868 resultados para Approach to CSR development


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design of medical devices could be very much improved if robust tools were available for computational simulation of tissue response to the presence of the implant. Such tools require algorithms to simulate the response of tissues to mechanical and chemical stimuli. Available methodologies include those based on the principle of mechanical homeostasis, those which use continuum models to simulate biological constituents, and the cell-centred approach, which models cells as autonomous agents. In the latter approach, cell behaviour is governed by rules based on the state of the local environment around the cell; and informed by experiment. Tissue growth and differentiation requires simulating many of these cells together. In this paper, the methodology and applications of cell-centred techniques-with particular application to mechanobiology-are reviewed, and a cell-centred model of tissue formation in the lumen of an artery in response to the deployment of a stent is presented. The method is capable of capturing some of the most important aspects of restenosis, including nonlinear lesion growth with time. The approach taken in this paper provides a framework for simulating restenosis; the next step will be to couple it with more patient-specific geometries and quantitative parameter data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Archaeological excavation has provided an alternative source of evidence for the development of the late medieval peasant house. It is argued that whilst there was a significant change in building techniques in the decades around 1200 with the adoption of ground-set timbers, the most important factor which led to the survival of houses was a fall in real wages during the thirteenth century. This encouraged peasants to repair existing buildings, rather than replace them with new ones. Alternative traditions of building are also investigated. Stone construction was adopted in a number of areas of England, but in spite of the durability of the material, few medieval peasant buildings of this type have survived in use because of the failure to use lime mortar. Decisions about whether to invest in a building’s renovation will depend on the capital initially expended upon it. This interpretation is considered against the data from the fifteenth century and found to conform satisfactorily. Its implications are considered for the period between 1200 and 1350. Data collected from archaeological excavations combined with the results of dendrochronology on a growing number of closely dated standing buildings suggest that there was a significant ‘cull’ of houses in the period after 1350 as new dwellings were constructed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agile methodologies have become the standard approach to software development. The most popular and used one is Scrum. Scrum is a very simple and flexible framework that respond to unpredictability in a really effective way. However, his implementation must be correct, and since Scrum tells you what to do but not how to do it, this is not trivial. In this thesis I will describe the Scrum Framework, how to implement it and a tool that can help to do this. The thesis is divided into three parts. The first part is called Scrum. Here I will introduce the framework itself, its key concepts and its components. In Scrum there are three components: roles, meetings and artifacts. Each of these is meant to accomplish a series of specific tasks. After describing the “what to do”, in the second part, Best Practices, I will focus on the “how to do it”. For example, how to decide which items should be included in the next sprint, how to estimate tasks, and how should the team workspace be. Finally, in the third part called Tools, I will introduce Visual Studio Online, a cloud service from Microsoft that offers Git and TFVC repositories and the opportunity to manage projects with Scrum. == Versione italiana: I metodi Agile sono diventati l’approccio standard per lo sviluppo di software. Il più famoso ed utilizzato è Scrum. Scrum è un framework molto semplice e flessibile che risponde ai cambiamenti in una maniera molto efficace. La sua implementazione deve però essere corretta, e visto che Scrum ci dice cosa fare ma non come farlo, questo non risulta essere immediato. In questa tesi descriverò Scrum, come implementarlo ed uno strumento che ci può aiutare a farlo. La tesi è divisa in tre parti. La prima parte è chiamata Scrum. Qui introdurrò il framework, i suoi concetti base e le sue componenti. In Scrum ci sono tre componenti: i ruoli, i meeting e gli artifact. Ognuno di questi è studiato per svolgere una serie di compiti specifici. Dopo aver descritto il “cosa fare”, nella seconda parte, Best Practices, mi concentrerò sul “come farlo”. Ad esempio, come decidere quali oggetti includere nella prossima sprint, come stimare ogni task e come dovrebbe essere il luogo di lavoro del team. Infine, nella terza parte chiamata Tools, introdurrò Visual Studio Online, un servizio cloud della Microsoft che offre repository Git e TFVC e l’opportunità di gestire un progetto con Scrum.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A multitude of products, systems, approaches, views and notions characterize the field of e-learning. This article attempts to disentangle the field by using economic and sociological theories, theories of marketing management and strategy as well as practical experience gained by the author while working with leading edge suppliers of e-learning. On this basis, a distinction between knowledge creation e-learning and knowledge transfer e-learning is made. The various views are divided into four different ideal-typical paradigms, each with its own characteristics and limitations. Selecting the right paradigm to use in the development of an e-learning strategy may prove crucial to success. Implications for the development of an e-learning strategy in businesses and educational institutions are outlined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pervasive computing applications must be engineered to provide unprecedented levels of flexibility in order to reconfigure and adapt in response to changes in computing resources and user requirements. To meet these challenges, appropriate software engineering abstractions and infrastructure are required as a platform on which to build adaptive applications. In this paper, we demonstrate the use of a disciplined, model-based approach to engineer a context-aware Session Initiation Protocol (SIP) based communication application. This disciplined approach builds on our previously developed conceptual models and infrastructural components, which enable the description, acquisition, management and exploitation of arbitrary types of context and user preference information to enable adaptation to context changes

