853 resultados para Process Management, Maturity Model, CMM, Delphi Study
Resumo:
This work involves the organization and content perspectives on Enterprise Content Management (ECM) framework. The case study at the Federal University of Rio Grande do Norte was based on ECM model to analyse the information management provided by the three main administrative systems: The Integrated Management of Academic Activities (SIGAA), Integrated System of Inheritance, and Contracts Administration (SIPAC) and the Integrated System for Administration and Human Resources (SIGRH). A case study protocol was designed to provide greater reliability to research process. Four propositions were examined in order to reach the specific objectives of identification and evaluation of ECM components from UFRN perspective. The preliminary phase provided the guidelines for the data collection. In total, 75 individuals were interviewed. Interviews with four managers directly involved on systems design were recorded (average duration of 90 minutes). The 70 remaining individuals were approached in random way in UFRN s units, including teachers, administrative-technical employees and students. The results showed the presence of many ECM elements in the management of UFRN administrative information. The technological component with higher presence was "management of web content / collaboration". But initiatives of other components (e.g. email and document management) were found and are in continuous improvement. The assessment made use of eQual 4.0 to examine the effectiveness of applications under three factors: usability, quality of information and offered service. In general, the quality offered by the systems was very good and walk side by side with the obtained benefits of ECM strategy adoption in the context of the whole institution
Resumo:
Continuous delivery (CD) is a software engineering approach where the focus lays on creating a short delivery cycle by automating parts of the deployment pipeline which includes build, deploy-, test and release process. CD is based on that during development should be possible to always automatically generate a release based on the source code in its current state. One of CD's many advantages is that through continuous releases it allows you to get a quick feedback loop leading to faster and more efficient implementation of new functions, at the same time fixing errors. Although CD has many advantages, there are also several challenges a maintenance management project must manage in the transition to CD. These challenges may differ depending on the maturity level for a maintenance management project and what strengths and weaknesses the project has. Our research question was: "What challenges can a maintenance management project face in transition to Continuous delivery?" The purpose of this study is to describe Continuous delivery and the challenges a maintenance management project may face during a transition to Continuous delivery. A descriptive case study has been carried out with the data collection methods of interviews and documents. A situation analysis was created based on the collected data in a shape of a process model that represent the maintenance management projects release process. The processmodel was used as the basis of SWOT analysis and analysis by Rehn et al's Maturity Model. From these analyzes we found challenges of a maintenance management project may face in the transition to CD. The challenges are about customers and the management's attitude towards a transition to CD. But the biggest challenge is about automation of the deployment pipeline steps.
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
This work involves the organization and content perspectives on Enterprise Content Management (ECM) framework. The case study at the Federal University of Rio Grande do Norte was based on ECM model to analyse the information management provided by the three main administrative systems: The Integrated Management of Academic Activities (SIGAA), Integrated System of Inheritance, and Contracts Administration (SIPAC) and the Integrated System for Administration and Human Resources (SIGRH). A case study protocol was designed to provide greater reliability to research process. Four propositions were examined in order to reach the specific objectives of identification and evaluation of ECM components from UFRN perspective. The preliminary phase provided the guidelines for the data collection. In total, 75 individuals were interviewed. Interviews with four managers directly involved on systems design were recorded (average duration of 90 minutes). The 70 remaining individuals were approached in random way in UFRN s units, including teachers, administrative-technical employees and students. The results showed the presence of many ECM elements in the management of UFRN administrative information. The technological component with higher presence was "management of web content / collaboration". But initiatives of other components (e.g. email and document management) were found and are in continuous improvement. The assessment made use of eQual 4.0 to examine the effectiveness of applications under three factors: usability, quality of information and offered service. In general, the quality offered by the systems was very good and walk side by side with the obtained benefits of ECM strategy adoption in the context of the whole institution
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
This paper consists of a detailed case narrative on how a leading Australian Finance organisation has utilised contemporary Business Process Management (BPM) concepts for improving the IT incident management processes within the whole organisation. The target audience includes practitioners who are interested in BPM case studies and Academics who may be seeking case studies for innovative teaching practices.
Resumo:
As process management projects have increased in size due to globalised and company-wide initiatives, a corresponding growth in the size of process modeling projects can be observed. Despite advances in languages, tools and methodologies, several aspects of these projects have been largely ignored by the academic community. This paper makes a first contribution to a potential research agenda in this field by defining the characteristics of large-scale process modeling projects and proposing a framework of related issues. These issues are derived from a semi -structured interview and six focus groups conducted in Australia, Germany and the USA with enterprise and modeling software vendors and customers. The focus groups confirm the existence of unresolved problems in business process modeling projects. The outcomes provide a research agenda which directs researchers into further studies in global process management, process model decomposition and the overall governance of process modeling projects. It is expected that this research agenda will provide guidance to researchers and practitioners by focusing on areas of high theoretical and practical relevance.
Value-oriented process modeling : integrating financial perspectives into business process re-design
Resumo:
Purpose – Financial information about costs and return on investments are of key importance to strategic decision-making but also in the context of process improvement or business engineering. In this paper we propose a value-oriented approach to business process modeling based on key concepts and metrics from operations and financial management, to aid decision making in process re-design projects on the basis of process models. Design/methodology/approach – We suggest a theoretically founded extension to current process modeling approaches, and delineate a framework as well as methodical support to incorporate financial information into process re-design. We use two case studies to evaluate the suggested approach. Findings – Based on two case studies, we show that the value-oriented process modeling approach facilitates and improves managerial decision-making in the context of process re-design. Research limitations / implications – We present design work and two case studies. More research is needed to more thoroughly evaluate the presented approach in a variety of real-life process modeling settings. Practical implications – We show how our approach enables decision makers to make investment decisions in process re-design projects, and also how other decisions, for instance in the context of enterprise architecture design, can be facilitated. Originality/value – This study reports on an attempt to integrate financial considerations into the act of process modeling, in order to provide more comprehensive decision making support in process re-design projects.
Resumo:
Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.
Resumo:
For over a decade, IT expenditure in China and Malaysia has shown a significant increase, as organisations in these countries are increasingly dependent on information systems (IS) for achieving strategic advantages and business benefits. However, there have been numerous reports of dissatisfaction with IS, and in some cases the effectiveness of the information systems have yet to be reviewed. Two exploratory case studies reported in this paper are the first phase of an overall research in validating the IS-Impact model introduced by Gable, Sedera and Chan in two countries: China and Malaysia. This validation research aims to produce a standard measuring model across different contexts. The purpose of this paper is to present preliminary findings from two exploratory case studies, attempt to test the feasibility of the research design and to investigate applicability of the IS-Impact model in Chinese and Malaysian organisations. Twenty-nine respondents from a Chinese private company and seventeen respondents from a state government in Malaysia were involved in these studies. Findings indicated that most of existing IS-Impact measures are applicable in the study contexts, however, there are some new measures informed by the respondents. Feedback from the case studies also suggested necessary modifications to the Mandarin instrument.
Resumo:
Introduction The purpose of this study was to develop, implement and evaluate the impact of an educational intervention, comprising an innovative model of clinical decisionmaking and educational delivery strategy for facilitating nursing students‘ learning and development of competence in paediatric physical assessment practices. Background of the study Nursing students have an undergraduate education that aims to produce graduates of a generalist nature who demonstrate entry level competence for providing nursing care in a variety of health settings. Consistent with population morbidity and health care roles, paediatric nursing concepts typically form a comparatively small part of undergraduate curricula and students‘ exposure to paediatric physical assessment concepts and principles are brief. However, the nursing shortage has changed traditional nursing employment patterns and new graduates form the majority of the recruitment pool for paediatric nursing speciality staff. Paediatric nursing is a popular career choice for graduates and anecdotal evidence suggests that nursing students who select a clinical placement in their final year intend to seek employment in paediatrics upon graduation. Although concepts of paediatric nursing are included within undergraduate curriculum, students‘ ability to develop the required habits of mind to practice in what is still regarded as a speciality area of practice is somewhat limited. One of the areas of practice where this particularly impacts is in paediatric nursing physical assessment. Physical assessment is a fundamental component of nursing practice and competence in this area of practice is central to nursing students‘ development of clinical capability for practice as a registered nurse. Timely recognition of physiologic deterioration of patients is a key outcome of nurses‘ competent use of physical assessment strategies, regardless of the practice context. In paediatric nursing contexts children‘s physical assessment practices must specifically accommodate the child‘s different physiological composition, function and pattern of clinical deterioration (Hockenberry & Barrera, 2007). Thus, to effectively manage physical assessment of patients within the paediatric practice setting nursing students need to integrate paediatric nursing theory into their practice. This requires significant information processing and it is in this process where students are frequently challenged. The provision of rules or models can guide practice and assist novice-level nurses to develop their capabilities (Benner, 1984; Benner, Hooper-Kyriakidis & Stannard, 1999). Nursing practice models are cognitive tools that represent simplified patterns of expert analysis employing concepts that suit the limited reasoning of the inexperienced, and can represent the =rules‘ referred to by Benner (1984). Without a practice model of physical assessment students are likely to be uncertain about how to proceed with data collection, the interpretation of paediatric clinical findings and the appraisal of findings. These circumstances can result in ad hoc and unreliable nursing physical assessment that forms a poor basis for nursing decisions. The educational intervention developed as part of this study sought to resolve this problem and support nursing students‘ development of competence in paediatric physical assessment. Methods This study utilised the Context Input Process Product (CIPP) Model by Stufflebeam (2004) as the theoretical framework that underpinned the research design and evaluation methodology. Each of the four elements in the CIPP model were utilised to guide discrete stages of this study. The Context element informed design of the clinical decision-making process, the Paediatric Nursing Physical Assessment model. The Input element was utilised in appraising relevant literature, identifying an appropriate instructional methodology to facilitate learning and educational intervention delivery to undergraduate nursing students, and development of program content (the CD-ROM kit). Study One employed the Process element and used expert panel approaches to review and refine instructional methods, identifying potential barriers to obtaining an effective evaluation outcome. The Product element guided design and implementation of Study Two, which was conducted in two phases. Phase One employed a quasiexperimental between-subjects methodology to evaluate the impact of the educational intervention on nursing students‘ clinical performance and selfappraisal of practices in paediatric physical assessment. Phase Two employed a thematic analysis and explored the experiences and perspectives of a sample subgroup of nursing students who used the PNPA CD-ROM kit as preparation for paediatric clinical placement. Results Results from the Process review in Study One indicated that the prototype CDROM kit containing the PNPA model met the predetermined benchmarks for face validity and the impact evaluation instrumentation had adequate content validity in comparison with predetermined benchmarks. In the first phase of Study Two the educational intervention did not result in statistically significant differences in measures of student performance or self-appraisal of practice. However, in Phase Two qualitative commentary from students, and from the expert panel who reviewed the prototype CD-ROM kit (Study One, Phase One), strongly endorsed the quality of the intervention and its potential for supporting learning. This raises questions regarding transfer of learning and it is likely that, within this study, several factors have influenced students‘ transfer of learning from the educational intervention to the clinical practice environment, where outcomes were measured. Conclusion In summary, the educational intervention employed in this study provides insights into the potential e-learning approaches offer for delivering authentic learning experiences to undergraduate nursing students. Findings in this study raise important questions regarding possible pedagogical influences on learning outcomes, issues within the transfer of theory to practice and factors that may have influenced findings within the context of this study. This study makes a unique contribution to nursing education, specifically with respect to progressing an understanding of the challenges faced in employing instructive methods to impact upon nursing students‘ development of competence. The important contribution transfer of learning processes make to students‘ transition into the professional practice context and to their development of competence within the context of speciality practice is also highlighted. This study contributes to a greater awareness of the complexity of translating theoretical learning at undergraduate level into clinical practice, particularly within speciality contexts.
Resumo:
Over the last decade, system integration has grown in popularity as it allows organisations to streamline business processes. Traditionally, system integration has been conducted through point-to-point solutions – as a new integration scenario requirement arises, a custom solution is built between the relevant systems. Bus-based solutions are now preferred, whereby all systems communicate via an intermediary system such as an enterprise service bus, using a common data exchange model. This research investigates the use of a common data exchange model based on open standards, specifically MIMOSA OSA-EAI, for asset management system integration. A case study is conducted that involves the integration of processes between a SCADA, maintenance decision support and work management system. A diverse number of software platforms are employed in developing the final solution, all tied together through MIMOSA OSA-EAI-based XML web services. The lessons learned from the exercise are presented throughout the paper.
Resumo:
A configurable process model describes a family of similar process models in a given domain. Such a model can be configured to obtain a specific process model that is subsequently used to handle individual cases, for instance, to process customer orders. Process configuration is notoriously difficult as there may be all kinds of interdependencies between configuration decisions.} In fact, an incorrect configuration may lead to behavioral issues such as deadlocks and livelocks. To address this problem, we present a novel verification approach inspired by the ``operating guidelines'' used for partner synthesis. We view the configuration process as an external service, and compute a characterization of all such services which meet particular requirements using the notion of configuration guideline. As a result, we can characterize all feasible configurations (i.\,e., configurations without behavioral problems) at design time, instead of repeatedly checking each individual configuration while configuring a process model.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
Emerging market importers are increasingly engaging in relationships with foreign suppliers. Nevertheless, characteristics of the institutional and cultural environments of countries may affect relationship behaviour. Furthermore research on relationship marketing primarily focuses on the marketing activities of exporters from developed countries and much less attention is paid to the import side of the exchange process. Thus, the objective of this study is to empirically examine importer relationship performance in a Latin America context. This article proposes and tests a conceptual model that includes the antecedents and outcomes of trust and commitment with a survey of Chilean importers. The model uses confirmatory factor analysis (CFA) to develop the construct measures and structural equation modelling (SEMS) to test the model. The findings of this study contribute to a better understanding of the driving forces of trust and commitments and their influence on importing firms' performance in an emerging market context.