996 resultados para a joint procurement company
Resumo:
The provision of reserves in power systems is of great importance in what concerns keeping an adequate and acceptable level of security and reliability. This need for reserves and the way they are defined and dispatched gain increasing importance in the present and future context of smart grids and electricity markets due to their inherent competitive environment. This paper concerns a methodology proposed by the authors, which aims to jointly and optimally dispatch both generation and demand response resources to provide the amounts of reserve required for the system operation. Virtual Power Players are especially important for the aggregation of small size demand response and generation resources. The proposed methodology has been implemented in MASCEM, a multi agent system also developed at the authors’ research center for the simulation of electricity markets.
Resumo:
As redes de terras são algo que atormenta muitas operadoras de telecomunicações. Quando o comum civil pensa que apenas existem antenas e que é importante a transmissão de dados porque naturalmente não lhes faz falta saber mais nada, as pessoas envolventes na construção de uma estação de telecomunicações têm preocupações não só com a parte de rádio e antenas, mas fundamentalmente com a parte de energia e de infra-estruturas. No desenvolvimento deste projecto, torna-se então importante perceber como as redes de terras são implementadas, como atingir valores satisfatórios para as operadoras, como realizar melhoria da rede de terras já existentes, implementar furos artesianos/valas e sobretudo como melhorar no futuro. Os materiais utilizados e o estudo prévio das condições do terreno onde a estação rádio-base é implementada nem sempre coincidem com os resultados desejados e que pensamos que seriam facilmente atingidos após implementação da torre. Neste projecto, vamos então acompanhar todos os processos, desde a legalização, construção, testes e finalmente a medição da resistência de terras final. Se os valores foram aceitáveis, óptimo para a operadora de telecomunicações e para a empresa responsável pela implementação. Caso os resultados estejam aquém das expectativas, é altura de selecionar os melhores e recorrendo a um conjunto de técnicas que garantam resultados e o menos dispêndio de dinheiro possível, vamos avançar para as melhorias. Os regimes de protecção das pessoas e da estação são bastante importantes. É importante também perceber as condições dos solos e saber simular com o programa ERICO que será fundamental para se efetuar uma comparação entre o teórico e o implementado praticamente. No fim, parte fulcral serão as medições finais, a relação preço-qualidade das melhorias implementadas, a análise dos resultados com argumentos válidos e o bom senso da operadora para aceitar ou rejeitar os trabalhos. Contrato é contrato, fazer mais e melhor é uma exigência constante.
Resumo:
1.Pre-assessment data of the patient A 2-year-old boy, weighing 15 kg was admitted with a history of limited mouth opening(inter-incisor distance of 6 mm), hypoplastic and retrognathic mandible (bird face deformity) and facial asymmetry from left temporomandibular joint ankylosis (TMJA). He was born at term, after an uneventful pregnancy, and there was no report of trauma during caesarean section. No other possible aetiologies were identified. He was scheduled for mandibular osteotomy. Preoperative ENT examination revealed adenotonsillar hypertrophy. 2. Anaesthetic Plan A fiberoptic nasal intubation was performed under deep inhalation anaesthesia with sevoflurane, with the patient breathing spontaneously. Midazolam (0.05 mg.kg-1) and alfentanil (0.03 mg.kg-1) were given and anaesthesia was maintained with O2/air and sevoflurane. No neuromuscular blocking agent was administered since the surgical team needed facial nerve monitoring. 3. Description of incident During surgery an accidental extubation occurred and an attempt was made to reintubate the trachea by direct laryngoscopy. Although the osteotomy was nearly completed, the vocal cords could not be visualized (Cormack-Lehane grade IV laryngoscopic view). 4. Solving the problem Re-intubation was finally accomplished with the flexible fiberscope and the procedure was concluded without any more incidents. Extubation was performed 24 hours postoperatively with the patient fully awake. After surgery mouth opening improved to inter-incisor gap of 15 mm. 5. Lessons learned and take home message Two airways issues present in this case can lead to difficultventilation and intubation: TMJA and adenotonsillar hypertrophy. These difficulties were anticipated and managed accordingly. The accidental extubation brought to our attention the fact that, even after surgical correction, this airway remains challenging. Even with intensive jaw stretchingexercises there is a high incidence of re-ankylosis, especially in younger patients. One should bear that in mind when anaesthetizing patients with TMJA.
Resumo:
No Estádio do Dragão existem doze juntas de dilatação localizadas simetricamente, que separam o estádio em doze corpos independentes, com o objetivo de minimizar a fendilhação provocada pelas movimentações da estrutura resultantes da solicitação de ações diretas e, principalmente, indiretas nessa mesma estrutura. Neste relatório explicar-se-á a importância, causas e objetivos que levam à necessidade de utilização destas juntas de dilatação em geral nas edificações, e no caso particular do estádio referido. Este elemento estrutural é considerado pela empresa responsável pela manutenção do Estádio do Dragão como a causa de um dos principais problemas recorrentes no estádio que necessitam de uma exigente atenção. Esta consideração deve-se ao fato das intervenções nas juntas de dilatação terem um custo de manutenção bastante oneroso e também pelo frequente aparecimento de novas patologias associadas a este elemento, tais como infiltrações de água, que necessitam de uma reparação urgente. Portanto, no sentido de resolver estas patologias decorrentes do mau funcionamento dos sistemas de juntas existentes no Estádio do Dragão, foi proposto pela PortoEstádio a elaboração de procedimentos de um plano de manutenção das juntas de dilatação que permitisse planear as intervenções e mitigar o aparecimento dessas patologias, com o objetivo principal de minimizar os custos inerentes à manutenção das juntas de dilatação. Estes procedimentos solicitados e demais elementos complementares são apresentados no presente trabalho, com a classificação dos sistemas de juntas do Estádio do Dragão, identificação das principais patologias nos diversos sistemas de juntas, escolha de novos sistemas para substituição dos existentes no estádio e finalmente, a criação de uma calendarização de intervenções nas juntas para a implementação de um plano de manutenção preventiva neste elemento de grande importância estrutural.
Resumo:
Com o presente relatório pretende-se descrever o estágio curricular realizado na entidade Smarteurope – Funding Solution Company, Lda. entre Fevereiro e Dezembro de 2015, entidade que se dedica à prestação de serviços de consultoria e gestão. Este relatório está estruturado em 4 partes fundamentais: enquadramento teórico, apresentação, caracterização e descrição do contexto da organização; descrição das atividades realizadas; e por último a conclusão e reflexão sobre as competências adquiridas.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
NSBE - UNL