985 resultados para Process optimisation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

We address a real world scheduling problem concerning the repair process of aircrafts’ engines by TAP - Maintenance & Engineering (TAP-ME). TAP-ME is the maintenance, repair and overhaul organization of TAP Portugal, Portugal’s leading airline, which employs about 4000 persons to provide maintenance and engineering services in aircraft, engines and components. TAP-ME is aiming to optimize its maintenance services, focusing on the reduction of the engines repair turnaround time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this talk, we discuss a scheduling problem that originated at TAP - Maintenance & Engineering - the maintenance, repair and overhaul organization of Portugal’s leading airline. In the repair process of aircrafts’ engines, the operations to be scheduled may be executed on a certain workstation by any processor of a given set, and the objective is to minimize the total weighted tardiness. A mixed integer linear programming formulation, based on the flexible job shop scheduling, is presented here, along with computational experiment on a real instance, provided by TAP-ME, from a regular working week. The model was also tested using benchmarking instances available in literature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada para a obtenção do Grau de Doutor em Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Biotecnologia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertation presented to obtain the Ph.D degree in Biology

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Civil Perfil de Estruturas e Geotecnia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study proposes a new methodology to increase the power delivered to any load point in a radial distribution network, through the identification of new investments in order to improve the repair time. This research work is innovative and consists in proposing a full optimisation model based on mixed-integer non-linear programming considering the Pareto front technique. The goal is to achieve a reduction in repair times of the distribution networks components, while minimising the costs of that reduction as well as non-supplied energy costs. The optimisation model considers the distribution network technical constraints, the substation transformer taps, and it is able to choose the capacitor banks size. A case study based on a 33-bus distribution network is presented in order to illustrate in detail the application of the proposed methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent Advances in Mechanics and Materials in Design

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Doutor em Bioengenharia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Until this day, the most efficient Cu(In,Ga)Se2 thin film solar cells have been prepared using a rather complex growth process often referred to as three-stage or multistage. This family of processes is mainly characterized by a first step deposited with only In, Ga and Se flux to form a first layer. Cu is added in a second step until the film becomes slightly Cu-rich, where-after the film is converted to its final Cu-poor composition by a third stage, again with no or very little addition of Cu. In this paper, a comparison between solar cells prepared with the three-stage process and a one-stage/in-line process with the same composition, thickness, and solar cell stack is made. The one-stage process is easier to be used in an industrial scale and do not have Cu-rich transitions. The samples were analyzed using glow discharge optical emission spectroscopy, scanning electron microscopy, X-ray diffraction, current–voltage-temperature, capacitance-voltage, external quantum efficiency, transmission/reflection, and photoluminescence. It was concluded that in spite of differences in the texturing, morphology and Ga gradient, the electrical performance of the two types of samples is quite similar as demonstrated by the similar J–V behavior, quantum spectral response, and the estimated recombination losses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Based on the report for “Project IV” unit of the PhD programme on Technology Assessment (Doctoral Conference) at Universidade Nova de Lisboa (December 2011). This thesis research has the supervision of António Moniz (FCT-UNL and ITAS-KIT) and Michael Decker (Karlsruhe Institute of Technology-ITAS). Other members of the thesis committee are Carlos Alberto da Silva (University of Évora), José Maria de Albuquerque (Institute of Welding and Quality), Lotte Steuten (University of Twente), Mário Forjaz Secca (FCT-UNL) and Nelson Chibeles Martins (FCT-UNL).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A indústria automóvel necessita aumentar a produtividade de forma sistemática, com vista à redução de custos e incremento da competitividade. A otimização dos produtos e processos é uma constante. O presente trabalho foi solicitado pela empresa FicoCables, do Grupo FICOSA, tendo em vista a otimização do processo de injeção de pequenas peças injetadas em ZAMAK, que constituem o bloqueio na extremidade de cada cabo metálico inserido nos automóveis para abertura da mala, portas, travão de mão, reservatório de combustível, capô, etc. A empresa possui cerca de 52 equipamentos de injeção de ZAMAK, cuja temperatura dos bicos era mantida com base numa chama de gás. Os sucessivos problemas de controlo do sistema ditaram uma mudança estratégica no aquecimento desses bicos, passando a ser usadas resistências elétricas anelares. No entanto, esta mudança veio a apresentar problemas inesperados, os quais se vieram inclusivamente a tornar em problemas de segurança, devido ao desgaste interior prematuro dos bicos, os quais apresentaram esmo problema de rotura. Paralelamente, todos os parâmetros relacionados com este processo de fabrico estavam também estudados de forma algo incipiente, pelo que se tornou necessário compreender e dissecar todas as variáveis relacionadas com o processo e implementar sistemas que impedissem o ajuste não controlado dos parâmetros por parte dos operadores. Também os moldes foram alvo de ações de melhoria, com vista a evitar problemas na zona de contacto do bico com o molde. O processo foi analisado em pormenor, permitindo um controlo muito mais apurado do mesmo. Os resultados fizeram sentir-se de forma imediata, graças ao trabalho desenvolvido neste estudo e à abertura demonstrada pela empresa para implementar todas as soluções propostas. O resultado final traduz-se num incremento significativo da segurança para os operadores, num controlo muito mais apurado de todos os parâmetros envolvidos no processo, numa maior garantia da qualidade nos produtos injetados em ZAMAK e em ganhos financeiros significativos para a empresa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial