884 resultados para city centre development, overcrowding, project management, site management, space
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
This paper has developed a model of a single forest owner operating with perfect foresight in a dynamic open-city environment that allows for switching between alternative competing land uses (forest and urban use) at some point in the future. The model also incorporates external values of an even-aged standing forest in addition to the value of timber when it is harvested. Timber is exploited based on a multiple rotation model a la Faustmann with clear-cut harvesting. In contrast to previous models, our alternative land use to forest land is endogenous. Within this framework, we study the problem of the private owner as well as that of the social planner, when choosing the time to harvest, the time to convert land and the intensity of development. We also examine the extent to which the two-way linkage between urban development and forest management practices (timber production and provision of forest amenities) contributes to economic efficiency and improvements in non-market forest benefits. Finally, we consider policy options available to a regulator seeking to achieve improvements in efficiency including anti-sprawl policies (impact fees and density controls) and forest policies such a yield tax. Numerical simulations illustrate our analytical results.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
El projecte OnTheBus pretén ser un sistema de guiatge gratuït, destinat per a la plataforma mòbil Android, útil com a eina d’ajuda pel desplaçament d’un punt d’origen a un punt de destí dins de la ciutat, utilitzant la xarxa de transport metropolità. Aquesta memòria s’enllaça amb 6 memòries més, dels meus companys amb els qui he realitzat el projecte OnTheBus. L’objectiu d’aquesta memòria és explicar la gestió del projecte que s’ha realitzat, consisteix en constatar quina metodologia de desenvolupament s’ha seguit, com s’ha dividit i organitzat la feina i els grups de treball. Així com el mòdul de navegació o guiatge que s’ha desenvolupat.
Resumo:
Aquest projecte de Gestió d'un centre de formació, és el resultat d'un estudi per solucionar les necessitats del negoci. L'àrea de treball en què s'ha desenvolupat el projecte és l'entorn de la plataforma .NET de Microsoft.
Resumo:
El presente TFC tiene dos objetivos principales: 1. Determinar el grado de adaptación de las metodologías ágiles al desarrollo de proyectos web puesta en contexto con la adaptación de las metodologías clásicas a este mismo entorno. 2. Realizar una clasificación de las metodologías de desarrollo de software según el grado de adaptación a los proyectos web.
Resumo:
The purpose of this article is to analyze how professionals who decided to risk intramobility in their careers and who were hired by organizations from the industrial complex of Camaçari (Bahia) perceive the development of people management strategies that target intranational interculturality within these organizations. To achieve this, besides a review and theoretical analysis of the concepts of mobility, intercultural management and people management in organizations, 13 professionals were interviewed who had moved from different Brazilian states to work in companies in this particular complex. The results indicate that generally organizations ignore intercultural aspects, which is reflected in a gap in people management strategies. One indication of this refers to the lack of initial support, which generates problems for the individuals who arrive with great expectations in their new workplace. Furthermore, there is evidence that the financial help provided is insufficient and it becomes necessary to pay attention also to subjective aspects that involve relocation and the consequent international interculturality. Finally, it is believed that expansion of the focus of studies on intercultural management, with a look at intranational aspects, makes it possible to learn theoretical and practical lessons because of the experiences of the players who underwent the process, since intercultural management and people management can generate comparative advantages for organizations.
Resumo:
OBJECTIVETo present the nurse's integration within materials management of six teaching hospitals of Paraná - Brazil, and to describe the activities performed by nurses within this process.METHODA study of a qualitative approach and descriptive nature, conducted in teaching hospitals in Paraná, between June and August of 2013. The data collection was conducted through semi-structured interviews with eight nurses who worked in materials management; data were analyzed using content analysis.RESULTSThese showed that nurses perform ten categories of activities, distributed into four of the five steps of the materials management process.CONCLUSIONThe nurse, in performing of these activities, in addition to favoring the development of participative management, contributes to the organization, planning, and the standardization of the hospital supply process, giving greater credibility to the work with professionals who use the materials, and to the suppliers.
