867 resultados para Electrical power - Distribution
Resumo:
This paper presents Reinforcement Learning (RL) approaches to Economic Dispatch problem. In this paper, formulation of Economic Dispatch as a multi stage decision making problem is carried out, then two variants of RL algorithms are presented. A third algorithm which takes into consideration the transmission losses is also explained. Efficiency and flexibility of the proposed algorithms are demonstrated through different representative systems: a three generator system with given generation cost table, IEEE 30 bus system with quadratic cost functions, 10 generator system having piecewise quadratic cost functions and a 20 generator system considering transmission losses. A comparison of the computation times of different algorithms is also carried out.
Resumo:
Die Maßnahmen zur Förderung der Windenergie in Deutschland haben wichtige Anstöße zur technologischen Weiterentwicklung geliefert und die Grundlagen für den enormen Anlagenzubau geschaffen. Die installierte Windleistung hat heute eine beachtliche Größenordnung erreicht und ein weiteres Wachstum in ähnlichen Dimensionen ist auch für die nächsten Jahre zu erwarten. Die aus Wind erzeugte elektrische Leistung deckt bereits heute in einigen Netzbereichen die Netzlast zu Schwachlastzeiten. Dies zeigt, dass die Windenergie ein nicht mehr zu vernachlässigender Faktor in der elektrischen Energieversorgung geworden ist. Im Rahmen der Kraftwerkseinsatzplanung sind Betrag und Verlauf der Windleistung des folgenden Tages mittlerweile zu wichtigen und zugleich schwierig zu bestimmenden Variablen geworden. Starke Schwankungen und falsche Prognosen der Windstromeinspeisung verursachen zusätzlichen Bedarf an Regel- und Ausgleichsleistung durch die Systemführung. Das im Rahmen dieser Arbeit entwickelte Prognosemodell liefert die zu erwartenden Windleistungen an 16 repräsentativen Windparks bzw. Gruppen von Windparks für bis zu 48 Stunden im Voraus. Aufgrund von prognostizierten Wetterdaten des deutschen Wetterdienstes (DWD) werden die Leistungen der einzelnen Windparks mit Hilfe von künstlichen neuronalen Netzen (KNN) berechnet. Diese Methode hat gegenüber physikalischen Verfahren den Vorteil, dass der komplexe Zusammenhang zwischen Wettergeschehen und Windparkleistung nicht aufwendig analysiert und detailliert mathematisch beschrieben werden muss, sondern anhand von Daten aus der Vergangenheit von den KNN gelernt wird. Das Prognosemodell besteht aus zwei Modulen. Mit dem ersten wird, basierend auf den meteorologischen Vorhersagen des DWD, eine Prognose für den Folgetag erstellt. Das zweite Modul bezieht die online gemessenen Leistungsdaten der repräsentativen Windparks mit ein, um die ursprüngliche Folgetagsprognose zu verbessern und eine sehr genaue Kurzzeitprognose für die nächsten drei bis sechs Stunden zu berechnen. Mit den Ergebnissen der Prognosemodule für die repräsentativen Standorte wird dann über ein Transformationsmodell, dem so genannten Online-Modell, die Gesamteinspeisung in einem größeren Gebiet berechnet. Das Prognoseverfahren hat seine besonderen Vorzüge in der Genauigkeit, den geringen Rechenzeiten und den niedrigen Betriebskosten, da durch die Verwendung des bereits implementierten Online-Modells nur eine geringe Anzahl von Vorhersage- und Messstandorten benötigt wird. Das hier vorgestellte Prognosemodell wurde ursprünglich für die E.ON-Netz GmbH entwickelt und optimiert und ist dort seit Juli 2001 im Einsatz. Es lässt sich jedoch auch leicht an andere Gebiete anpassen. Benötigt werden dazu nur die Messdaten der Leistung ausgewählter repräsentativer Windparks sowie die dazu gehörenden Wettervorhersagen, um die KNN entsprechend zu trainieren.
Resumo:
In rural areas of the Mekong Countries, the problem of electricity supplying rural communities is particularly alarming. Supplying power to these areas requires facilities that are not economically viable. However, government programs are under way to provide this product that is vital to community well being. A nation priority of Mekong Countries is to provide electrical power to people in rural areas, within normal budgetary constraints. Electricity must be introduced into rural areas in such a way that maximize the technical, economic and social benefit. Another consideration is the source of electrical generation and the effects on the natural environment. The main research purpose is to implement field tests, monitoring and evaluation of the PV-Diesel Hybrid System (PVHS) at the Energy Park of School of Renewable Energy Technology (SERT) in order to test the PVSH working under the meteorological conditions of the Mekong Countries and to develop a software simulation called RES, which studies the technical and economic performance of rural electrification options. This software must be easy to use and understand for the energy planner on rural electrification projects, to evaluate the technical and economic performance of the PVHS based on the renewable energy potential for rural electrification of the Mekong Country by using RES. Finally, this project aims to give guidance for the possible use of PVHS application in this region, particularly in regard to its technical and economic sustainability. PVHS should be promoted according to the principles of proper design and adequate follow up with maintenance, so that the number of satisfied users will be achieved. PVHS is not the only possible technology for rural electrification, but for the Mekong Countries it is one of the most proper choices. Other renewable energy options such as wind, biomass and hydro power need to be studied in future.
