927 resultados para Project 2006-036-A : Multi-Outcome Construction Policies


Relevância:

100.00% 100.00%

Publicador:

Resumo:

During the project, managers encounter numerous contingencies and are faced with the challenging task of making decisions that will effectively keep the project on track. This task is very challenging because construction projects are non-prototypical and the processes are irreversible. Therefore, it is critical to apply a methodological approach to develop a few alternative management decision strategies during the planning phase, which can be deployed to manage alternative scenarios resulting from expected and unexpected disruptions in the as-planned schedule. Such a methodology should have the following features but are missing in the existing research: (1) looking at the effects of local decisions on the global project outcomes, (2) studying how a schedule responds to decisions and disruptive events because the risk in a schedule is a function of the decisions made, (3) establishing a method to assess and improve the management decision strategies, and (4) developing project specific decision strategies because each construction project is unique and the lessons from a particular project cannot be easily applied to projects that have different contexts. The objective of this dissertation is to develop a schedule-based simulation framework to design, assess, and improve sequences of decisions for the execution stage. The contribution of this research is the introduction of applying decision strategies to manage a project and the establishment of iterative methodology to continuously assess and improve decision strategies and schedules. The project managers or schedulers can implement the methodology to develop and identify schedules accompanied by suitable decision strategies to manage a project at the planning stage. The developed methodology also lays the foundation for an algorithm towards continuously automatically generating satisfactory schedule and strategies through the construction life of a project. Different from studying isolated daily decisions, the proposed framework introduces the notion of {em decision strategies} to manage construction process. A decision strategy is a sequence of interdependent decisions determined by resource allocation policies such as labor, material, equipment, and space policies. The schedule-based simulation framework consists of two parts, experiment design and result assessment. The core of the experiment design is the establishment of an iterative method to test and improve decision strategies and schedules, which is based on the introduction of decision strategies and the development of a schedule-based simulation testbed. The simulation testbed used is Interactive Construction Decision Making Aid (ICDMA). ICDMA has an emulator to duplicate the construction process that has been previously developed and a random event generator that allows the decision-maker to respond to disruptions in the emulation. It is used to study how the schedule responds to these disruptions and the corresponding decisions made over the duration of the project while accounting for cascading impacts and dependencies between activities. The dissertation is organized into two parts. The first part presents the existing research, identifies the departure points of this work, and develops a schedule-based simulation framework to design, assess, and improve decision strategies. In the second part, the proposed schedule-based simulation framework is applied to investigate specific research problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this research project is to investigate project delivery as it relates to construction projects to help support the Department of Transportation's vision. The project delivery goals of the Agency as it relates to this research include: Fifty percent of construction projects are completed on schedule ; Ninety-five percent of projects are closed out within 270 days ; Seventy-five percent of construction projects are authorized on schedule. The goals of this project are to determine what factors contribute to unsuccessful project delivery and determine how these factors can be improved. This project will mainly investigate Construction roles during the Preconstruction phase of the project as well as examine the project during construction and identify areas that prohibit effective and timely project delvery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este artigo foi uma das publicações resultantes do projeto financiado pela FCT "Música e Drama no 1º ciclo do Ensino básico – o caso da Região Autónoma da Madeira" (PTDC/CED/72112/2006).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho apresentado no âmbito do Mestrado em Engenharia Informática, como requisito parcial para obtenção do grau de Mestre em Engenharia Informática

Relevância:

100.00% 100.00%

Publicador:

Resumo:

