983 resultados para Integration projects
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
Our research examined how projects can draw together the fields of human resource management (HRM) and risk management (RM) to consider workforce-related risks on projects; particularly those with a large contingent workforce. It is argued that RM frameworks could be enhanced by a more comprehensive understanding of the specific potential non-technical “people risks” in projects. The study focussed on the Oil and Gas industry and undertook interviews with experts in the field. The findings are considered within the framework of key HRM areas; Management Practices, General Employment Practices, Staffing, HR Development, and Compensation and Benefits, along with Project Completion. Drawing together RM and HRM in a project environment, our research provides a unique opportunity to identify critical workforce-related risks. Such identification is the first step towards a more comprehensive approach to risk assessment and planning for mitigation of such risks in projects.
Resumo:
This pilot project investigated the existing practices and processes of Proficient, Highly Accomplished and Lead teachers in the interpretation, analysis and implementation of National Assessment Program – Literacy and Numeracy (NAPLAN) data. A qualitative case study approach was the chosen methodology, with nine teachers across a variety of school sectors interviewed. Themes and sub-themes were identified from the participants’ interview responses revealing the ways in which Queensland teachers work with NAPLAN data. The data illuminated that generally individual schools and teachers adopted their own ways of working with data, with approaches ranging from individual/ad hoc, to hierarchical or a whole school approach. Findings also revealed that data are the responsibility of various persons from within the school hierarchy; some working with the data electronically whilst others rely on manual manipulation. Manipulation of data is used for various purposes including tracking performance, value adding and targeting programmes for specific groups of students, for example the gifted and talented. Whilst all participants had knowledge of intervention programmes and how practice could be modified, there were large inconsistencies in knowledge and skills across schools. Some see the use of data as a mechanism for accountability, whilst others mention data with regards to changing the school culture and identifying best practice. Overall, the findings showed inconsistencies in approach to focus area 5.4. Recommendations therefore include a more national approach to the use of educational data.
Resumo:
This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?
Resumo:
Construction scholars suggest that procurement processes can be used as mechanisms to change construction industry practices. This paper discusses industry changes as a response to the calls for integration of sustainability ideals into construction practices. Because major infrastructure construction has been identified as a key producer of greenhouse gas emissions (GHGE), this study explores collaborative procurement models that have been used to facilitate mitigation of GHGE. The study focuses on the application of non-price incentives and rewards that work together as a binary mechanism. Data were collected using mixed-methods: government document content analysis was complemented with data collected through focus groups and individual interviews with both clients and contractors. This report includes examples of greening procurement agendas for three Australian road authorities relating to collaborative procurement project delivery models. Three collaborative procurement models, Alliance Consortium, Early Contractor Involvement and Public Private Partnerships provide evidence of construction projects that were completed early. It can also be argued that both clients and contractors are rewarded through collaborative project delivery. The incentive of early completion is rewarded with reduction of GHGE. This positive environmental outcome, based on a dual benefit and non-price sustainability criteria, suggests a step towards changed industry practices though the use of green procurement models.
Resumo:
Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world’s largest developing country, which is characterized by its unique economic and social systems. In particular, newly identified causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community.
Resumo:
Background: The introduction of Patient Group Directions (PGD) has changed significantly the way in which nurses can now administer prescription only medicines as a one-off for patients requiring this level of service. PGD’s are a written authority to administer drugs to patients that are not identified at the time of treatment. Aim: The aim of this project was to develop a PGD for use within an Outreach team to administer colloid boluses to patients presenting with hypovolemia. Method: Using a case exemplar this paper will discuss the development of a PGD using aspects of transitional change theory to highlight the potential barriers that were encountered. Implications for Practice: The implications for this PGD are wide reaching. First it now enables members from the nursing Outreach team to administer colloid fluid boluses to a prescribed patient cohort without the need for prescription. Second, it ensures the deteriorating patient has interventions initiated in a timely and appropriate manner to reduce inadvertent admission to high care areas. Last, it will improve inter-professional team-working and communication so much so that collaborative patient care reduces health costs and identifies earlier those patients requiring substantially greater nursing and medical input. Conclusion: The experience of developing a working PGD for fluid administration has meant that the Outreach team is able to respond to patients in a more effective way. In addition, it is the experience of developing this PGD that has enabled the team to contemplate other PGD’s in the execution of Outreach work.