Resumo:
RESUME Dès le printemps 2004, la construction d'une 2ème ligne de métro est entreprise dans la ville de Lausanne en Suisse. En reliant Ouchy, au bord du lac Léman (alt. 373 m) à Epalinges (alt. 711 m), le nouveau métro "M2" traversera dès 2008 l'agglomération lausannoise du Sud au Nord sur une distance de 6 km. Depuis l'avant-projet, en 1999, une grande quantité de données géologiques a été récolté et de nombreux forages exécutés sur le site. Ceci nous a donné une occasion unique d'entreprendre une étude de microgravimétrique urbaine de détail. Le mode de creusement du tunnel dépend fortement des matériaux à excaver et il est classiquement du domaine du géologue, avec ses connaissances de la géologie régionale et de la stratigraphie des forages, de fournir à l'ingénieur un modèle géologique. Ce modèle indiquera dans ce cas l'épaisseur des terrains meubles qui recouvrent le soubassement rocheux. La représentativité spatiale d'une information très localisée, comme celle d'un forage, est d'autant plus compliquée que le détail recherché est petit. C'est à ce moment là que la prospection géophysique, plus spécialement gravimétrique, peut apporter des informations complémentaires déterminantes pour régionaliser les données ponctuelles des forages. La microgravimétrie en milieu urbain implique de corriger avec soin les perturbations gravifiques sur la mesure de la pesanteur dues aux effets de la topographie, des bâtiments et des caves afin d'isoler l'effet gravifique dû exclusivement à l'épaisseur du remplissage des terrains meubles. Tenant compte de l'intensité des corrections topographiques en milieu urbain, nous avons donné une grande importance aux sous-sols, leurs effets gravifiques pouvant atteindre l'ordre du dixième de mGal. Nous avons donc intégré ces corrections celle de topographie et traité les effets des bâtiments de manière indépendante. Nous avons inclus dans le modèle numérique de terrain (MNT) la chaussée et les sous-sols afin de construire un modèle numérique de terrain urbain. Nous utiliserons un nouvel acronyme « MNTU »pour décrire ce modèle. Nous proposons d'établir des cartes de corrections topographiques préalables, basées sur les données à disposition fournies par le cadastre en faisant des hypothèses sur la profondeur des sous-sols et la hauteur des bâtiments. Les deux zones de test choisies sont caractéristiques des différents types d'urbanisation présente à Lausanne et se révèlent par conséquent très intéressantes pour élaborer une méthodologie globale de la microgravimétrie urbaine. Le but était d'évaluer l'épaisseur du remplissage morainique sur un fond rocheux molassique se situant à une profondeur variable de quelques mètres à une trentaine de mètres et d'en établir une coupe dans l'axe du futur tracé du métro. Les résultats des modélisations se sont révélés très convaincants en détectant des zones qui diffèrent sensiblement du modèle géologique d'avant projet. Nous avons également démontré que l'application de cette méthode géophysique, non destructive, est à même de limiter le nombre de sondages mécaniques lors de l'avant-projet et du projet définitif, ce qui peut limiter à la fois les coûts et le dérangement engendré par ces travaux de surface. L'adaptabilité de la technique gravimétrique permet d'intervenir dans toutes les différentes phases d'un projet de génie civil comme celui de la construction d'un métro en souterrain. KURZFASSUNG Seit dem Frühling 2004 ist in der Stadt Lausanne (Schweiz) die neue U-Bahn "M2" in Konstruktion. Diese soll auf 6 km Länge die Lausanner Agglomeration von Süd nach Nord durchqueren. Die dem Projekt zu Grunde liegende technische Planung sieht vor, daß die Bahnlinie hauptsächlich in der Molasse angesiedelt sein wird. Seit dem Vorentwurf (1999) ist eine große Anzahl geologischer Angaben gesammelt worden. Daraus ergab sich die einmalige Gelegenheit, die Informationen aus den damit verbundenen zahlreichen Bohrungen zu einer detaillierten mikrogravimetrischen Studie der Stadt Lausanne zu erweitern und zu vervollständigen. Das Ziel bestand darin, die Mächtigkeit der die Molasseüberdeckenden Moräneablagerung abzuschätzen, um eine entsprechendes geologisches Profile entlang der künftigen Bahnlinie zu erstellen. Weiterhin sollte gezeigt werden, daß