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research is concerned with the development of distributed real-time systems, in which software is used for the control of concurrent physical processes. These distributed control systems are required to periodically coordinate the operation of several autonomous physical processes, with the property of an atomic action. The implementation of this coordination must be fault-tolerant if the integrity of the system is to be maintained in the presence of processor or communication failures. Commit protocols have been widely used to provide this type of atomicity and ensure consistency in distributed computer systems. The objective of this research is the development of a class of robust commit protocols, applicable to the coordination of distributed real-time control systems. Extended forms of the standard two phase commit protocol, that provides fault-tolerant and real-time behaviour, were developed. Petri nets are used for the design of the distributed controllers, and to embed the commit protocol models within these controller designs. This composition of controller and protocol model allows the analysis of the complete system in a unified manner. A common problem for Petri net based techniques is that of state space explosion, a modular approach to both the design and analysis would help cope with this problem. Although extensions to Petri nets that allow module construction exist, generally the modularisation is restricted to the specification, and analysis must be performed on the (flat) detailed net. The Petri net designs for the type of distributed systems considered in this research are both large and complex. The top down, bottom up and hybrid synthesis techniques that are used to model large systems in Petri nets are considered. A hybrid approach to Petri net design for a restricted class of communicating processes is developed. Designs produced using this hybrid approach are modular and allow re-use of verified modules. In order to use this form of modular analysis, it is necessary to project an equivalent but reduced behaviour on the modules used. These projections conceal events local to modules that are not essential for the purpose of analysis. To generate the external behaviour, each firing sequence of the subnet is replaced by an atomic transition internal to the module, and the firing of these transitions transforms the input and output markings of the module. Thus local events are concealed through the projection of the external behaviour of modules. This hybrid design approach preserves properties of interest, such as boundedness and liveness, while the systematic concealment of local events allows the management of state space. The approach presented in this research is particularly suited to distributed systems, as the underlying communication model is used as the basis for the interconnection of modules in the design procedure. This hybrid approach is applied to Petri net based design and analysis of distributed controllers for two industrial applications that incorporate the robust, real-time commit protocols developed. Temporal Petri nets, which combine Petri nets and temporal logic, are used to capture and verify causal and temporal aspects of the designs in a unified manner.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents an account of an attempt to utilize expert systems within the domain of production planning and control. The use of expert systems was proposed due to the problematical nature of a particular function within British Steel Strip Products' Operations Department: the function of Order Allocation, allocating customer orders to a production week and site. Approaches to tackling problems within production planning and control are reviewed, as are the general capabilities of expert systems. The conclusions drawn are that the domain of production planning and control contains both `soft' and `hard' problems, and that while expert systems appear to be a useful technology for this domain, this usefulness has by no means yet been demonstrated. Also, it is argued that the main stream methodology for developing expert systems is unsuited for the domain. A problem-driven approach is developed and used to tackle the Order Allocation function. The resulting system, UAAMS, contained two expert components. One of these, the scheduling procedure was not fully implemented due to inadequate software. The second expert component, the product routing procedure, was untroubled by such difficulties, though it was unusable on its own; thus a second system was developed. This system, MICRO-X10, duplicated the function of X10, a complex database query routine used daily by Order Allocation. A prototype version of MICRO-X10 proved too slow to be useful but allowed implementation and maintenance issues to be analysed. In conclusion, the usefulness of the problem-driven approach to expert systems development within production planning and control is demonstrated but restrictions imposed by current expert system software are highlighted in that the abilities of such software to cope with `hard' scheduling constructs and also the slow processing speeds of such software can restrict the current usefulness of expert systems within production planning and control.