882 resultados para SCHEDULING
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
Peer-reviewed
Resumo:
This article presents an optimization methodology of batch production processes assembled by shared resources which rely on a mapping of state-events into time-events allowing in this way the straightforward use of a well consolidated scheduling policies developed for manufacturing systems. A technique to generate the timed Petri net representation from a continuous dynamic representation (Differential-Algebraic Equations systems (DAEs)) of the production system is presented together with the main characteristics of a Petri nets-based tool implemented for optimization purposes. This paper describes also how the implemented tool generates the coverability tree and how it can be pruned by a general purpose heuristic. An example of a distillation process with two shared batch resources is used to illustrate the optimization methodology proposed.
Resumo:
Abstract
Resumo:
Tutkimuksen päätavoite on arvioida, ovatko neljä ohjelmistovaihtoehtoa riittäviä tuotannon aikataulutuksen työkaluja ja mikä työkaluista sopii toimeksiantajayritykselle. Alatavoitteena on kuvata tuotannon aikataulutuksen nyky- ja tahtotila prosessimallinnuksen avulla, selvittää työkalun käyttäjätarpeet ja määritellä priorisoidut valintakriteerit työkalulle.Tutkimuksen teoriaosuudessa tutkitaan tuotannon aikataulutuksen logiikkaa ja haasteita. Työssä tarkastellaan aikataulutusohjelmiston valintaa rinnakkain prosessinmallinnuksen kanssa. Aikataulutusohjelmistovaihtoehdot ja metodit käyttäjätarpeiden selvittämiseksi käydään läpi. Empiriaosuudessa selvitetään tutkimuksen suhde toimeksiantajayrityksen strategiaan. Käyttäjätarpeet selvitetään haastattelujen avulla jaanalysoidaan QFD matriisin avulla. Toimeksiantajayrityksen tuotannon aikataulutuksen nyky- ja tahtotilaprosessit mallinnetaan, jotta ohjelmistojen sopivuutta, aikataulutusprosessia tukevana työkaluna voidaan arvioida.Tutkimustuloksena ovatpriorisoidut valintakriteerit aikataulutustyökalulle eli käyttäjätarpeista johdetut tärkeimmät toiminnalliset ominaisuudet, järjestelmätoimittaja-arvio sekä suositukset jatkotoimenpiteistä ja lisätutkimuksesta.
Resumo:
The object of this project is to schedule a ctitious European basketball competition with many teams situated a long distances. The schedule must be fair, feasible and economical, which means that the total distance trav- eled by every team must be the minimal possible. First, we de ne the sport competition terminology and study di erent competition systems, focusing on the NBA and the Euroleague systems. Then we de ne concepts of graph theory and spherical distance that will be needed. Next we propose a com- petition system, explaining where will be allocated the teams and how will be the scheduling. Then there is a description of the programs that have been implemented, and, nally, the complete schedule is displayed, and some possible improvements are mentioned.
Resumo:
In order to establish guidelines for irrigation water management of banana cv. Pacovan (AAB group, Prata sub-group) in Petrolina County, northeastern Brazil, the root distribution and activity were measured on an irrigated plantation, in a medium texture soil, with plants spaced in a 3 x 3 m grid. Root distribution was evaluated by the soil profile method aided by digital image analysis, while root activity was indirectly determined by the changing of soil water content and by the direction of soil water flux. Data were collected since planting in January 1999 to the 3rd harvest in September 2001. Effective rooting depth increased from 0.4 m at 91 days after planting (dap), to 0.6 m at 370, 510, and 903 dap, while water absorption by roots was predominantly in the top 0,6 m.
Resumo:
The water consumption and the crop coefficient of the banana cv. Pacovan were estimated in Petrolina County, northeastern Brazil, in order to establish guidelines to irrigation water management. Evaluations were carried out since planting in January 1999 to the 3rd harvest in September 2001 on a microsprinkler irrigated orchard, with plants spaced in a 3 x 3 m grid. Average daily water consumption was 3.9, 4.0, and 3.3 mm in the 1st, 2nd and 3rd growing seasons, respectively. Crop coefficient values increased from 0.7 (vegetative growth) to 1.1 (flowering). Even with high soil water availability, transpiration was reduced due to high evaporative demand.
Resumo:
In this work, we present an integral scheduling system for non-dedicated clusters, termed CISNE-P, which ensures the performance required by the local applications, while simultaneously allocating cluster resources to parallel jobs. Our approach solves the problem efficiently by using a social contract technique. This kind of technique is based on reserving computational resources, preserving a predetermined response time to local users. CISNE-P is a middleware which includes both a previously developed space-sharing job scheduler and a dynamic coscheduling system, a time sharing scheduling component. The experimentation performed in a Linux cluster shows that these two scheduler components are complementary and a good coordination improves global performance significantly. We also compare two different CISNE-P implementations: one developed inside the kernel, and the other entirely implemented in the user space.