die Anwendung dieser nicht-invasiven geophysikalischen Methode es ermöglicht, die Anzahl der benötigten Bohrungen sowohl in der Pilotphase wie auch im endgültigen Projekt zu reduzieren, was zu wesentlichen finanziellen Einsparungen in der Ausführung des Werkes beitragen würde. Die beiden in dieser Studie bearbeiteten Testzonen befinden sich im Nordteil und im Stadtzentrum von Lausanne und sind durch eine unterschiedliche Urbanisierung charakterisiert. Das anstehende Gestein liegt in verschiedenen Tiefen: von einigen Metern bis zu etwa dreißig Metern. Diese Zonen weisen alle Schwierigkeiten einer urbanen Bebauung mit hoher Verkehrsdichte auf und waren daher massgebend bei der Ausarbeitung einer globalen mikrogravimetrischen Methodologie für die Stadt Lausanne. Die so entwickelte Technik ermöglicht, die störenden Auswirkungen der Topographie, der Gebäude, der Keller und der Öffentlichen Infrastrukturen sorgfältig zu korrigieren, um so die ausschließlich auf die Mächtigkeit des Lockergesteins zurückzuführenden Effekte zu isolieren. In Bezug auf die Intensität der Auswirkungen der topographischen Korrekturen im Stadtgebiet wurde den Untergeschossen eine besonders grosse Bedeutung zugemessen da die entsprechenden Schwerkrafteffekte eine Grösse von rund einem Zehntel mGal erreichen können. Wir schlagen deshalb vor, vorläufige Karten der topographischen Korrekturen zu erstellen. Diese Korrekturen basieren auf den uns vom Katasterplan gelieferten Daten und einigen Hypothesen bezüglich der Tiefe der Untergeschosse und der Höhe der Gebäude. Die Verfügbarkeit einer derartigen Karte vor der eigentlichen gravimetrischen Messkampagne würde uns erlauben, die Position der Meßstationen besser zu wählen. Wir sahen zudem, daß ein entsprechenden a priori Filter benutzt werden kann, wenn die Form und die Intensität der Anomalie offensichtlich dem entsprechenden Gebäude zugeordnet werden können. Diese Strategie muß jedoch mit Vorsicht angewandt werden, denn falls weitere Anomalien dazukommen, können bedeutende Verschiebungen durch Übèrlagerungen der Schwerewirkung verschiedener Strukturen entstehen. Die Ergebnisse der Modellierung haben sich als sehr überzeugend erwiesen, da sie im Voraus unbekannte sensible Zonen korrekt identifiziert haben. Die Anwendbarkeit der in dieser Arbeit entwickelten gravimetrischen Technik ermöglicht es, während allen Phasen eines Grossbauprojekts, wie zum Beispiel bei der Konstruktion einer unterirdischen U-Bahn, einzugreifen. ABSTRACT Since Spring of 2004 a new metro line has been under construction in the city of Lausanne in Switzerland. The new line, the M2, will be 6 km long and will traverse the city from south to north. The civil engineering project determined that the line would be located primarily in the Molasse. Since the preparatory project in 1999, a great quantity of geological data has been collected, and the many drillings made on the site have proved to be a unique opportunity to undertake a study of urban microgravimetry. The goal was to evaluate the thickness of the morainic filling over the molassic bedrock, and to establish a section along the axis of the future line. It then had to be shown that the application of this nondestructive geophysical method could reduce the number of mechanical surveys required both for a preparatory and a definitive project, which would lead to real savings in the realization of a civil engineering project. The two test zones chosen, one in the northern part of the city and one in the city centre, are characterised by various types of urbanisation. Bedrock is at a depth varying from a few metres to about thirty metres. These zones well exemplify the various difficulties encountered in an urban environment and are therefore very interesting for the development of an overall methodology of urban microgravimetry. Microgravimetry in an urban environment requires careful corrections for gravific disturbances due to the effects of topography, buildings, cellars, and the infrastructure of distribution networks, in order to isolate the gravific effect due exclusively to the thickness of loose soil filling. Bearing in mind the intensity of the topographic corrections in an urban environment, we gave particular importance to basements. Their gravific effects