999 resultados para Project Independence.
Resumo:
Motorcycle trauma is a serious road safety issue in Queensland and throughout Australia. In 2009, Queensland Transport (later Transport and Main Roads or TMR) appointed CARRS-Q to provide a three-year program of Road Safety Research Services for Motorcycle Rider Safety. Funding for this research originated from the Motor Accident Insurance Commission. This program of research was undertaken to produce knowledge to assist TMR to improve motorcycle safety by further strengthening the licensing and training system to make learner riders safer by developing a pre-learner package (Deliverable 1), and by evaluating the QRide CAP program to ensure that it is maximally effective and contributes to the best possible training for new riders (Deliverable 2). The focus of this report is Deliverable 3 of the overall program of research. It identifies potential new licensing components that will reduce the incidence of risky riding and improve higher-order cognitive skills in new riders.
Resumo:
This showcase presents a preliminary analysis of a community service learning project designed to align more authentically with contemporary society and emerging constructs of professional knowledge. As described in the paper, the project involves a multidisciplinary group of students working collaboratively with a community organisation to find creative presponses to challenging issues concerning the organisation's identity, how it interfaces with stakeholders, and how it evidences its inclusive practice. Of particular interest is how the interdisciplinary practice of the students within a service learning context encouraged reconsideration of their world0view and their rols as future professionals. Also highlighted is the need for greater congruence between the goals of the project and the structural elements of the curriculum.
Resumo:
The Australian Research Council (ARC) Innovative Products Project aims to facilitate project innovation by exploring means to improve the diffusion of innovative products to road and bridge projects. It adopts a highly novel approach to achieve this end, developing three different ways of viewing the problem: (1) as a relational governance issue, (2) as an absorptive capacity issue and (3) as a knowlege intermediation issue. This report presents teh results of teh first phase of a three phase fieldwork program.
Resumo:
This article examines a cultural and creative industries park project – the White Horse Lake Ecocreative City on land outside the urban centre of Hangzhou, China, which uses an imaginary rural lifestyle as its key attraction. By analysing government policies and development plans, and through interviews with initiators, managers and creative practitioners, the article first assesses the geographical position, that is, the impact of locality with regard to both hard and soft infrastructure of the project; it then examines the synergies and tensions embedded in the strategic goals, that is, to build the right city for ‘four comforts’ (siyi, 四宜) – for residence, for business, for travel and for culture. The article concludes that Chinese-style cultural conversion remains locked in a top-down ideological framework, one that rural residents and the new ‘creative class’ are expected to respect.
Resumo:
Recent literature in project management has urged a re-conceptualisation of projects as a value co-creation process. Contrary to the traditional output-focused project methodology, the value creation perspective argues for the importance of creating new knowledge, processes, and systems for suppliers and customers. Stakeholder involvement is important in this new perspective, as the balancing of competing needs of stakeholders in mega projects becomes a major challenge in managing the value co-creation process. In this study we present interview data from three Australian defence mega projects to demonstrate that senior executives have a more complex understanding of project success than traditional iron triangle measures. In these mega defence projects, customers and other stakeholders actively engage in the value creation process, and over time both content and process value are created to increase defence and national capability. Value created and captured during and post projects are the key to true success.
Resumo:
The making of the modern world has long been fuelled by utopian images that are blind to ecologi- cal reality. Botanical gardens are but one example – who typically portray themselves as miniature, isolated 'edens on earth', whereas they are now in many cases self-evidently also the vital ‘lungs’ of crowded cities, as well as critical habitats for threat- ened biodiversity. In 2010 the 'Remnant Emergency Art lab' set out to question utopian thinking through a creative provocation called the 'Botanical Gardens ‘X-Tension’ - an imagined city-wide, distributed, network of 'ecological gardens' suited to both bat and human needs, in order to ask, what now needs to be better understood, connected and therefore ultimately conserved.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
The Making Connections: Innovations in Learning and Teaching Forum, jointly hosted by the Division of Technology, Information and Learning Support (TILS) and the Learning and Teaching Unit (LTU), was held on 20 June. The forum provided a snapshot of innovative practice across QUT, as well as an overview of services supporting innovation. Past events have attracted sizeable audiences and informal feedback has been very positive and encouraging. The objective of the forum is to give an opportunity to academic teaching staff to share their innovative practice with their peers, and it is planned that more events will be held to allow for further sharing of ideas. The program for the June 2012 forum included the following presentations: Ms Lindy Osborne: The 7pm Project Dr Ana Pavasovic: A multifaceted approach to teaching a first year unit Mr Paul Willis: Out of our comfort zone: How can Collaborate engage students in inclusive teaching practices Dr Kelly Zuniga: Can you draw what I see? Recasting the ‘crit’ to engage a larger classroom audience Dr Peter Bell, Dr Mark Lauchs, Amy Henderson and Edward Robinson: Crime Club: Lightbulb moments Dr Deboarh Peach: Improving student engagement through the integration of blended delivery approaches in WIL. Lindy Osborne Biography: As an early career academic, Lindy Osborne draws upon professional experience as a registered architect to offer students pioneering curricula that are firmly grounded in real-world practice. Since commencing her academic career in 2008, she has purposefully reconceptualised the delivery of Architectural Design, Technology, Professional Practice and Research subjects, using innovative digital technology and empowering students to direct their own learning. Lindy is cognisant of the impact that the physical learning environment has on students, and seeks to actively modify it to support students by enabling powerful enactive learning. Using technology embedded flexible learning spaces and innovative simulated office practice pedagogy,students actively learn in an authentic environment, redressing the structural and cyclical factors that have resulted in a lack of workplace learning opportunities. Lindy’s creative integration of interdisciplinary opportunities, popular culture, social media and Web-2.0 technologies connects with students on their level, while they develop critical professional skills both inside and perhaps more importantly outside, the formal classroom environment.
