992 resultados para product cycle
Resumo:
Open innovation is a hot topic in innovation management. Its basic premise is open up the innovation process. The innovation process, in general sense, may be seen as the process of designing, developing and commercializing a novel product or service to improve the value added of a company. The development of Web 2.0 tools facilitates this kind of contributions, opening space to the emergence of crowdsourcing innovation initiatives. Crowdsourcing is a form of outsourcing not directed to other companies but to the crowd by means of an open call mostly through an Internet platform. Innovation intermediaries, in general sense, are organizations that work to enable innovation, that just act as brokers or agents between two or more parties. Usually, they are also engaged in other activities like inter-organizational networking and technology development and related activities. A crowdsourcing innovation intermediary is an organization that mediates the communication and relationship between the seekers – companies that aspire to solve some problem or to take advantage of any business opportunity – with a crowd that is prone to give ideas based on their knowledge, experience and wisdom. This paper identifies and analyses the functions to be performed by an intermediary of crowdsourcing innovation through grounded theory analyses from literature. The resulting model is presented and explained. The resulting model summarizes eight main functions that can be performed by a crowdsourcing process, namely, diagnoses, mediation, linking knowledge, community, evaluation, project management, intellectual property governance and marketing and support. These functions are associated with a learning cycle process which covers all the crowdsourcing activities that can be realized by the broker.
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Electrotécnica e de Computadores
Resumo:
A manutenção é uma área extremamente importante, principalmente na indústria. Devidamente organizada, permitirá um fluxo produtivo devidamente planeado e executado, que permitirá a qualquer empresa manter o nível de facturação desejado e o prazo de entrega acordado com os clientes. De outra forma, poderá originar o caos. No entanto, os desafios de gestão da produção mais correntes, nomeadamente através do Lean Manufacturing, passam a exigir um pouco mais do que uma simples manutenção. Torna-se obrigatório fazer análises económicas que permitam averiguar quando cada equipamento passa a exigir custos de manutenção excessivos, os quais poderão obrigar a um recondicionamento mais acentuado do equipamento, o qual pode passar inclusivamente por uma melhoria da sua performance. Nestes casos, terá que existir uma “cumplicidade” entre a Direcção de Produção e a Manutenção, no sentido de averiguar o melhor momento para proceder a uma melhoria do equipamento, numa perspectiva de funcionamento global em linha de produção, adaptando-o à performance que será exigida ao conjunto. Neste domínio, o Projecto passa a prestar um serviço valiosíssimo à empresa, integrando-se no conjunto Produção + Manutenção, criando valor na intervenção, através do desenvolvimento de um trabalho que permite não só repor o estado natural da produção, mas sim promover uma melhoria sustentada da mesma. Este trabalho pretende reflectir e avaliar a relevância do Projecto neste tipo de operações, contribuindo de uma forma sistemática e sustentada para a melhoria contínua dos processos de fabrico. É apresentado um caso de estudo que pretende validar todo o desenvolvimento anteriormente realizado na matéria.
Resumo:
Involuntary rhythmic leg movements in childhood is an uncommon condition, the generators of which remain unknown. We report on a male 3 years of age with distinct features providing important clues concerning the location of one of these generators. At the age of 7 months, the previously healthy young male started with low frequency, rhythmic, and continuous (both during wakefulness and sleep) flexion/extension movements of the lower limbs. Movements interfered significantly with gait acquisition, and, despite normal cognitive development, he was able to walk only at age 2 years, 4 months. The neurologic examination revealed the absence of automatic stepping in the neonatal period, but was otherwise normal. A polygraphic electroencephalogram/electromyogram EEG/EMG) recording, at the age of 2 years, 9 months, revealed rhythmic and synchronous legs with EMG activity at 0.5 Hz. A more complete polygraphic recording at the age of 3 years, 10 months, showed a lower frequency (0.35 Hz) for the movements, which were time-locked with the respiratory cycle. Magnetic resonance imaging (MRI) of the brain revealed an increased T2 signal in the upper medulla-lower pons regions. The generator of the rhythmic legs movements is postulated to be the respiratory center, connecting with the reticulospinal projecting neurons through an aberrant pathway.
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Electrotécnica e de Computadores
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Informática
Resumo:
In the present paper the life cycle of Triatoma sordida was studied. The mean length from egg to adult was 213 days. The mean length in days from each stage was: 24.3 (± 1.30) for the first. 32.8 (± 1.45) (2nd), 36.1 (± 1.50) (3rd), 44.6 (± 1.85) (4th) and 52.0 (± 1.92) (5th). The mean egg incubation períod was 23.2 (± 1.40). Overall mortality was 18.8% and egg viability was 82.5%.
Resumo:
In the present paper the life cycle of Rhodnius neglectus was studied. The mean length from egg to adult was 119 days. The mean length in day from each stage was: 17.4 (± 1.15) for first, 18.2 (± 1.28) for second, fourth and 29.8 (± 1.46) for fifth.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
In the present work the life cycle of Psammolestes tertius was studied. The mean length, in days, fromeach stage was: 26.3 (± 1.7) (1st), 28.6 (± 1.8) (2nd), 28.4 (± 1.8) (3rd), 32.2 (± 1.9) (4th) and 33.5 (± 5.8) (5th). The mean egg incubation period was 15.7 days (± 1.7). Overall mortality was 48.9% and egg viability was 65.7%.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
Dissertation presented to obtain the Ph.D degree in Biology, Cell Biology
Resumo:
Based on the presentation and discussion at the 3rd Winter School on Technology Assessment, December 2012, Universidade Nova de Lisboa (Portugal), Caparica Campus, PhD programme on Technology Assessment