988 resultados para Project goal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Along with reduced levels of physical activity, older Australian's mean energy consumption has increased. Now over 60% of older Australians are considered overweight or obese. This study aims to confirm if a low-cost, accessible physical activity and nutrition program can improve levels of physical activity and diet of insufficiently active 60-70 year-olds. Methods/Design This 12-month home-based randomised controlled trial (RCT) will consist of a nutrition and physical activity intervention for insufficiently active people aged 60 to 70 years from low to medium socio-economic areas. Six-hundred participants will be recruited from the Australian Federal Electoral Role and randomly assigned to the intervention (n = 300) and control (n = 300) groups. The study is based on the Social Cognitive Theory and Precede-Proceed Model, incorporating voluntary cooperation and self-efficacy. The intervention includes a specially designed booklet that provides participants with information and encourages dietary and physical activity goal setting. The booklet will be supported by an exercise chart, calendar, bi-monthly newsletters, resistance bands and pedometers, along with phone and email contact. Data will be collected over three time points: pre-intervention, immediately post-intervention and 6-months post-study. Discussion This trial will provide valuable information for community-based strategies to improve older adults' physical activity and dietary intake. The project will provide guidelines for appropriate sample recruitment, and the development, implementation and evaluation of a minimal intervention program, as well as information on minimising barriers to participation in similar programs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Georgia’s ‘National Integrity Systems’ are the institutions, laws, procedures, practices and attitudes that encourage and support integrity in the exercise of power in modern Georgian society. Integrity systems function to ensure that power is exercised in a manner that is true to the values, purposes and duties for which that power is entrusted to, or held by, institutions and individual office-holders. This report presents the results of the Open Society Institute / Open Society – Georgia Foundation funded project Georgian National Integrity Systems Assessment (GNISA), conducted in 2005–2006 by Caucasus Institute for Peace, Democracy and Development, Transparency International Georgia, Georgian Young Lawyers Association, in close cooperation with Griffith University Institute for Ethics, Governance and Law (Australia), and Tiri Group (UK), into how different elements of integrity systems interact, which combinations of institutions and reforms make for a strong integrity system, and how Georgia’s integrity systems should evolve to ensure coherence, not chaos in the way public integrity is maintained. Nevertheless all participants of the research may not share some conclusions given in the GNISA report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Healthy and sustainable food is gaining more attention from consumers, industry, and researchers. Yet many approaches to date are limited to information dissemination, advertisement or education. We have embarked on a three year collaborative research project (2011 – 2013) to explore urban food practices – eating, cooking, growing food – to support the well-being of people and the environment. Our overall goal is to employ a user-centred interaction design research approach to inform the development of entertaining, real-time, mobile and networked applications, engaging playful feedback to build motivation. Our aspiration for this study is to deliver usable and useful mobile and situated interaction prototypes that employ individual and group strategies to foster food cultures that provide new pathways to produce, share and enjoy food that is green, healthy, and fun.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports findings from an ongoing collaborative research project with the Financial Services Council (FSC), which contributed funding and facilitated the survey of financial planners’ clients through FSC member organisations. The article draws on the report to the FSC that was prepared by the QUT researchers, reporting findings on the initial exploratory stage of the project.1 The lyric in the title of this paper has become a catchcry for consumers dissatisfied with a range of financial services and products, and, as recent Federal Government inquiries have revealed, there is some truth to the claim. But as financial planning undergoes a series of reforms, including increased professionalism (FPA 2009) and improved quality of advice (Australian Government 2011), there are good reasons to explore the conditions under which clients report satisfaction with their financial planners; not least because the provision of effective financial planning and advice, delivered in accordance with, or transcending, the rules and norms of industry best-practice has the potential to benefit clients, not just financially, but across a number of life domains. In this paper, we report findings from an exploratory study investigating whether financial planning and advice contribute to client well-being, beyond effects on financial well-being. While anecdotal evidence supports psychological benefits such as a sense of security, little research has explored these links in any systematic or theoretically driven way. However, theory and research from cognate disciplines, such as psychology, indicate clear links between planning, goal setting and well-being that are likely to arise in the financial planning domain. Surveyed clients were asked to indicate their satisfaction with their financial advisers, the planning process and the advice they received. Clients responded to items designed to reflect key areas for financial planners in the shift towards increased professionalism, improved disclosure and greater client focus (e.g. FPA 2009). Clients also reflected on their financial situations before and after seeing their advisers, and considered the impact of their financial situations on a number of life areas including family relationships, mental health and well-being, and overall life satisfaction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sing & Grow is an early intervention music therapy project presented to families with additional needs, or those at risk of experiencing disadvantage due to social and/or economic circumstances that may impact on their parenting experiences. The aim of the project is to provide short term music therapy programs to families in communities where access to such services may be limited. The program is strengths-based and focuses on building upon a parent’s capacity to relate to and respond to their child’s emotional and developmental needs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sing & Grow is a short term early intervention music therapy program for at risk families. Sing & Grow uses music to strengthen parent-child relationships by increasing positive parent-child interactions, assisting parents to bond with their children, and extending the repertoire of parents’ skills in relating to their child through interactive . Both the Australian and New Zealand governments are looking for evidence based research to highlight the effectiveness of funded programs in early childhood. As a government funded program, independent evaluation is a requirement of the delivery of the service. This paper explains the process involved in setting up and managing this large scale evaluation from engaging the evaluators and designing the project, to the data gathering stage. It describes the various challenges encountered and concludes that a highly collaborative and communicative partnership bet en researchers and clinicians is essential to ensure data can be gathered with minimal disturbance to clinical music therapy practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A program’s development and implementation in a higher education institution is usually launched with great fanfare, goodwill and a huge effort on the part of the whole development team to ensure a worthwhile cohesive set of learning experiences aligned to the desired course learning outcomes. It is often not long before the glue starts to come unstuck arising from staffing changes, subtle migration of course resources, opportunistic inclusions of “off the shelf” or unit based innovative teaching and learning approaches, and perhaps general poor attention to detail with regard to the impact of new introductions and electives. This paper presents an initial investigation into the elusive goal of achieving course cohesion. The authors consider building cohesion into a course as it is being designed through identified cohesion factors and in sustaining course cohesion through active leadership.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has recently been noted a rapid increase in research attention to projects that involve outside partners. Our knowledge of such inter-organizational projects, however, is limited. This paper reports large scale data from a repeated trend survey amongst 2000 SMEs in 2006 and 2009 that focused on inter-organizational project ventures. Our major findings indicate that the overall prevalence of inter-organizational project ventures remained significant and stable over time, even despite the economic crisis. Moreover, we find that these ventures predominantly solve repetitive rather than unique tasks and are embedded in prior relations between the partnering organizations. These findings provide empirical support for the recent claims that project management should pay more attention to inter-organizational forms of project organization, and suggest that the archetypical view of projects as being unique in every respect should be reconsidered. Both have important implications for project management, especially in the area of project-based learning.