997 resultados para ABC Open
Resumo:
This paper will report on the “wicked” problems encountered when designing an online course with bounded content in an unbounded learning environment. It will describe the dilemmas faced and decisions made by academics in an Australian university challenged by an institutional initiative to design radical, disruptive learning experiences making use of readily available online media. This bounded/unbounded environment demands new roles for instructors in adopting innovative pedagogies and teaching and learning strategies. It also creates changing and challenging roles for course designers as they deal with ill-defined parameters and unknown audiences. In this paper, we propose a novel methodology for making curricular decisions in ill-defined spaces.
Resumo:
This thesis investigates how Open Government Data (OGD) concepts and practices might be implemented in the State of Qatar to achieve more transparent, effective and accountable government. The thesis concludes with recommendations as to how Qatar, as a developing country, might enhance the accessibility and usability of its OGD and implement successful and sustainable OGD systems and practices.
Resumo:
Podiatry is the medical science of the bones, muscle and skin of the foot. Paul Bennett is sometimes called on by police to help solve crime. He can provide vital evidence by applying his medical expertise and extraordinary talent for pattern recognition to footprints left at crime-scenes. Paul is a senior lecturer at the Quensland University of Technology's School of Clinical Sciences.
Resumo:
Media architecture’s combination of the digital and the physical can trigger, enhance, and amplify urban experiences. In this paper, we examine how to bring about and foster more open and participatory approaches to engage communities through media architecture by identifying novel ways to put some of the creative process into the hands of laypeople. We review technical, spatial, and social aspects of DIY phenomena with a view to better understand maker cultures, communities, and practices. We synthesise our findings and ask if and how media architects as a community of practice can encourage the ‘open-sourcing’ of information and tools allowing laypeople to not only participate but become active instigators of change in their own right. We argue that enabling true DIY practices in media architecture may increase citizen control. Seeking design strategies that foster DIY approaches, we propose five areas for further work and investigation. The paper begs many questions indicating ample room for further research into DIY Media Architecture.
Resumo:
Did SBS chief executive Michael Ebeid score a well-timed free kick or an own goal in his attack on the ABC this week? The ABC recently secured the free-to-air television rights for the Asian Cup football tournament to be held in Australia early next year, together with tonight’s match between the Socceroos and Japan. A lower bid by SBS – still in some circles fondly known as the “Soccer Broadcasting Service” – was rejected, dealing a significant blow to the smaller public broadcaster. The ABC was reportedly asked to make a bid by Football Federation Australia. The FFA presumably believes the ABC’s coverage will attract larger audiences to the game. This is despite SBS’s long-term success with the sport. It should not be forgotten, however, that while SBS has largely been defined by its long connection with the world game, ABC was the home of football from the late 1950s until the 1980s. But the stoush is only partly about football. It was surely no coincidence that it comes on the eve of the government’s formal announcement of the size of the cuts to public broadcasting...
Resumo:
Unified Communication (UC) is the integration of two or more real time communication systems into one platform. Integrating core communication systems into one overall enterprise level system delivers more than just cost saving. These real-time interactive communication services and applications over Internet Protocol (IP) have become critical in boosting employee accessibility and efficiency, improving customer support and fostering business agility. However, some small and medium-sized businesses (SMBs) are far from implementing this solution due to the high cost of initial deployment and ongoing support. In this paper, we will discuss and demonstrate an open source UC solution, viz. “Asterisk” for use by SMBs, and report on some performance tests using SIPp. The contribution from this research is the provision of technical advice to SMBs in deploying UC, which is manageable in terms of cost, ease of deployment and support.
Resumo:
Critical stage in open-pit mining is to determine the optimal extraction sequence of blocks, which has significant impacts on mining profitability. In this paper, a more comprehensive block sequencing optimisation model is developed for the open-pit mines. In the model, material characteristics of blocks, grade control, excavator and block sequencing are investigated and integrated to maximise the short-term benefit of mining. Several case studies are modeled and solved by CPLEX MIP and CP engines. Numerical investigations are presented to illustrate and validate the proposed methodology.
Resumo:
A novel solution-processable non-fullerene electron acceptor 6,6′-(5,5′-(9,9-dioctyl-9H-fluorene-2,7-diyl)bis(thiophene-5,2-diyl))bis(2,5-bis(2-ethylhexyl)-3-(thiophen-2-yl)pyrrolo[3,4-c]pyrrole-1,4(2H,5H)-dione) (DPP1) based on fluorene and diketopyrrolopyrrole conjugated moieties was designed, synthesized and fully characterized. DPP1 exhibited excellent solubility and high thermal stability which are essential for easy processing. Upon using DPP1 as an acceptor with the classical electron donor poly(3-hexylthiophene), solution processable bulk-heterojunction solar cells afforded a power conversion efficiency of 1.2% with a high open-circuit voltage (1.1 V). As per our knowledge, this value of open circuit voltage is one of the highest values reported so far for a bulk-heterojunction device using DPP1 as a non-fullerene acceptor.