Resumo:
Since 2007 Kite Arts Education Program (KITE), based at Queensland Performing Arts Centre (QPAC), has been engaged in delivering a series of theatre-based experiences for children in low socio-economic primary schools in Queensland. The artist in residence (AIR) project titled Yonder includes performances developed by the children with the support and leadership of teacher artists from KITE for their community and parents/carers,supported by a peak community cultural institution. In 2009,Queensland Performing Arts Centre partnered with Queensland University of Technology (QUT) Creative Industries Faculty (Drama) to conduct a three-year evaluation of the Yonder project to understand the operational dynamics, artistic outputs and the educational benefits of the project. This paper outlines the research findings for children engaged in the Yonder project in the interrelated areas of literacy development and social competencies. Findings are drawn from six iterations of the project in suburban locations on the edge of Brisbane city and in regional Queensland.
Resumo:
This paper summarises the achievements of the Smart Skies Project, a three-year, multi-award winning international project that researched, developed and extensively flight tested four enabling aviation technologies: an electrooptical mid-air collision avoidance system, a static obstacle avoidance system, a mobile ground-based air traffic surveillance system, and a global automated airspace separation management system. The project included the development of manned and unmanned flight test aircraft, which were used to characterise the performance of the prototype systems for a range of realistic scenarios under a variety of environmental conditions. In addition to the collection of invaluable flight data, the project achieved world-firsts in the demonstration of future automated collision avoidance and separation management concepts. This paper summarises these outcomes, the overall objectives of the project, the research and the development of the prototype systems, the engineering of the flight test systems, and the results obtained from flight-testing.
Resumo:
Buildings are key mediators between human activity and the environment around them, but details of energy usage and activity in buildings is often poorly communicated and understood. ECOS is an Eco-Visualization project that aims to contextualize the energy generation and consumption of a green building in a variety of different climates. The ECOS project is being developed for a large public interactive space installed in the new Science and Engineering Centre of the Queensland University of Technology that is dedicated to delivering interactive science education content to the public. This paper focuses on how design can develop ICT solutions from large data sets to create meaningful engagement with environmental data.
Resumo:
Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.
Resumo:
The Pattern and Structure Mathematics Awareness Project (PASMAP) has investigated the development of patterning and early algebraic reasoning among 4 to 8 year olds over a series of related studies. We assert that an awareness of mathematical pattern and structure enables mathematical thinking and simple forms of generalisation from an early age. The project aims to promote a strong foundation for mathematical development by focusing on critical, underlying features of mathematics learning. This paper provides an overview of key aspects of the assessment and intervention, and analyses of the impact of PASMAP on students’ representation, abstraction and generalisation of mathematical ideas. A purposive sample of four large primary schools, two in Sydney and two in Brisbane, representing 316 students from diverse socio-economic and cultural contexts, participated in the evaluation throughout the 2009 school year and a follow-up assessment in 2010. Two different mathematics programs were implemented: in each school, two Kindergarten teachers implemented the PASMAP and another two implemented their regular program. The study shows that both groups of students made substantial gains on the ‘I Can Do Maths’ assessment and a Pattern and Structure Assessment (PASA) interview, but highly significant differences were found on the latter with PASMAP students outperforming the regular group on PASA scores. Qualitative analysis of students’ responses for structural development showed increased levels for the PASMAP students; those categorised as low ability developed improved structural responses over a relatively short period of time.
Resumo:
The starting point for this presentation is that applicants provide a large surplus of information when submitting a NHMRC Project Grant proposal for funding. This is costly in their time, attracts high administration costs, makes the task appear daunting for peer reviewers and may reduce the quality of the peer review leading to less than perfect reliability in decision making. We are currently experimenting with alternate models to see whether similar reliability in funding outcomes are achieved at less cost. We will compare traditional NHMRC Grant Review Panels (GRPs) with panels that use less information and journal style panels. By way of background to this experimental work, we will show some results on current levels of reliability for GRPs, the costs incurred by all who participate in Project Grant selection, and the level of reliability acceptable to researchers. By experimenting in this way and building an evidence base for how research funding should be allocated, the NHMRC is showing international leadership in this important field.