of axle detector on the road surface is not ideal for B-WIM applications as it can cause disruption to the traffic (Ojio & Yamada 2002; Zhao et al. 2005; Chatterjee et al. 2006). Sensors under the bridge, that is Nothing-on-Road (NOR) B-WIM, can perform axle detection via data acquisition systems which can detect a peak in strain as the axle passes. The method is often successful, although not all bridges are suitable for NOR B-WIM due to limitations of the system. Significant research has been carried out to further develop the method and the NOR algorithms, but beam-and-slab bridges with deep beams still present a challenge. With these bridges, the slabs are used for axle detection, but peaks in the slab strains are sensitive to the transverse position of wheels on the beam. This next generation B-WIM research project extends the current B-WIM algorithm to the problem of axle detection and safety, thus overcoming the existing limitations in current state-of–the-art technology. Finite Element Analysis was used to determine the critical locations for axle detecting sensors and the findings were then tested in the field. In this paper, alternative strategies for axle detection were determined using Finite Element analysis and the findings were then tested in the field. The site selected for testing was in Loughbrickland, Northern Ireland, along the A1 corridor connecting the two cities of Belfast and Dublin. The structure is on a central route through the island of Ireland and has a high traffic volume which made it an optimum location for the study. Another huge benefit of the chosen location was its close proximity to a nearby self-operated weigh station. To determine the accuracy of the proposed B-WIM system and develop a knowledge base of the traffic load on the structure, a pavement WIM system was also installed on the northbound lane on the approach to the structure. The bridge structure selected for this B-WIM research comprised of 27 pre-cast prestressed concrete Y4-beams, and a cast in-situ concrete deck. The structure, a newly constructed integral bridge, spans 19 m and has an angle of skew of 22.7°.