Resumo:
World Heritage Landscapes (WHLs) are receiving increased attention from researchers, urban planners, managers, and policy makers and many heritage values and resources are becoming irreversibly lost. This phenomenon is especially prominent for WHLs located in cities, where greater development opportunities are involved. Decision making for sustainable urban landscape planning, conservation and management of WHLs often takes place from an economic perspective, especially in developing countries. This, together with the uncertain source of funding to cover WHL operating and maintenance costs, has resulted in many urban managers seeking private sector funding either in the form of visitor access fees or leasing part of the site for high-rental facilities such as five star hotels, clubs and expensive restaurants. For the former, this can result in low-income urban citizens being unable to afford the access fees and hence contradicting the principle of equal access for all; while, for the latter, the principle of open access for all is equally violated. To resolve this conflict, a game model is developed to determine how urban managers should allocate WHL spaces to maximize the combination of economic, social and ecological benefits and cultural values. A case study is provided of the Hangzhou's West Lake Scenic Area, a WHL located at the centre of Hangzhou city, in which several high-rental facilities have recently been closed down by the local authorities due to charges of elitism and misuse of public funds by government officials. The result shows that the best solution is to lease a small space with high rents and leave the remainder of the site to the public. This solution is likely to be applicable only in cities with a strong economy.
Resumo:
In the Bayesian framework a standard approach to model criticism is to compare some function of the observed data to a reference predictive distribution. The result of the comparison can be summarized in the form of a p-value, and it's well known that computation of some kinds of Bayesian predictive p-values can be challenging. The use of regression adjustment approximate Bayesian computation (ABC) methods is explored for this task. Two problems are considered. The first is the calibration of posterior predictive p-values so that they are uniformly distributed under some reference distribution for the data. Computation is difficult because the calibration process requires repeated approximation of the posterior for different data sets under the reference distribution. The second problem considered is approximation of distributions of prior predictive p-values for the purpose of choosing weakly informative priors in the case where the model checking statistic is expensive to compute. Here the computation is difficult because of the need to repeatedly sample from a prior predictive distribution for different values of a prior hyperparameter. In both these problems we argue that high accuracy in the computations is not required, which makes fast approximations such as regression adjustment ABC very useful. We illustrate our methods with several samples.
Resumo:
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.
Resumo:
Aortic root replacement is a complex procedure, though subsequent modifications of the original Bentall procedure have made surgery more reproducible. The study aim was to examine the outcomes of a modified Bentall procedure, using the Medtronic Open PivotTM valved conduit. Whilst short-term data on the conduit and long-term data on the valve itself are available, little is known of the long-term results with the valved conduit. Patients undergoing aortic root replacement between February 1999 and February 2010, using the Medtronic Open Pivot valved conduit were identified from the prospectively collected Cardiothoracic Register at The Prince Charles Hospital, Brisbane, Australia. All patients were followed up echocardiographically and clinically. The primary end-point was death, and a Cox proportional model was used to identify factors associated.with survival. Secondary end-points were valve-related morbidity (as defined by STS guidelines) and postoperative morbidity. Predictors of morbidity were identified using logistic regression. A total of 246 patients (mean age 50 years) was included in the study. The overall mortality was 12%, with actuarial 10-year survival 79% and a 10-year estimate of valve-related death of 0.04 (95% CI: 0.004, 0.07). Preoperative myocardial infarction (p = 0.004, HR 4.74), urgency of operation (p = 0.038, HR 2.8) and 10% incremental decreases in ejection fraction (p = 0.046, HR 0.69) were predictive of mortality. Survival was also affected by the valve gradients, with a unit increase in peak gradient reducing mortality (p = 0.021, HR 0.93). Valve-related morbidity occurred in 11 patients. Urgent surgery (p <0.001, OR 4.12), aortic dissection (p = 0.015, OR 3.35), calcific aortic stenosis (p = 0.016, OR 2.35) and Marfan syndrome (p 0.009, OR 3.75) were predictive of postoperative morbidity. The reoperation rate was 1.2%. The Medtronic Open Pivot valved conduit is a safe and durable option for aortic root replacement, and is associated with low morbidity and 10-year survival of 79%. However, further studies are required to determine the effect of valve gradient on survival.