891 resultados para Complex Project Management


Relevância:

90.00% 90.00%

Publicador:

Resumo:

This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Studies of construction labour productivity have revealed that limited predictability and multi-agent social complexity make long-range planning of construction projects extremely inaccurate. Fire-fighting, a cultural feature of construction project management, social and structural diversity of involved permanent organizations, and structural temporality all contribute towards relational failures and frequent changes. The main purpose of this paper is therefore to demonstrate that appropriate construction planning may have a profound synergistic effect on structural integration of a project organization. Using the general systems theory perspective it is further a specific objective to investigate and evaluate organizational effects of changes in planning and potentials for achieving continuous project-organizational synergy. The newly developed methodology recognises that planning should also represent a continuous, improvement-leading driving force throughout a project. The synergistic effect of the process planning membership duality fostered project-wide integration, eliminated internal boundaries, and created a pool of constantly upgrading knowledge. It maintained a creative environment that resulted in a number of process-related improvements from all parts of the organization. As a result labour productivity has seen increases of more than 30%, profits have risen from an average of 12% to more than 18%, and project durations have been reduced by several days.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Industrial projects are often complex and burdened with time pressures and a lack of information. The term 'soft-project' used here stands for projects where the ‘what’ and/or the ‘how’ is uncertain, which is often the experience in projects involving software intensive systems developments. This thesis intertwines the disciplines of project management and requirements engineering in a goal-oriented application of the maxim ‘keep all objectives satisfied’. It thus proposes a method for appraising projects. In this method, a goal-oriented analysis establishes a framework with which expert judgements are collected so as to construct a confidence profile in regard to the feasibility and adequacy of the project's planned outputs. It is hoped that this appraisal method will contribute to the activities of project ‘shaping’ and aligning stakeholders’ expectations whilst helping project managers appreciate what parts of their project can be progressed and what parts should be held pending further analysis. This thesis offers the following original contribution: an appreciation of appraisal in the project context; a goal-oriented confidence profiling technique; and: a technique to produce goal-refinement diagrams – referred to as Goal Sketching. Collectively these amount to a method for the ‘Goal Refinement Appraisal of Soft-Projects’ (GRASP). The validity of the GRASP method is shown for two projects. In the first it is used for shaping a business investigation project. This is done in real-time in the project. The second case is a retrospective study of an enterprise IT project. This case tests the effectiveness of forecasting project difficulty from an initial confidence profile.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Relating system dynamics to the broad systems movement, the key notion is that reinforcing loops deserve no less attention than balancing loops. Three specific propositions follow. First, since reinforcing loops arise in surprising places, investigations of complex systems must consider their possible existence and potential impact. Second, because the strength of reinforcing loops can be misinferred - we include an example from the field of servomechanisms - computer simulation can be essential. Be it project management, corporate growth or inventory oscillation, simulation helps to assess consequences of reinforcing loops and options for interventions. Third, in social systems the consequences of reinforcing loops are not inevitable. Examples concerning globalization illustrate how difficult it might be to challenge such assumptions. However, system dynamics and ideas from contemporary social theory help to show that even the most complex social systems are, in principle, subject to human influence. In conclusion, by employing these ideas, by attending to reinforcing as well as balancing loops, system dynamics work can improve the understanding of social systems and illuminate our choices when attempting to steer them.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper proposes a framework to support Customer Relationship Management (CRM) implementation in nursing homes. The work extends research by Cheng et al. (2005) who conducted in-depth questionnaires to identify critical features (termed value-characteristics), which are areas identified as adding the most value if implemented. Although Cheng et al. did proposed an implementation framework, summary of, and inconsistent inclusion of value-characteristics, limits the practical use of this contribution during implementation. In this paper we adapt the original framework to correct perceived deficiencies. We link the value characteristics to operational, analytical, strategic and/or collaborative CRM solution types, to allow consideration in context of practical implementation solutions. The outcome of this paper shows that, practically, a 'one solution meets all characteristic' approach to CRM implementation within nursing homes is inappropriate. Our framework, however, supports implementers in identifying how value can be gained when implementing a specific CRM solution within nursing homes; which subsequently support project management and expectation management.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of the article is to describe and analyse Ghana’s AKOBEN programme which is the first environmental performance rating and public disclosure programme in Africa. Furthermore, by means of a SWOT analysis, the article assesses the suitability of AKOBEN as a veritable tool for promoting good environmental governance in Ghana specifically and Africa in general.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This article describes a new application of key psychological concepts in the area of Sociometry for the selection of workers within organizations in which projects are developed. The project manager can use a new procedure to determine which individuals should be chosen from a given pool of resources and how to combine them into one or several simultaneous groups/projects in order to assure the highest possible overall work efficiency from the standpoint of social interaction. The optimization process was carried out by means of matrix calculations performed using a computer or even manually, and based on a number of new ratios generated ad-hoc and composed on the basis of indices frequently used in Sociometry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Este trabalho tem por objetivo revelar o inter-relacionamento envolvendo os principais determinantes da capacidade de inovação. Até hoje inexistem estudos empíricos que apresentam um modelo abrangente sobre uma base de dados em larga escala mostrando as principais rotas para o desenvolvimento da capacidade de inovação. A partir de uma revisão abrangente e sistemática da literatura, construiu-se um modelo teórico integrando os principais fatores sugeridos em artigos teóricos e de revisão. Desenvolveu-se uma escala de medição confiável e testou-se o modelo empiricamente em uma amostra de 243 firmas brasileiras de vários ramos empresariais. Os métodos utilizados incluem a análise fatorial confirmatória, equações estruturais e a análise multigrupo da invariância estrutural. Os resultados evidenciaram o efeito direto do conhecimento do cliente e do mercado, assim como da gestão estratégica da tecnologia sobre o desempenho em inovação. Ambos os fatores são afetados pela intenção estratégica de inovar e pela liderança transformadora, por meio da gestão de pessoas para inovação. A organicidade da estrutura organizacional e a gestão de projetos têm efeito moderador positivo sobre a relação entre a gestão estratégica da tecnologia e o desempenho em inovação. Esse efeito moderador, entretanto, não se revelou na relação entre o conhecimento do cliente e do mercado e o desempenho em inovação, o que foi explicado post-hoc. O valor deste estudo está na apresentação de uma escala de medição confiável e de um modelo teórico validado empiricamente que integra várias correntes de estudo e explicita como a ação da liderança pode estruturar e alavancar os recursos gerenciais para gerar e manter a capacidade da organização de inovar. Tal modelo se constitui em um road-map que pode ajudar os gerentes a desenvolver estratégias e práticas capazes de alavancar o desempenho em inovação.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

