966 resultados para Multi-segment unit
Resumo:
New substation technology, such as non-conventional instrument transformers,and a need to reduce design and construction costs, are driving the adoption of Ethernet based digital process bus networks for high voltage substations. Protection and control applications can share a process bus, making more efficient use of the network infrastructure. This paper classifies and defines performance requirements for the protocols used in a process bus on the basis of application. These include GOOSE, SNMP and IEC 61850-9-2 sampled values. A method, based on the Multiple Spanning Tree Protocol (MSTP) and virtual local area networks, is presented that separates management and monitoring traffic from the rest of the process bus. A quantitative investigation of the interaction between various protocols used in a process bus is described. These tests also validate the effectiveness of the MSTP based traffic segregation method. While this paper focusses on a substation automation network, the results are applicable to other real-time industrial networks that implement multiple protocols. High volume sampled value data and time-critical circuit breaker tripping commands do not interact on a full duplex switched Ethernet network, even under very high network load conditions. This enables an efficient digital network to replace a large number of conventional analog connections between control rooms and high voltage switchyards.
Resumo:
To ensure the small-signal stability of a power system, power system stabilizers (PSSs) are extensively applied for damping low frequency power oscillations through modulating the excitation supplied to synchronous machines, and increasing interest has been focused on developing different PSS schemes to tackle the threat of damping oscillations to power system stability. This paper examines four different PSS models and investigates their performances on damping power system dynamics using both small-signal eigenvalue analysis and large-signal dynamic simulations. The four kinds of PSSs examined include the Conventional PSS (CPSS), Single Neuron based PSS (SNPSS), Adaptive PSS (APSS) and Multi-band PSS (MBPSS). A steep descent parameter optimization algorithm is employed to seek the optimal PSS design parameters. To evaluate the effects of these PSSs on improving power system dynamic behaviors, case studies are carried out on an 8-unit 24-bus power system through both small-signal eigenvalue analysis and large-signal time-domain simulations.
Resumo:
Aim: To determine the effects of an acute multi-nutrient supplement on physiological, performance and recovery responses to intermittent-sprint running and muscular damage during rugby union matches. Methods: Using a randomised, double-blind, cross-over design, twelve male rugby union players ingested either 75 g of a comprehensive multi-nutrient supplement (SUPP), [Musashi] or 1 g of a taste and carbohydrate matched placebo (PL) for 5 days pre-competition. Competitive rugby union game running performance was then measured using 1 Hz GPS data (SPI10, SPI elite, GPSports), in addition to associated blood draws, vertical jump assessments and ratings of perceived muscular soreness (MS) pre, immediately post and 24 h post-competition. Baseline (BL) GPS data was collected during six competition rounds preceding data collection. Results: No significant differences were observed between supplement conditions for all game running, vertical jump, and ratings of perceived muscular soreness. However, effect size analysis indicated SUPP ingestion increased 1st half very high intensity running (VHIR) mean speed (d = 0.93) and 2nd half relative distance (m/min) (d = 0.97). Further, moderate increases in 2nd half VHIR distance (d = 0.73), VHIR m/min (d = 0.70) and VHIR mean speed (d = 0.56) in SUPP condition were also apparent. Moreover, SUPP demonstrated significant increases in 2nd half dist m/min, total game dist m/min and total game HIR m/min compared with BL data (P < 0.05). Further, large ES increases in VHIR time (d = 0.88) and moderate increases in 2nd half HIR m/min (d = 0.65) and 2nd half VHIR m/min (d = 0.74) were observed between SUPP and BL. Post-game aspartate aminotransferase (AST) (d = 1.16) and creatine kinase (CK) (d = 0.97) measures demonstrated increased ES values with SUPP, while AST and CK values correlated with 2nd half VHIR distance (r = −0.71 and r = −0.76 respectively). Elevated c-reactive protein (CRP) was observed post-game in both conditions, however was significantly blunted with SUPP (P = 0.05). Additionally, pre-game (d = 0.98) and post-game (d = 0.96) increases in cortisol (CORT) were apparent with SUPP. No differences were apparent between conditions for pH, lactate, glucose, HCO3, vertical jump assessments and MS (P > 0.05). Conclusion: These findings suggest SUPP may assist in the maintenance of VHIR speeds and distances covered during rugby union games, possibly via the buffering qualities of SUPP ingredients (i.e. caffeine, creatine, bicarbonate). While the mechanisms for these findings are unclear, the similar pH between conditions despite additional VHIR during SUPP may support this conclusion. Finally, correlations between increased work completed at very high intensities and muscular degradation in SUPP conditions, may mask any anti-catabolic properties of supplementation.