No âmbito da unidade curricular Dissertação/Projeto/Estágio do 2º ano do Mestrado em Engenharia mecânica – Ramo Gestão Industrial do Instituto Superior de Engenharia do Porto, o presente trabalho de dissertação foi enquadrado num projeto de desenvolvimento de ferramentas de apoio à gestão de projetos. O projeto foi desenvolvido no Instituto de Engenharia Mecânica e Gestão Industrial (INEGI) na unidade de Desenvolvimento de Produto e Sistemas (DPS). A realização deste projeto teve como objetivo o desenvolvimento e adequação de ferramentas de apoio à gestão de multi-projeto no processo de desenvolvimento de produto na organização em estudo – o INEGI – DPS. A gestão de projetos tem hoje uma grande importância nos resultados das empresas essencialmente em virtude da necessidade de estas competirem num mundo em grande mudança com concorrentes ferozes, em que a capacidade de responder às mudanças a tempo e de uma forma integrada se torna cada vez mais importante. A atividade levada a cabo pela DPS impõe a necessidade de uma gestão de projetos mais eficaz e eficiente suportada numa gestão de informação centralizada. O presente projeto de investigação teve, numa primeira fase, uma adaptação à organização em estudo. De seguida, foi conduzida uma revisão da literatura com o objetivo de se obter a fundamentação teórica necessária ao desenvolvimento de ferramentas com base nas metodologias lean. Prosseguiu com o levantamento da situação inicial da organização e com a identificação dos problemas existentes na gestão de projetos. Incluiu também uma revisão e análise das ferramentas existentes na unidade em estudo. Este conhecimento permitiu delinear uma visão para guiar o desenvolvimento das ferramentas. Após a definição da visão foi, então, realizado o desenvolvimento das ferramentas de auxílio à gestão multi-projeto na organização. A concretização deste trabalho resultou no desenvolvimento de três ferramentas de auxílio à gestão multi-projeto na unidade. Estas ferramentas tornam o processo de gestão de projetos mais simples e fácil de assimilar, requerendo apenas alguns inputs por parte dos colaboradores. Estas ferramentas estão apoiadas nos pilares do lean, e deste modo estão vocacionadas para reduzir o desperdício, promover a melhoria contínua, aumentar o desempenho global dos vários atores nos projetos de modo a entregar mais valor e qualidade superior com menores custos. Acima de tudo, valorizar o trabalho dos colaboradores, tornando-os mais eficientes, eficazes, motivados e comprometidos com a organização.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho de Projeto

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Using media discourse analysis for material published by the press on schistomisasis in the city of Jaboticatubas, the possible determining factors of narrative and discursive constructions in the diffusion of information are discussed. It was observed that media discourse treats schistosomiasis in 1962 as something from the natural order. By 1997 and 1998, the media discourse strategies reveal ideological treatment in favor of certain social segments. Situations are identified in which social agents in specific contexts construct the meanings of this endemic disease. It was concluded that the economic organization of space was a determining factor in the production and circulation of the media discourses.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The case company in this study is a large industrial engineering company whose business is largely based on delivering a wide-range of engineering projects. The aim of this study is to create and develop a fairly simple Excel-based tool for the sales department. The tool’s main function is to estimate and visualize the profitability of various small projects. The study also aims to find out other possible and more long-term solutions for tackling the problem in the future. The study is highly constructive and descriptive as it focuses on the development task and in the creation of a new operating model. The developed tool focuses on estimating the profitability of the small orders of the selected project portfolio currently on the bidding-phase (prospects) and will help the case company in the monthly reporting of sales figures. The tool will analyse the profitability of a certain project by calculating its fixed and variable costs, then further the gross margin and operating profit. The bidding phase of small project is a phase that has not been covered fully by the existing tools within the case company. The project portfolio tool can be taken into use immediately within the case company and it will provide fairly accurate estimate of the profitability figures of the recently sold small projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Esta investigación se centra en la Fédération Internationale de Football Association (FIFA) como organización política. Intenta responder dos interrogantes primordiales: 1) ¿cómo la FIFA ha constituido el poder que tiene actualmente y, así, hacerse del monopolio indiscutido del fútbol? Y 2) ¿cómo ha cambiado en el tiempo la política interna de FIFA y su vínculo con la política internacional? Para lograr esto, se realiza un estudio histórico, basado principalmente en documentos, que intenta caracterizar y analizar los cambios de la organización en el tiempo. Se enfatizan las últimas dos presidencias de FIFA, de João Havelange y Joseph Blatter, como casos de estudio.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.