914 resultados para Organ (Musical instrument)--Construction
Resumo:
Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.
Resumo:
The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.
Resumo:
The dominant economic paradigm currently guiding industry policy making in Australia and much of the rest of the world is the neoclassical approach. Although neoclassical theories acknowledge that growth is driven by innovation, such innovation is exogenous to their standard models and hence often not explored. Instead the focus is on the allocation of scarce resources, where innovation is perceived as an external shock to the system. Indeed, analysis of innovation is largely undertaken by other disciplines, such as evolutionary economics and institutional economics. As more has become known about innovation processes, linear models, based on research and development or market demand, have been replaced by more complex interactive models which emphasise the existence of feedback loops between the actors and activities involved in the commercialisation of ideas (Manley 2003). Currently dominant among these approaches is the national or sectoral innovation system model (Breschi and Malerba 2000; Nelson 1993), which is based on the notion of increasingly open innovation systems (Chesbrough, Vanhaverbeke, and West 2008). This chapter reports on the ‘BRITE Survey’ funded by the Cooperative Research Centre for Construction Innovation which investigated the open sectoral innovation system operating in the Australian construction industry. The BRITE Survey was undertaken in 2004 and it is the largest construction innovation survey ever conducted in Australia. The results reported here give an indication of how construction innovation processes operate, as an example that should be of interest to international audiences interested in construction economics. The questionnaire was based on a broad range of indicators recommended in the OECD’s Community Innovation Survey guidelines (OECD/Eurostat 2005). Although the ABS has recently begun to undertake regular innovation surveys that include the construction industry (2006), they employ a very narrow definition of the industry and only collect very basic data compared to that provided by the BRITE Survey, which is presented in this chapter. The term ‘innovation’ is defined here as a new or significantly improved technology or organisational practice, based broadly on OECD definitions (OECD/Eurostat 2005). Innovation may be technological or organisational in nature and it may be new to the world, or just new to the industry or the business concerned. The definition thus includes the simple adoption of existing technological and organisational advancements. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment. It builds on a pilot innovation survey undertaken by PricewaterhouseCoopers (PWC) for the Australian Construction Industry Forum on behalf of the Australian Commonwealth Department of Industry Tourism and Resources, in 2001 (PWC 2002). The survey responds to an identified need within the Australian construction industry to have accurate and timely innovation data upon which to base effective management strategies and public policies (Focus Group 2004).
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.
Resumo:
Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.
Resumo:
In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.
Resumo:
Idol is a collaborative performance work for vocal performer and dancers. The work explores movement and sound relative to a vocal interface called the eMic (Extended Microphone Interface Controller). The eMic is a gestural controller designed by the composer for live vocal performance an real-time processing. The process for generating the work involves the choreographer being provided an opportunity to experiment with gestures ad movement relative to the eMic interface. The choreographer explored the interface as an object,a prop, an instrument and as an extension of the body. the movement was then videoed and the data coming from the sensors simultaneously recorded. The data and the video were then used as part of the compositional process, allowing the composer to see what the performance looks like and to experiment with mapping strategies using the captured sensor data. This approach represents a new compositional direction for working with the eMic, in that previously the compositional process commenced at the computer, building processing patches and assigning parameters to eMic sensors. In order to play the composition, the body needed to adapt to 'playing' the instrument. This approach treats the eMic like a traditional instrument that requires the human body to develop a command over the instrument. Working with the movement as a starting point inverts the process using choreographic gestures as the basis for musical structures.
Resumo:
Enterprise development and its contribution to societal and economic outcomes are well known. However, limited research into microenterprises and the practices of microfinance and microcredit in developing countries has been carried out. This chapter presents the findings of research based on six years of engagement with the microentrepreneurs of Beira in Mozambique and suggests a model for responsible and sustainable support for enterprise development in developing economies. Building on semistructured interviews, observation, and participatory action research, this research project articulates a new approach supportive of enterprise development, as a process of cocreation with local people and based on sustainability principles. These findings are part of a longitudinal study of the successes and failures of small enterprises and their impact on social and economic activity.
Resumo:
The Australian Construction Industry Forum (which is a peak industry association) and the Australian Procurement and Construction Council (which is a peak government organisation) have jointly agreed on a set of KPIs for the Australian Construction Industry. The goal of such a process is to work collaboratively in order to lift industry performance overall, and thereby bring about economic and social benefits to the industry and broader community. This paper seeks to underpin the process of KPI measurement by providing: an overview of international approaches to KPI measurement, summary of difficulties identified in performance measurement together with possible responses to these problems, and finally a discussion on the various methods for reporting KPIs. A number of findings throughout the paper, based on the review, made in order to advance the goal of performance measurement in the construction industry in Australia. Such findings would be relevant to other countries considering a KPI measurement process as well.