O Governo brasileiro criou a partir de 2007 o PAC – Programa de Aceleração do Crescimento, um conjunto de projetos de infraestrutura no qual o DNIT ocupa posição de destaque com volume de recursos superior a R$ 58 bilhões. Desde o início do Programa o principal obstáculo é a insuficiência de projetos de qualidade. Projetos de engenharia são etapa crucial para o lançamento de licitações para obras de infraestrutura. Este gargalo de projeto, associado ao processo licitatório, é chamado de “fator projeto”. Em 2011 foi instituído o RDC – Regime Diferenciado de Contratações com o objetivo de remover estes entraves. Este trabalho surge da necessidade da Secretaria do Programa de Aceleração do Crescimento, vinculada ao Ministério do Planejamento, e do Departamento Nacional de Infraestrutura de Transportes, vinculado ao Ministério dos Transportes, de entender os desafios impostos pelo “fator projeto” na execução dos projetos relacionados às obras rodoviárias no âmbito do PAC. Para tanto, foram analisados os aspectos de contratação pela Administração Pública, enfatizando as mudanças ocorridas no processo licitatório corridas depois da vigência do Regime Diferenciado de Contratação (RDC) e as formas contemporâneas de relacionamentos pré-contratuais, abordando as parcerias publico-privadas (PPP), as manifestações de interesse da iniciativa privada (PMI) e os diálogos concorrenciais. Após uma apresentação do DNIT e do processo de institucionalização do RDC no âmbito da autarquia concluiu-se que três aspectos tem contribuído para minimizar os efeitos do “fator projeto”: O primeiro, de natureza procedimental, está diretamente relacionado com o efeito da implementação do novo regime licitatório. Em projetos complexos, como os da área de infraestrutura, o desenvolvimento de relações pré-contratuais trazem ganhos consideráveis, tanto para Administração Pública quanto para o ente privado, por promover a redução das assimetrias de informação e a lapidação do objeto a ser contratado. O segundo aspecto está relacionado com a natureza do DNIT. Trata-se de uma Autarquia com acúmulo de conhecimentos na área de engenharia e gestão de projetos. Ao adotar intensamente o RDC, mostrou capacidade instalada e avançou nos parâmetros de monitoramento e gestão de risco e gerou um conjunto normativo atual e adequado para enfrentar os desafios do novo regime de contrações. O terceiro aspecto também está relacionado com o aspecto institucional do DNIT. Trata-se de sua estrutura organizacional, que influencia a governança dos processos licitatórios e que agrega dois predicados: segurança na responsabilização entre os diretores-membros quando partilham uma decisão e salvaguarda do corpo técnico para uma postura mais republicana. Estes tres aspectos levaram a uma maior eficácia e efetividade da Autarquia, minimizaram o "fator projeto". O Relatório de Gestão do DNIT de 2012 cita que no RDC há a redução de até 50% no tempo do processo licitatório em relação às modalidades concorrência e Tomada de Preços. A implementação do RDC Eletrônico, que possibilita a participação de empresas de todo o país, aumentou a competitividade e ajudou a executar R$ 10,2 bilhões em obras e serviços em infraestrutura de transportes.