can reach the order of one tenth of one meal, and can influence above all the precision of the Bouguer anomaly. We propose to establish preliminary topographic correction charts based on data provided to us by the land register, by making assumptions on the depths of basements and the heights of buildings. Availability of this chart previous to a gravimetry campaign would enable us to choose optimum measuring sites. We have also seen that an a priori filter can be used when the form and the intensity of the anomaly correspond visually to the corresponding building. This strategy must be used with caution because if other anomalies are to be associated, important shifts can be generated by the superposition of the effects of different structures. The results of the model have proved to be very convincing in detecting previously unknown sensitive zones. The adaptability of the gravimetry technique allows for application in all phases of a civil engineering project such as the construction of an underground metro line. RIASSUNTO Dalla primavera 2004 una nuova linea metropolitana é in costruzione nella città di Losanna in Svizzera. La nuova metropolitana "M2" traverserà per la lunghezza di 6 km il centro urbano di Losanna da sud a nord. II progetto d'ingegneria civile prevedeva un tracciato situato essenzialmente nel fondo roccioso arenaceo terziario (molassa). Dalla redazione del progetto preliminare, avvenuta nel 1999, una grande quantità di dati geologici sono stati raccolti e sono stati eseguiti numerosi sondaggi. Questo sì é presentato come un'occasione unica per mettere a punto uno studio microgravimetrico in ambiente urbano con lo scopo di valutare lo spessore dei terreni sciolti di origine glaciale che ricoprono il fondo roccioso di molassa e di mettere in evidenza come l'applicazione di questo metodo geofisico non distruttivo possa limitare il numero di sondaggi meccanici nella fase di progetto preliminare ed esecutivo con conseguente reale risparmio economico nella realizzazione di una tale opera. Le due zone di test sono situate una nella zona nord e la seconda nel centro storico di Losanna e sono caratterizzate da stili architettonici differenti. II fondo roccioso é situato ad una profondità variabile da qualche metro ad una trentina. Queste due zone sembrano ben rappresentare tutte le difficoltà di un ambiente urbano e ben si prestano per elaborare una metodologia globale per la microgravimetria in ambiente urbano. L'applicazione di questa tecnica nell'ambiente suddetto implica la correzione attenta delle perturbazioni sulla misura dell'accelerazione gravitazionale, causate dalla topografia, gli edifici, le cantine e le infrastrutture dei sottoservizi, per ben isolare il segnale esclusivamente causato dallo spessore dei terreni sciolti. Tenuto conto, dell'intensità delle correzioni topografiche, abbiamo dato grande importanza alle cantine, poiché il loro effetto sulle misure può raggiungere il decimo di mGal. Proponiamo quindi di redigere una carta delle correzioni topografiche preliminare all'acquisizione, facendo delle ipotesi sulla profondità delle cantine e sull'altezza degli edifici, sulla base delle planimetrie catastali. L'analisi di questa carta permetterà di scegliere le posizioni più adatte per le stazioni gravimetriche. Abbiamo anche osservato che un filtro a priori, qualora la forma e l'intensità dell'anomalia fosse facilmente riconducibile in maniera visuale ad un edificio, possa essere efficace. Tuttavia questa strategia deve essere utilizzata con precauzione, poiché può introdurre uno scarto, qualora più anomalie, dovute a differenti strutture, si sovrappongano. I risultati delle modellizzazioni si sono rivelati convincenti, evidenziando zone sensibili non conosciute preventivamente. L'adattabilità della tecnica gravimetrica ha mostrato di poter intervenire in differenti fasi di un progetto di ingegneria civile, quale è quella di un'opera in sotterraneo.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