Resumo:
Organ printing techniques offer the potential to produce living 3D tissue constructs to repair or replace damaged or diseased human tissues and organs. Using these techniques, spatial variations along multiple axes with high geometric complexity can be obtained.. The level of control offered by these technologies to develop printed tissues will allow tissue engineers to better study factors that modulate tissue formation and function, and provide a valuable tool to study the effect of anatomy on graft performance. In this chapter we discuss the history behind substrate patterning and cell and organ printing, and the rationale for developing organ printing techniques with respect to limitations of current clinical tissue engineering strategies to effectively repair damaged tissues. We discuss current 2-dimensional and 3-dimesional strategies for assembling cells as well as the necessary support materials such as hydrogels, bioinks and natural and synthetic polymers adopted for organ printing research. Furthermore, given the current state-of-the-art in organ printing technologies, we discuss some of their limitations and provide recommendations for future developments in this rapidly growing field.
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.
Resumo:
A simple mathematical model is presented to describe the cell separation process that plants undertake in order to deliberately shed organs. The focus here is on modelling the production of the enzyme polygalacturonase, which breaks down pectin that provides natural cell-to-cell adhesion in the localised abscission zone. A coupled system of three ordinary differential equations is given for a single cell, and then extended to hold for a layer of cells in the abscission zone. Simple observations are made based on the results of this preliminary model and, furthermore, a number of opportunities for applied mathematicians to make contributions in this subject area are discussed.
Resumo:
The study of the creative industries is not much more than a decade old. What makes it fascinating is that it is dealing with a rapidly evolving process, where a good deal of Schumpeterian ‘creative destruction’ – of old industries, business models, and some familiar cultural and creative pursuits – can already be observed. What happens next – and who will be the winner – is hard to predict. Furthermore, the creative industries encompass both large-scale ‘industry’ (media, publishing, digital applications) and individual creative talent; both economic and cultural values, and both global reach and local context. Thus, the challenge is to integrate ‘top-down’ policy and planning with ‘bottom-up’ experimentation and innovation. There is always the promise that this new creative ecology will provide some novel answers to problems of wealth-creation for emergent economies, new solutions to problems of intellectual emancipation for individuals, and sustainable development for that most intense incubator of creative ideas, the city.
Resumo:
Ecological sustainable development (ESD), defined as that which meets the needs of the present without compromising the ability of future generations to meet their own needs, has much to offer in enhancing the quality of life of people and maintaining the environment for future generations by reducing the pollution of water, air and land, minimizing the destruction of irreplaceable ecosystems and cutting down the amount of toxic materials released. However, there is still much to do to achieve full implementation world-wide. This paper reports on three factors-design, attitudes and financial constraints - that are likely barriers to the implementation of ESD within the built environment in Australian industry. A postal questionnaire survey is described aimed at soliciting views on detailed aspects of the factors. This shows that ESD in the Australian built environment has also not been successfully implemented. The main reason is found to be due to the perceived costs involved - the cost of using environmental materials being a predominant factor. The design of ESD, being more sophisticated, also is perceived as involving stakeholders in more expense. There also appears to be a lack of knowledge and a lack of specialised and interdisciplinary design teams available in the Australian context.
Resumo:
Expenditure on R&D in the China construction industry has been relatively low in comparison with many developed countries for a number of years – a situation considered to be a major barrier to the industry’s competitiveness in general and unsatisfactory industry development of the 31 regions involved. A major problem with this is the lack of a sufficiently sophisticated method of objectively evaluating R&D activity in what are quite complex circumstances considering the size and regional differences that exist in this part of the world. A regional construction R&D evaluation system (RCRES) is presented aimed at rectifying the situation. This is based on 12 indicators drawn from the Chinese Government’s R&D Inventory of Resources in consultation with a small group of experts in the field, and further factor analysed into three groups. From this, the required evaluation is obtained by a simple formula. Examination of the results provides a ranking list of the R&D performance of each of the 31 regions, indicating a general disproportion between coastal and inland regions and highlighting regions receiving special emphasis or currently lacking in development. The understanding on this is vital for the future of China’s construction industry.