Resumo:
This paper examines whether innovation in market design can address persistent problems of housing choice and affordability in the ageing inner and middle suburbs of Australian cities. Despite policy consensus that urban intensification of these low density, ‘greyfield’ areas should be able to deliver positive social, economic and environmental outcomes, existing models of development have not increased housing stock or delivered adequate gains in sustainability, affordability or diversity of dwellings in greyfield localities. We argue that application of smart market and matching market principles to the supply of multi-unit housing can unlock land, reduce development costs and improve design.
Resumo:
Objective(s): A new model of care for the management of patients with delirium was developed and evaluated. Method: A 4-bedded Close Observation Unit (COU) was introduced. The model comprised an education strategy for assistants in nursing (AIN), environmental adaptations and AIN to patient ratio of 1:4. Outcomes in all patients with delirium before and after introduction of the new model of care were compared. Results: 105 patients were admitted to COU, of whom 100 (95%) were diagnosed with delirium. In-hospital mortality improved after introduction of the unit (15% versus 5%; p=0.002) without significant change in length of stay, discharge destination or falls frequency. Conclusion: A dedicated unit for delirium management within medicine achieved a reduction in mortality.
Resumo:
The first year of a property degree program is a time to establish threshold concept knowledge to acculturise students into their discipline or professional group. Due to the foundational nature of first year in many property degrees, students are enrolled in large, multi-disciplinary classes. There are several challenges in the delivery of large first year multi-disciplinary units to engage the student in a community of leaning to aid in student retention. Through action based research this study shows how social networking, particularly Facebook, can be used to create a sense of community across large, multi-disciplinary units to illicit ‘real time’ feedback from students and encourage peer to peer learning. This study assesses the benefits of using social media and considers the potential limitations of this medium.
Resumo:
A new set of primitive extraterrestrial materials collected in the Earth's stratosphere include Chondritic Porous Aggregates (CPA's) [1]. CPAs have a complex and variable mineralogy [1-3] that include 'organic compounds' [4,5] and poorly graphitised carbon (PGC)[6]. This study presents a continuation of our detailed Analytical Electron Microscope study on carbon-rich CPA W7029*A from the JSC Cosmic Dust Collection. This CPA is an uncontaminated sample that survived atmospheric entry without appreciable alteration [7] and which contains ~44% carbonaceous material. The carbonaceous composition of selected particles was confirmed by Electron Energy Loss Spectroscopy and Selected Area Electron Diffraction (SAED). Possible carbonaceous contaminants introduced by specimen preparation techniques are easily recognised from indigenous CPA carbon particles [8] and do not bias our interpretations.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Introduction: Improving physical and cognitive functioning is a key objective of multi-disciplinary inpatient geriatric rehabilitation. Outcomes relevant to minimum functional ability required for older adults to successfully participate in the community have been reported. However, there has been little investigation reporting outcomes of older inpatients receiving multi-disciplinary rehabilitation being discharged home from geriatric rehabilitation units. This study aims to investigate characteristics and physical and cognitive outcomes of this cohort. Method: The Princess Alexandra Hospital Geriatric and Rehabilitation Unit is the largest rehabilitation unit in Queensland. Multidisciplinary health professionals enter admission and discharge functional and clinical outcomes along with demographic information into a purpose designed database for all patients. Data collected between 2005 and 2011 was analysed using descriptive statistics. Results: During the seven-year period, 4120 patients were admitted for rehabilitation; 2126 (52%) were female, mean age of 74 years (Standard Deviation 14). Primary reasons for admission were for reconditioning post medical illness or surgical admission (n = 1285, 31%), and 30% (n = 1233) admitted for orthopaedic reasons. Of these orthopaedic admissions, 6.6% (n = 82) were for elective surgery, and 46% (n = 565) were for fractured neck-of-femurs. 76% (n = 3130) of patients were discharged home, 13% (n = 552) to residential care facilities and 10% (n = 430) were discharged to an alternative hospital setting or passed away during their admission. Mean length of stay was 44 days (SD 39) Preliminary analysis of FIM outcomes shows a mean motor score of 53 (SD = 19) on admission which significantly improved to 71 (SD = 18) by discharge. There was no change on FIM cognitive score (28 (SD7) vs 29 (SD 6). Conclusion: Geriatric patients have significant functional limitations even on discharge from inpatient rehabilitation; though overall cognition is relatively intact. Orthopaedic conditions and general deconditioning from medical/surgical admissions are the main reasons for admission. The majority of people receiving rehabilitation are discharged home.
Resumo:
The significance of the proposed name of a building to buyers of units off the plan has received recent attention in Queensland and the ACT with differing results. In Gough v South Sky Investments Pty Ltd the Queensland Court of Appeal concluded that the name of the building was not an essential term of the contract and rejected a claim by a number of buyers to terminate their contracts because of the change of name from Oracle to Peppers. In contrast, Rares J in the Federal Court decision of Madison Constructions Pty Ltd v Empire Building Group (ACT) Pty Ltd considered that the name of the building in a proposed development could potentially form the basis of misleading conduct about the association of the seller with a particular development corporation.