Resumo:
Abstract: The paper describes an auditory interface using directional sound as a possible support for pilots during approach in an instrument landing scenario. Several ways of producing directional sounds are illustrated. One using speaker pairs and controlling power distribution between speakers is evaluated experimentally. Results show, that power alone is insufficient for positioning single isolated sound events, although discrimination in the horizontal plane performs better than in the vertical. Additional sound parameters to compensate for this are proposed.
Resumo:
Projecte de millores d'infrastructures de la urbanització de Santa Maria de Llorell (Tossa de Mar
Resumo:
La qualitat d'ona en el servei elèctric
Resumo:
Control de la qualitat de la Xarxa elèctrixa
Resumo:
A petició d’un grup d’empreses del polígon industrial “Polígon”, es redacta el present projecte que té per objecte establir les característiques tècniques per a la construcció d’una variant de la línia de doble circuit 110 kV que uneix les dues subestacions; S.E. Polígon Nord – S.E. Polígon Sur. Actualment es disposa d’una línia de doble circuit 110 kV que uneix les dues subestacions; S.E. Polígon Nord – S.E. Polígon Sur i que travessa vàries parcel•les del polígon industrial “Polígon” sobrevolant-les i reduint, per tant, la seva capacitat d’aprofitament de sòl. Es consideraran, i es calcularan, les dues alternatives que existeixen actualment en línies de transport elèctric: variant aèria i variant soterrada
Resumo:
This paper presents and compares two approaches to estimate the origin (upstream or downstream) of voltage sag registered in distribution substations. The first approach is based on the application of a single rule dealing with features extracted from the impedances during the fault whereas the second method exploit the variability of waveforms from an statistical point of view. Both approaches have been tested with voltage sags registered in distribution substations and advantages, drawbacks and comparative results are presented
Resumo:
A statistical method for classification of sags their origin downstream or upstream from the recording point is proposed in this work. The goal is to obtain a statistical model using the sag waveforms useful to characterise one type of sags and to discriminate them from the other type. This model is built on the basis of multi-way principal component analysis an later used to project the available registers in a new space with lower dimension. Thus, a case base of diagnosed sags is built in the projection space. Finally classification is done by comparing new sags against the existing in the case base. Similarity is defined in the projection space using a combination of distances to recover the nearest neighbours to the new sag. Finally the method assigns the origin of the new sag according to the origin of their neighbours
Resumo:
El interés del presente estudio de caso es analizar la articulación de las dinámicas de poder y estrategias de negociación detrás de un proceso tan complejo como el de la creación del Tratado sobre el Comercio de Armas.El estudio examina la evolución de las tensiones principales entre los Estados participantes frente al Tratado y resalta las lógicas de poder al interior de las negociaciónes, así como los factores externos que influyeron para solucionar o agravar dichas tensiones. Con el apoyo de diferentes conceptos teóricos de negociación, se observa en específico el rol de las coaliciones como una importante estrategia utilizada por Estados pequeños para contrarrestar de alguna forma la asimetría de poder en un escenario donde los grandes exportadores e importadores de armas en la negociación tienen mayor peso.