Under the circumstances of the increasing market pressure, enterprises try to improve their competitive position by development efforts, and a business development project is one tool for that. There are not many answers to the question of how the development projects launched to improve the business performance in SMEs have succeeded. Theacademic interest in the business development project success has mainly focused on projects implemented in larger organisations rather than in SMEs. The previous studies on the business success of SMEs have mainly focused on new business ventures rather than on existing SMEs. However, nowadays a large number of business development projects are undertaken in existing SMEs, where they can pose a great challenge. This study focuses on business development success in SMEs thathave already established their business. The objective of the present study is to gain a deep understanding on business development project success in the SME-context and to identify the dimensions and factors affecting the project success. Further, the aim is to clarify how the business development projects implemented in SMEs have affected their performance. The empirical evidence is based on multiple case study. This study builds a framework for a generic theory of business development success in the SME-context, based on literature from the areas ofproject and change management, entrepreneurship and small business management, as well as performance measurement, and on empirical evidence from SMES. The framework consists of five success dimensions: entrepreneurial, project preparation, change management, project management and project success. The framework provides a systematic way for analysing the business development project and its impact on the performance and on the performing company. This case evidence indicates that successful business development projects have a balanced, high performance concerning all the dimensions. Good performance in one dimension is not enoughfor the project success, but it gives a good ground for the other dimensions. The other way round, poor performance in one success dimension affects the others, leading to poor performance of the project. In the SME-context the business development project success seems to be dependent on several interrelated dimensions and factors. Success in one area leads to success in other areas, and so creates an upward success spiral. Failure in one area seems to lead to failure in other areas, creating a downward failure spiral. The study indicates that the internal business development projects have affected the SMEs' performance widely also on areas and functions not initially targeted. The implications cover all thesuccess categories: the project efficiency, the impact on the customer, the business success and the future potentiality. With successful cases, the success tends to spread out to areas and functions not mentioned as the project goals, andwith unsuccessful cases the failure seems to spread out widely to the SMEs' other functions. This study also indicates that the most important key factors for successful business development project implementation are the strength of intention, business ability, knowledge, motivation and participation of the employees, as well as adequate and well-timed training provided to the employees.
Resumo:
Työssä käsitellään Helsingin Energian sähköasemaprojektoinnin kehittämistä. Helsingin kaupunkiolosuhteissa valmiiden ratkaisujen hyödyntäminen ei ole usein mahdollista, vaan asemat on suunniteltava itsenäisinä, erilaisina projekteina. Rakennettavat sähköasemat ovat suuria ja eri osien kilpailuttamisella saavutetaan taloudellista hyötyä. HelenEngineeringillä on mahdollisuus toimia haastavissa projekteissa konsulttimaisena projektinhoitajana. Kun sähköasemaprojektien tarve on jatkuva, Helsingin Energialla on syytä säilyttää oma sähköasemaprojektointiosaaminen. Työtä varten tehtiin haastattelututkimus sähköasemaprojekteja toteuttaville yrityksille ja perehdyttiin kahteen viimeisimpään Helsingin Energialla toteutettuun sähköasemaprojektiin, jotka olivat Viikinmäen 20 kV ja Suvilahden110 kV sähköasemien uusimiset. Näiden perusteella muodostettiin malli toteuttaasähköasemaprojekteja Helsingin Energialla. Malli sisältää muun muassa rungon projektivaiheistukselle, ositukselle, organisaatiokaaviolle, aikataululle ja näkökulmia sopimusten laadintaan. Mallin täysimittainen soveltaminen vaatii kuitenkinjatkuvaa, suunniteltua kehitystyötä. Myös mallia on kehitettävä jatkuvasti.