945 resultados para Infrastructure Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many economic, social and environmental sustainability problems associated with typical urban transportation systems have revealed the importance of three domains of action: vehicle, infrastructure and user. These domains need to be carefully reconsidered in search of a sustainable urban development path. Although intelligent transportation systems have contributed substantially to enhancing efficiency, safety and comfort of travel, questions related to users’ behaviours and preferences, which stimulate considerable environmental effects, still needed to be further examined. In this chapter, options for smart urban transportation infrastructure development and the technological means for achieving broader goals of sustainable communities and urban development are explored.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an age when escalating fuel prices, global warming and world resource depletion are of great concern, sustainable transport practices promise to define a new way of mobility into the future. With its comparatively minimal negative environmental impacts, non reliance on fuels and positive health effects, the simple bicycle ofers significant benefits to humankind. These benefits are evident worldwide where bicycles are successfully endorsed through improved infrastructure, supporting policies, public education and management. In Australia, the national, state and locall governments are introducing measures to improve and support green transport. This is necessary as current bicycle infrastructure is not always sufficient and the longstanding conflict with motorized transport still exists. The aim for the future is to implement sustainable hard and soft bicycle infrastructure globally; the challenges of such a task can be illustrated by the city of Brisbane, Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many South East Asian cities have experienced substantial physical, economic and social transformations during the past several decades. The rapid pace of globalisation and economic restructuring has resulted in these cities receiving the full impact of urbanisation pressures. In an attempt to ease these pressures, cities such as Singapore, Hong Kong and Kuala Lumpur have advocated growth management approaches focussing especially on urban infrastructure sustainability. These approaches aim to achieve triple bottom line sustainability by balancing economic and social development, and environmental protection. This chapter evaluates three Asia-Pacific city cases, Singapore, Hong Kong and Kuala Lumpur, and assesses their experiences in managing their urban forms and infrastructure whilst promoting sustainable patterns of urban development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, local government infrastructure management practices have evolved from conventional land use planning to more wide ranging and integrated urban growth and infrastructure management approaches. The roles and responsibilities of local government are no longer simply to manage daily operational functions of a city and provide basic infrastructure. Local governments are now required to undertake economic planning, manage urban growth; be involved in major infrastructure planning; and even engage in achieving sustainable development objectives. The Brisbane Urban Growth model has proven initially successful to ensure timely and coordinated delivery of urban infrastructure. This model may be the first step for many local governments to move toward an integrated, sustainable and effective infrastructure management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In sustainable development projects, as well as other types of projects, knowledge transfer is important for the organisations managing the project. Nevertheless, knowledge transfer among employees does not happen automatically and it has been found that the lack of social networks and the lack of trust among employees are the major barriers to effective knowledge transfer. Social network analysis has been recognised as a very important tool for improving knowledge transfer in the project environment. Transfer of knowledge is more effective where it depends heavily on social networks and informal dialogue. Based on the theory of social capital, social capital consists of two parts: conduits network and resource exchange network. This research studies the relationships among performance, the resource exchange network (such as the knowledge network) and the relationship network (such as strong ties network, energy network, and trust network) at the individual and project levels. The aim of this chapter is to present an approach to overcoming the lack of social networks and lack of trust to improve knowledge transfer within project-based organisations. This is to be done by identifying the optimum structure of relationship networks and knowledge networks within small and medium projects. The optimal structure of the relationship networks and knowledge networks is measured using two dimensions: intra-project and inter-project. This chapter also outlines an extensive literature review in the areas of social capital, knowledge management and project management, and presents the conceptual model of the research approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From 27 January to 8 February during the summer of 2009, southern Australia experienced one of the nation‘s most severe heatwaves. Governments, councils, utilities, hospitals and emergency response organisations and the community were largely underprepared for an extreme event of this magnitude. This case study targets the experience and challenges faced by decision makers and policy makers and focuses on the major metropolitan areas affected by the heatwave — Melbourne and Adelaide. The study examines the 2009 heatwave‘s characteristics; its impacts (on human health, infrastructure and human services); the degree of adaptive capacity (vulnerability and resilience) of various sectors, communities and individuals; and the reactive responses of government and emergency and associated services and their effectiveness. Barriers and challenges to adaptation and increasing resilience are also identified and further areas for research are suggested. This study does not include details of the heatwave‘s effects beyond Victoria and South Australia, or its economic impacts, or of Victoria‘s 'Black Saturday‘ bushfires.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose - This paper seeks to examine the complex relationships between urban planning, infrastructure management, sustainable urban development, and to illustrate why there is an urgent need for local governments to develop a robust planning support system which integrates with advance urban computer modelling tools to facilitate better infrastructure management and improve knowledge sharing between the community, urban planners, engineers and decision makers. Design/methodology/approach - The methods used in this paper includes literature review and practical project case observations. Originality/value - This paper provides an insight of how the Brisbane's planning support system established by Brisbane City Council has significantly improved the effectiveness of urban planning, infrastructure management and community engagement through better knowledge management processes. Practical implications - This paper presents a practical framework for setting up a functional planning support system within local government. The integration of the Brisbane Urban Growth model, Virtual Brisbane and the Brisbane Economic Activity Monitoring (BEAM) database have proven initially successful to provide a dynamic platform to assist elected officials, planners and engineers to understand the limitations of the local environment, its urban systems and the planning implications on a city. With the Brisbane's planning support system, planners and decision makers are able to provide better planning outcomes, policy and infrastructure that adequately address the local needs and achieve sustainable spatial forms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The collaboration of clinicians with basic science researchers is crucial for addressing clinically relevant research questions. In order to initiate such mutually beneficial relationships, we propose a model where early career clinicians spend a designated time embedded in established basic science research groups, in order to pursue a postgraduate qualification. During this time, clinicians become integral members of the research team, fostering long term relationships and opening up opportunities for continuing collaboration. However, for these collaborations to be successful there are pitfalls to be avoided. Limited time and funding can lead to attempts to answer clinical challenges with highly complex research projects characterised by a large number of "clinical" factors being introduced in the hope that the research outcomes will be more clinically relevant. As a result, the complexity of such studies and variability of its outcomes may lead to difficulties in drawing scientifically justified and clinically useful conclusions. Consequently, we stress that it is the basic science researcher and the clinician's obligation to be mindful of the limitations and challenges of such multi-factorial research projects. A systematic step-by-step approach to address clinical research questions with limited, but highly targeted and well defined research projects provides the solid foundation which may lead to the development of a longer term research program for addressing more challenging clinical problems. Ultimately, we believe that it is such models, encouraging the vital collaboration between clinicians and researchers for the work on targeted, well defined research projects, which will result in answers to the important clinical challenges of today.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia is just one of many developed countries facing the challenge of delivering value for money in the provision of a substantial infrastructure pipeline amidst severe construction and private finance constraints. To help address this challenge, this chapter focuses on developing an understanding of the determinants of value at key procurement decision points that range from the make-or-buy decision, to buying in the context of market structures, including the exchange relationship and contractual arrangement decision. This understanding is based on theoretical pluralism and illustrated by research in the field of construction and maintenance, and in public-private partnerships.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainable Urban and Regional Infrastructure Development: Technologies, Applications and Management, bridges the gap in the current literature by addressing the overall problems present in society's major infrastructures, and the technologies that may be applied to overcome these problems. It focuses on ways in which energy intensive but 'invisible' (to the general public) facilities can become green or greener. The studies presented re lessons to be learnt from our neighbors and from our own backyard, and provide an excellent general overview of the issues facing us all.