Resumo:
Es va instal.lar un analitzador CM4000 a la Facultat de Ciències per tal de poder enregistrar en temps real les incidències en la xarxa elèctrica que s'estaven produint (caigudes de tensió i problemes amb els harmònics). El projecte vol monotoritzar la qualitat dels registres d'aquest analitzador que queden enregistrats a la base de dades Power Server. A partir d'aquestes dades es realitza un estudi sobre la freqüència de les incidències, buscant el patró dels dies i hores en què les incidències són màximes
Resumo:
La calidad de energía eléctrica incluye la calidad del suministro y la calidad de la atención al cliente. La calidad del suministro a su vez se considera que la conforman dos partes, la forma de onda y la continuidad. En esta tesis se aborda la continuidad del suministro a través de la localización de faltas. Este problema se encuentra relativamente resuelto en los sistemas de transmisión, donde por las características homogéneas de la línea, la medición en ambos terminales y la disponibilidad de diversos equipos, se puede localizar el sitio de falta con una precisión relativamente alta. En sistemas de distribución, sin embargo, la localización de faltas es un problema complejo y aún no resuelto. La complejidad es debida principalmente a la presencia de conductores no homogéneos, cargas intermedias, derivaciones laterales y desbalances en el sistema y la carga. Además, normalmente, en estos sistemas sólo se cuenta con medidas en la subestación, y un modelo simplificado del circuito. Los principales esfuerzos en la localización han estado orientados al desarrollo de métodos que utilicen el fundamental de la tensión y de la corriente en la subestación, para estimar la reactancia hasta la falta. Como la obtención de la reactancia permite cuantificar la distancia al sitio de falta a partir del uso del modelo, el Método se considera Basado en el Modelo (MBM). Sin embargo, algunas de sus desventajas están asociadas a la necesidad de un buen modelo del sistema y a la posibilidad de localizar varios sitios donde puede haber ocurrido la falta, esto es, se puede presentar múltiple estimación del sitio de falta. Como aporte, en esta tesis se presenta un análisis y prueba comparativa entre varios de los MBM frecuentemente referenciados. Adicionalmente se complementa la solución con métodos que utilizan otro tipo de información, como la obtenida de las bases históricas de faltas con registros de tensión y corriente medidos en la subestación (no se limita solamente al fundamental). Como herramienta de extracción de información de estos registros, se utilizan y prueban dos técnicas de clasificación (LAMDA y SVM). Éstas relacionan las características obtenidas de la señal, con la zona bajo falta y se denominan en este documento como Métodos de Clasificación Basados en el Conocimiento (MCBC). La información que usan los MCBC se obtiene de los registros de tensión y de corriente medidos en la subestación de distribución, antes, durante y después de la falta. Los registros se procesan para obtener los siguientes descriptores: a) la magnitud de la variación de tensión ( dV ), b) la variación de la magnitud de corriente ( dI ), c) la variación de la potencia ( dS ), d) la reactancia de falta ( Xf ), e) la frecuencia del transitorio ( f ), y f) el valor propio máximo de la matriz de correlación de corrientes (Sv), cada uno de los cuales ha sido seleccionado por facilitar la localización de la falta. A partir de estos descriptores, se proponen diferentes conjuntos de entrenamiento y validación de los MCBC, y mediante una metodología que muestra la posibilidad de hallar relaciones entre estos conjuntos y las zonas en las cuales se presenta la falta, se seleccionan los de mejor comportamiento. Los resultados de aplicación, demuestran que con la combinación de los MCBC con los MBM, se puede reducir el problema de la múltiple estimación del sitio de falta. El MCBC determina la zona de falta, mientras que el MBM encuentra la distancia desde el punto de medida hasta la falta, la integración en un esquema híbrido toma las mejores características de cada método. En este documento, lo que se conoce como híbrido es la combinación de los MBM y los MCBC, de una forma complementaria. Finalmente y para comprobar los aportes de esta tesis, se propone y prueba un esquema de integración híbrida para localización de faltas en dos sistemas de distribución diferentes. Tanto los métodos que usan los parámetros del sistema y se fundamentan en la estimación de la impedancia (MBM), como aquellos que usan como información los descriptores y se fundamentan en técnicas de clasificación (MCBC), muestran su validez para resolver el problema de localización de faltas. Ambas metodologías propuestas tienen ventajas y desventajas, pero según la teoría de integración de métodos presentada, se alcanza una alta complementariedad, que permite la formulación de híbridos que mejoran los resultados, reduciendo o evitando el problema de la múltiple estimación de la falta.
Resumo:
The creation of OFDM based Wireless Personal Area Networks (WPANs) has allowed the development of high bit-rate wireless communication devices suitable for streaming High Definition video between consumer products, as demonstrated in Wireless-USB and Wireless-HDMI. However, these devices need high frequency clock rates, particularly for the OFDM, FFT and symbol processing sections resulting in high silicon cost and high electrical power. The high clock rates make hardware prototyping difficult and verification is therefore very important but costly. Acknowledging that electrical power in wireless consumer devices is more critical than the number of implemented logic gates, this paper presents a Double Data Rate (DDR) architecture for implementation inside a OFDM baseband codec in order to reduce the high frequency clock rates by a complete factor of 2. The presented architecture has been implemented and tested for ECMA-368 (Wireless- USB context) resulting in a maximum clock rate of 264MHz instead of the expected 528MHz clock rate existing anywhere on the baseband codec die.
Resumo:
The creation of OFDM based Wireless Personal Area Networks (WPANs) has allowed high bit-rate wireless communication devices suitable for streaming High Definition video between consumer products as demonstrated in Wireless- USB. However, these devices need high clock rates, particularly for the OFDM sections resulting in high silicon cost and high electrical power. Acknowledging that electrical power in wireless consumer devices is more critical than the number of implemented logic gates, this paper presents a Double Data Rate (DDR) architecture to reduce the OFDM input and output clock rate by a factor of 2. The architecture has been implemented and tested for Wireless-USB (ECMA-368) resulting in a maximum clock of 264MHz instead of 528MHz existing anywhere on the die.