Resumo:
Significant advances have been made towards the United Nations Millennium Development Goals on universal education. While there has been an increase in the number of children who now attend primary school, the quality of education remains an issue in many countries. Knowledge and the ability to use ICT are considered to be mandatory for citizens of this century. Information and Communication Technology (ICT) is becoming increasingly more common in classrooms in developed countries. However, ICT use is often beyond the reach of many school communities in developing countries. While supporting these developing countries through donations of technology is a start, there is an equal if not a greater need to build teacher capacity so that the resources are effective in classrooms. The Share, Engage and Educate (SEE) project is about creating educational opportunities for learners in developing countries using ICT. Through the efforts of volunteers, the project provides technological resources to schools and engages teachers in activities that develop their capacity. The SEE project has adopted a four-phase model for ICT integration: objectives, implementation, feedback, and reflection. This chapter reports upon the project’s ongoing implementation phase in Fiji, including the approach taken to build teacher capacity and the identification of factors which have impacted upon the project’s success.
Resumo:
The goal of this study was to describe researchers' experiences in submitting ethical proposals focused on older adult populations, including studies with persons with dementia, to ethical review boards. Ethical approval was granted for an online survey. Researchers were recruited via listservs and snowballing techniques. Participants included 157 persons (73% female) from Australia and the United States, with a mean age of 46 (±13). Six main issues were encountered by researchers who participated in this survey. In descending order, these included questions regarding: informed consent and information requirements (61.1%), participants' vulnerability, particularly for those with cognitive impairments (58.6%), participant burden (44.6%), data access (29.3%), adverse effects of data collection/intervention (26.8%), and study methodology (25.5%). An inductive content analysis of responses revealed a range of encounters with ethical review panels spanning positive, negative, and neutral experiences. Concerns voiced about ethical review boards included committees being overly focused on legal risk, as well as not always hearing the voice of older research participants, both potential and actual. Respondents noted inability to move forward on studies, as well as loss of researchers and participant groups from gerontological and clinical research as a result of negative interactions with ethics committees. Positive interactions with the committees reinforced researchers' need to carefully construct their research approaches with persons with dementia in particular. Suggested guidelines for committees when dealing with ethics applications involving older adults include self-reflecting on potential biases and stereotypes, and seeking further clarification and information from gerontological researchers before arriving at decisions.
Resumo:
This paper presents a layered framework for the purposes of integrating different Socio-Technical Systems (STS) models and perspectives into a whole-of-systems model. Holistic modelling plays a critical role in the engineering of STS due to the interplay between social and technical elements within these systems and resulting emergent behaviour. The framework decomposes STS models into components, where each component is either a static object, dynamic object or behavioural object. Based on existing literature, a classification of the different elements that make up STS, whether it be a social, technical or a natural environment element, is developed; each object can in turn be classified according to the STS elements it represents. Using the proposed framework, it is possible to systematically decompose models to an extent such that points of interface can be identified and the contextual factors required in transforming the component of one model to interface into another is obtained. Using an airport inbound passenger facilitation process as a case study socio-technical system, three different models are analysed: a Business Process Modelling Notation (BPMN) model, Hybrid Queue-based Bayesian Network (HQBN) model and an Agent Based Model (ABM). It is found that the framework enables the modeller to identify non-trivial interface points such as between the spatial interactions of an ABM and the causal reasoning of a HQBN, and between the process activity representation of a BPMN and simulated behavioural performance in a HQBN. Such a framework is a necessary enabler in order to integrate different modelling approaches in understanding and managing STS.
Resumo:
Aligned with the decline of Marshalian view of industry as constituting homogeneous set of firms, the new perspective is emerging by concentrating more on dynamics of sectors as the building block of industrial changes. Based on new assumptions, much of the action in terms of strategy, technology, and knowledge development does not happen either among firms within a stable industry, or through the growth or decline of certain sectors compared to others. Instead, the action happens in terms of the definition, redefinition, drawing, and redrawing of the very nature of these sectors. Technology does not progress and develop within a sector; rather it shapes (and is shaped by) the encompassing architecture of multiple sectors.