747 resultados para Infrastructure Projects
Resumo:
Esitys Dries Moreelsin tapaamisessa (Ghent University Library) 15.–16.10. 2014, Vallila Helsinki. /Performance at visit of Dries Moreels Ghent University Library oct 15th- oct 16th 2014, Vallila Helsinki.
Resumo:
Esitys Helsingissä 24.9.2014.
Resumo:
A postgraduate seminar series with a title Critical Infrastructure Protection against Cyber Threats held at the Department of Military Technology of the National Defence University in the fall of 2013 and 2014. This book is a collection of some of talks that were presented in the seminar. The papers address origin of critical infrastructure protection, wargaming cyberwar in critical infrastructure defence, cyber-target categorization, supervisory control and data acquisition systems vulnerabilities, electric power as critical infrastructure, improving situational awareness of critical infrastructure and trust based situation awareness in high security cloud environment. This set of papers tries to give some insight to current issues of the network-centric critical infrastructure protection. The seminar has always made a publication of the papers but this has been an internal publication of the Finnish Defence Forces and has not hindered publication of the papers in international conferences. Publication of these papers in peer reviewed conferences has indeed been always the goal of the seminar, since it teaches writing conference level papers. We still hope that an internal publication in the department series is useful to the Finnish Defence Forces by offering an easy access to these papers.
Resumo:
The objective of this thesis was to form an understanding about the common gaps in learning from projects, as well as possible approaches to bridging them. In the research focus were the questions on how project teams create knowledge, which fac- tors affect the capture and re-use of this knowledge and how organizations can best capture and utilize this project-based knowledge. The method used was qualitative metasummary, a literature-based research method that has previously been mainly applied in the domains of nursing and health care research. The focus was laid on firms conducting knowledge-intensive business in some form of matrix organization. The research produced a theoretical model of knowledge creation in projects as well as a typology of factors affecting transfer of project-based knowledge. These include experience, culture and leadership, planning and controlling, relationships, project review and documentation. From these factors, suggestions could be derived as to how organizations should conduct projects in order not to lose what has been learned.
Resumo:
Repowering existing power plants by replacing coal with biomass might offer an interesting option to ease the transition from fossil fuels to renewable energy sources and promote a fur-ther expansion of bioenergy in Europe, on account of the potential to decrease greenhouse gas emissions, as well as other pollutants (SOx, NOx, etcetera). In addition, a great part of the appeal of repowering projects comes from the opportunity to reuse the vast existing invest-ment and infrastructure associated with coal-based power generation. Even so, only a limited number of experiences with repowering are found. Therefore, efforts are required to produce technical and scientific evidence to determine whether said technology might be considered feasible for its adoption within European conditions. A detailed evaluation of the technical and economic aspects of this technology constitutes a powerful tool for decision makers to define the energy future for Europe. To better illustrate this concept, a case study is analyzed. A Slovakian pulverized coal plant was used as the basis for determining the effects on perfor-mance, operation, maintenance and cost when fuel is shifted to biomass. It was found that biomass fuel properties play a crucial role in plant repowering. Furthermore, results demon-strate that this technology offers renewable energy with low pollutant emissions at the cost of reduced capacity, relatively high levelized cost of electricity and sometimes, a maintenance-intensive operation. Lastly, regardless of the fact that existing equipment can be reutilized for the most part, extensive additions/modifications may be required to ensure a safe operation and an acceptable performance.
Resumo:
The main objective of the study was to define the methodology for assessing the limits for application island grids instead of interconnecting with existing grid infrastructure. The model for simulation of grid extension distance and levelised cost of electricity has been developed and validated by the case study in Finland. Thereafter, sensitivities of the application limits were examined with the respect to operational environment, load conditions, supply security and geographical location. Finally, recommendations for the small-scale rural electrification projects in the market economy environment have been proposed.
Resumo:
The purpose of this thesis is to find development areas for site operations in power plant construction projects delivered by Wärtsilä. The inspected operations are subcontractor management, site material management and work scheduling. The contractor's role in EPC project is to respond for engineering, procurement, and construction supervision. Geographical and cultural differences brings challenges for finding development areas as Wärtsilä delivers projects world-wide. Searching for development area is mainly made with survey, which answers were collected from the target company's site personnel. Based on the results, with good planning and preparation various problems would be avoided. An external view for the thesis was collected by an expert interview, which was held to three expe-rienced construction operating executives. Interviewees believed that with the se-lection of right site personnel and clearly defined areas of responsibility will great-ly affect the outcome of the project. Some of the theory has been collected from areas, which have helped to under-stand the inspected operations on site. Improving competence knowledge has been important due to the broad scope of work and the author’s inexperience of the topic. Also generally effective practices from construction projects has been col-lected to the theory part. Functionality of general practices have been reflected together with the results of empirically collected data for Wärtsilä's projects. As a result, a model was generated where development proposals and the benefits from new procedures were presented.
Resumo:
The aim of this research was to develop a piping stress analysis guideline to be widely used in Neste Jacobs Oy’s domestic and foreign projects. The company’s former guideline to performing stress analysis was partial and lacked important features, which were to be fixed through this research. The development of the guideline was based on literature research and gathering of existing knowledge from the experts in piping engineering. Case study method was utilized by performing stress analysis on an existing project with help of the new guideline. Piping components, piping engineering in process industry, and piping stress analysis were studied in the theory section of this research. Also, the existing piping standards were studied and compared with one another. By utilizing the theory found in literature and the vast experience and know-how collected from the company’s employees, a new guideline for stress analysis was developed. The guideline would be widely used in various projects. The purpose of the guideline was to clarify certain issues such as which of the piping would have to be analyzed, how are different material values determined and how will the results be reported. As a result, an extensive and comprehensive guideline for stress analysis was created. The new guideline more clearly defines formerly unclear points and creates clear parameters to performing calculations. The guideline is meant to be used by both new and experienced analysts and with its aid, the calculation process was unified throughout the whole company’s organization. Case study was used to exhibit how the guideline is utilized in practice, and how it benefits the calculation process.
Resumo:
In the Finnish university society the commercialization research projects has not been a focus of interest until now. The reasons for the growing interest towards commercialization research projects are their possibility to develop our economy simultaneously by providing new technologies and products. This study focuses on the examination of what kind of high-technology oriented research can be commercialized and how. The aim is to generate understanding of how commercialization research projects should proceed and to find concrete ways of improving the of commercialization research projects. As its research method, the study analyzes four different university high-technology research projects which have been commercially oriented and have to some degree been able to commercialize the product or technology developed during the research phase. The data has been gathered mainly by semi-structured interviews of people involved in these particular projects or cases. The findings from the interviews have been reflected to the final reports of the projects, provided by TEKES, and later on the data gained has been compared to each other. Also a literature review has been produced about the subject of commercializing university research with the purpose of providing known theories and framework connected with the subject. The study reveals five main factors related to commercializing high-tech research. These factors are: The Team, Market potential and competitiveness, Product and technology, Funding and Steering Group. Also the uncertainties related to these factors have been addressed. As a conclusion the study provides the main aspects that should be considered when starting a commercialization research project. Also a combining hierarchical framework has been provided related to the five factors presented. In Chapter 5 the study addresses the main tasks or steps to be taken in order to get public funding for a commercially oriented research project and later on the actual steps to be executed in order to successfully commercialize these high-tech research projects.