Resumo:
In modem hitec industry Advanced Planning and Scheduling (APS) systems provide the basis for e-business solutions towards the suppliers and the customers. One objective of this thesis was to clarify the modem supply chain management with the APS systems and especially concentrate on the area of Collaborative Planning. In order Advanced Planning and Scheduling systems to be complete and usable, user interfaces are needed. Current Visual Basic user interfaces have faced many complaints and arguments from the users as well as from the development team. This thesis is trying to analyze the reasons and causes for the encountered problems and also provide ways to overcome them. The decision has been made to build the new user interfaces to be Web-enabled. Therefore another objective of this thesis was to research and find suitable technologies for building the Web-based user interfaces for Advanced Planning and Scheduling Systems in Nokia Demand/Supply Planning business area. Comparison between the most suitable technologies is made. Usability issues of Web-enabled user interfaces are also covered. The empirical part of the thesis includes design and implementation of a Web-based user interface with the chosen technology for a particular APS module that enables Collaborative Planning with suppliers.
Researching Manufacturing Planning and Control system and Master Scheduling in a manufacturing firm.
Resumo:
The objective of this thesis is to research Manufacturing Planning and Control (MPC) system and Master Scheduling (MS) in a manufacturing firm. The study is conducted at Ensto Finland Corporation, which operates on a field of electrical systems and supplies. The paper consists of theoretical and empirical parts. The empirical part is based on weekly operating at Ensto and includes inter-firm material analysis, learning and meetings. Master Scheduling is an important module of an MPC system, since it is beneficial on transforming strategic production plans based on demand forecasting into operational schedules. Furthermore, capacity planning tools can remarkably contribute to production planning: by Rough-Cut Capacity Planning (RCCP) tool, a MS plan can be critically analyzed in terms of available key resources in real manufacturing environment. Currently, there are remarkable inefficiencies when it comes to Ensto’s practices: the system is not able to take into consideration seasonal demand and react on market changes on time; This can cause significant lost sales. However, these inefficiencies could be eliminated through the appropriate utilization of MS and RCCP tools. To utilize MS and RCCP tools in Ensto’s production environment, further testing in real production environment is required. Moreover, data accuracy, appropriate commitment to adapting and learning the new tools, and continuous developing of functions closely related to MS, such as sales forecasting, need to be ensured.
Resumo:
The objective of this study was to verify the potential of SNAP III (Scheduling and Network Analysis Program) as a support tool for harvesting and wood transport planning in Brazil harvesting subsystem definition and establishment of a compatible route were assessed. Initially, machine operational and production costs were determined in seven subsystems for the study area, and quality indexes, construction and maintenance costs of forest roads were obtained and used as SNAP III program input data. The results showed, that three categories of forest road occurrence were observed in the study area: main, secondary and tertiary which, based on quality index, allowed a medium vehicle speed of about 41, 30 and 24 km/hours and a construction cost of about US$ 5,084.30, US$ 2,275.28 and US$ 1,650.00/km, respectively. The SNAP III program used as a support tool for the planning, was found to have a high potential tool in the harvesting and wood transport planning. The program was capable of defining efficiently, the harvesting subsystem on technical and economical basis, the best wood transport route and the forest road to be used in each period of the horizon planning.
Resumo:
This work contains a series of studies on the optimization of three real-world scheduling problems, school timetabling, sports scheduling and staff scheduling. These challenging problems are solved to customer satisfaction using the proposed PEAST algorithm. The customer satisfaction refers to the fact that implementations of the algorithm are in industry use. The PEAST algorithm is a product of long-term research and development. The first version of it was introduced in 1998. This thesis is a result of a five-year development of the algorithm. One of the most valuable characteristics of the algorithm has proven to be the ability to solve a wide range of scheduling problems. It is likely that it can be tuned to tackle also a range of other combinatorial problems. The algorithm uses features from numerous different metaheuristics which is the main reason for its success. In addition, the implementation of the algorithm is fast enough for real-world use.
Resumo:
The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented.
Resumo:
Formal methods provide a means of reasoning about computer programs in order to prove correctness criteria. One subtype of formal methods is based on the weakest precondition predicate transformer semantics and uses guarded commands as the basic modelling construct. Examples of such formalisms are Action Systems and Event-B. Guarded commands can intuitively be understood as actions that may be triggered when an associated guard condition holds. Guarded commands whose guards hold are nondeterministically chosen for execution, but no further control flow is present by default. Such a modelling approach is convenient for proving correctness, and the Refinement Calculus allows for a stepwise development method. It also has a parallel interpretation facilitating development of concurrent software, and it is suitable for describing event-driven scenarios. However, for many application areas, the execution paradigm traditionally used comprises more explicit control flow, which constitutes an obstacle for using the above mentioned formal methods. In this thesis, we study how guarded command based modelling approaches can be conveniently and efficiently scheduled in different scenarios. We first focus on the modelling of trust for transactions in a social networking setting. Due to the event-based nature of the scenario, the use of guarded commands turns out to be relatively straightforward. We continue by studying modelling of concurrent software, with particular focus on compute-intensive scenarios. We go from theoretical considerations to the feasibility of implementation by evaluating the performance and scalability of executing a case study model in parallel using automatic scheduling performed by a dedicated scheduler. Finally, we propose a more explicit and non-centralised approach in which the flow of each task is controlled by a schedule of its own. The schedules are expressed in a dedicated scheduling language, and patterns assist the developer in proving correctness of the scheduled model with respect to the original one.